Registered No litigation declared Commercial project

ATN Tower

By M/S BKP CORP

RG-MH-22413 · RERA P52100031115 · Last updated on MahaRERA portal: 23 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 24 months from the original
0 of 11Construction stages donefurthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

ATN Tower is a Commercial project by M/S BKP CORP in Pune, Maharashtra, registered with MahaRERA as P52100031115 on 5 Oct 2021. Possession is promised by 31 Dec 2026. The completion date has moved by 24 months from the original filing.

At a glance

Project

  • NameATN Tower
  • TypeCommercial
  • Location
    • Sinhgad Road
    • Wadgaon BK
    • Haveli
    • Pune
    • 411041
  • Pincode411041
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100031115
  • ReraGenie IDRG-MH-22413

Builder

  • NameM/S BKP CORP
  • Entity typePartnership
  • PartnerAmruta Monish Jadhav
  • Declared earlier projects5 →

Key dates

this monthRegisteredOct 2021First promiseDec 2024Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Oct 2021
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed69 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ATN TowerNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

ATN Tower: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed31

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots31
Closed/Covered29
Open Space2

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,150 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
BKP CORPWadgaon BkPune

Approvals and building plan

Permissible FSI4657.5
Proposed, not sanctioned2,411 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBhargav House Manik Baug Chowk Sinhgad Road Pune

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVILAS YELE
EngineerG A Bhillare and Consultant
Chartered AccountantSPCM & Associates
PartnerRole in project
M/S BKP CORP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100025899Dec 2024 → Dec 2026

Reason as filed by the promoterApplication for Extension of Project completion date under section 7(3) of the Real Estate (Regulation and Development) Act, 2016 The project initially commenced on schedule; however, construction activities slowed down significantly due to the outbreak of the COVID-19 pandemic in 2020. Key challenges included: • Workforce Shortages: Restrictions, health concerns, and quarantine requirements led to a reduced availability of labor. • Supply Chain Disruptions: Transportation restrictions and manufacturing slowdowns caused delays in the procurement of essential materials. With the implementation

