ATMIYA RESIDENCY

By AKSHAR INFRA

RG-MH-27773 · RERA P51700024195 · Last updated on MahaRERA portal: 22 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 24 months from the original
22 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
113 of 241Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 122 documents Report an error

ATMIYA RESIDENCY is a Residential / Group Housing project by AKSHAR INFRA in Thane, Maharashtra, registered with MahaRERA as P51700024195 on 24 Jan 2020. Possession is promised by 31 Dec 2027. The completion date has moved by 24 months from the original filing. 128 of the 241 units on this registration are recorded sold or booked, and 22 of 33 construction stages are filed complete.

At a glance

Project

  • NameATMIYA RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • SONIVALI
    • AMBERNATH
    • Sonavale
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700024195
  • ReraGenie IDRG-MH-27773

Builder

  • NameAKSHAR INFRA
  • Entity typePartnership
  • PartnersDEEPAKKUMAR RAMANBHAI PATEL, VIPULKUMAR PARSHOTTAMDAS PATEL, BIPINKUMAR AMBALAL PATEL, PRATIKKUMAR CHUNILAL PATEL, RAJENDRAKUMAR NARESHBHAI PATEL, SWAPNILKUMAR BHARATBHAI PATEL

Key dates

this monthRegisteredJan 2020First promiseDec 2025Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Jan 2020
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Dec 2025)
  • Buildings3 building records
  • Documents filed122 files

Current status

53%128 of 241 units booked
18.2%Work done, per cost certificate

Figures as on 22 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WingNA9784084
B-WINGNA9785085
C-WINGNA9772072

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 22 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

A Wing91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B-WING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C-WING18%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed3

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3
Closed/Covered3
BuildingClosed/CoveredTotal
A Wing11
B-WING11
C-WING11

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,750 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
LandownerVillageDistrict
LAXMIBAI M GHAVATBadlapur (M Cl)Thane
BHUSHAN ANANT GHAVATBadlapur (M Cl)Thane
VASNAT KATHOD GHAVATBadlapur (M Cl)Thane
CHITRA A GHAVATBadlapur (M Cl)Thane
ASHOK VITTHAL GHAVATBadlapur (M Cl)Thane
RAMESH KHATHOD GHAVATBadlapur (M Cl)Thane

Approvals and building plan

Sanctioning authorityKULGAON BADLAPUR NAGARPARISHAD
Permissible FSI7897.0
Proposed, not sanctioned7,897 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGreen Lawns Badlapur
Estimated costRs 8.16 cr
Cost incurredRs 1.49 cr
Work done18.2%
BuildingWingEstimatedIncurred
C-WINGNARs 7.50 crRs 1.49 cr
-NARs 65.50 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDestination Architecture Interior Design
ArchitectRAJ ASSOCIATE
EngineerK R Patel & Associates
EngineerRAJ ASSOCIATES
Chartered AccountantH V Patel & Associates
PartnerRole in project
AKSHAR INFRA-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA28012619597Dec 2025 → Dec 2027

Reason as filed by the promoterWe,partners of Akshar Infra want to inform you that the progress of construction for the above mentioned project has been slower than originally scheduled due to slower than anticipated booking and sale of flats.The pace of bookings directly impacts the project's cash flow,which in turn affects the timely mobilization of resources,procurement of materials,and engagement of contractors.Despite our contionus marketing efforts & strategic initiaves to improve sales,market conditiones have remained challenging, reulting in reduced