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Sep 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Sep 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 31122025.pdf23 May 2026
Form 2File: Form 2 31122025.pdf23 May 2026
Form 3File: Form 3 31122025.pdf23 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold SEPT-DEC 2025.pdf23 May 2026
Form 1File: Form 1 30092025.pdf23 May 2026
Form 2File: Form 2 30092025.pdf23 May 2026
Form 3File: Form 3 30092025.pdf23 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold JUL-OCT 2025.pdf23 May 2026
Form 1File: Form 1 30062025.pdf23 May 2026
Form 2File: Form 2 30062025.pdf23 May 2026
Form 3File: Form 3 30062025.pdf23 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold APR-JUN 2025.pdf23 May 2026
Declaration in FORM BFile: Form B.pdf26 May 2025
Declaration in FORM BFile: Form B 01.pdf26 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Scan2025-05-20_184501.pdf24 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31032025.pdf24 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31-05-2025.pdf24 May 2025
Disclosure of sold/ booked inventoryFile: Quater Jan - March 2023.pdf24 May 2025
Disclosure of sold/ booked inventoryFile: Quater April - Jun 2023.pdf24 May 2025
Disclosure of sold/ booked inventoryFile: Quater July - Sept 2023.pdf24 May 2025
Disclosure of sold/ booked inventoryFile: Quater Oct - Dec 2023.pdf24 May 2025
Disclosure of sold/ booked inventoryFile: Quater Jan - March 2024.pdf24 May 2025
Disclosure of sold/ booked inventoryFile: Quater April - Jun 2024.pdf24 May 2025
Disclosure of sold/ booked inventoryFile: Quater July - Sept 2024.pdf24 May 2025
Disclosure of sold/ booked inventoryFile: Quater Oct - Dec 2024.pdf24 May 2025
Disclosure of sold/ booked inventoryFile: Quater Jan - March 2025.pdf24 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineers Certificate for Quality Assurance 2023 - 2024.pdf24 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Dated 30092024.pdf24 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 BKP Corp Form 1 Architect Certificate 300923.pdf23 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 BKP CORP Form 1 Architect Certificate 311223.pdf23 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 BKP Corp Form 1 Architect Certificate 300324.pdf23 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 BKP Corp Form 1 Architect Certificate 300624.pdf23 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 BKP Corp Form 1 Architect Certificate 300924.pdf23 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 BKP Corp Form 1 Architect Certificate 311224.pdf23 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 BKP Corp FORM 1 Architect Certificate 300623.pdf23 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 Form 3 30092024.pdf23 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7 Form 3 31032025.pdf23 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6 Form 3 31122024.pdf23 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 Form 3 30062024.pdf23 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 31122023.pdf23 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 Form 3 30092023.pdf23 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 Form 3 30062023.pdf23 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineers Certificate 31032023.pdf23 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineers Certificate 30062023.pdf23 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Engineers Certificate 30092023.pdf23 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Engineers Certificate 31122023.pdf23 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Engineer Certificate 31032024.pdf23 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Engineer Certificate 30062024.pdf23 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Engineer Certificate 30092024.pdf23 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 Engineer Certificate 31122024.pdf23 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3BKPCorp.pdf17 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: BKpCorpForm5.pdf17 Apr 2024
Other - TechnicalFile: Undertaking.pdf29 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: BKp Corp Form 5 21-22.pdf27 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AF122.pdf12 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AF1.pdf12 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EF2.pdf12 Apr 2023
Declaration in FORM BFile: Declaration Form-B_compressed pdf.pdf28 Sep 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3 RERA.pdf28 Sep 2021
Layout approvalFile: Plan -1-2- 02082021_compressed_11zon.pdf24 Sep 2021
Building plan approvalFile: Plan -1-2- 02082021_compressed_11zon.pdf24 Sep 2021
PAN CardFile: BKP Corp Pan (2).pdf24 Sep 2021
Copy of the legal title reportFile: RERA Title Certificate as per Form-A_compressed.pdf24 Sep 2021
Details of encumbrancesFile: BKP Corp Declaration Encumbarances.pdf24 Sep 2021
Copy of Layout Approval (in case of layout)File: Plan -1-2- 02082021_compressed_11zon.pdf24 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan -1-2- 02082021_compressed_11zon.pdf24 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: CC-02082021- S No- Wadgaon BK_11zon.pdf24 Sep 2021
Declaration about Commencement CertificateFile: CC Declaration.pdf24 Sep 2021
Proforma of Allotment letterFile: RERA UPLOADED DRAFT.pdf24 Sep 2021

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Vibha 1Manajinagar Narhe Pune32CompletedJun 2018Late, Jul 2019
VivianaPanchavati Nashik92CompletedSep 2017Jul 2017
Ramrajya Sankul A and B WingPanchavati Nashik70CompletedMar 2017Late, Jul 2017
Abelone Wing BAmbegaon Bk Pune64CompletedMar 2016Jan 2016
Bhargav HouseHingane Kh6CompletedMar 2014Mar 2014

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ATN Tower on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wadgaon BK13,700+ in Pune

2 kmATN TowerCompleted 163Lapsed / revoked 119Other 151Dot size: filed unitsN

Filed coordinates, straight-line distance. 433 registered projects within 2 km.

Builder: M/S BKP CORP

M/S BKP CORP has 1 registration on MahaRERA, including ATN Tower. Its filings disclose 5 earlier MahaRERA projects: declares 3 of 5 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ATN Tower is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ATN Tower?

The registered promoter entity is M/S BKP CORP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ATN Tower?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ATN Tower?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ATN Tower?

The professionals named in the filing: Architect: VILAS YELE; Engineer: G A Bhillare and Consultant; Chartered Accountant: SPCM & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ATN Tower?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ATN Tower. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ATN Tower to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.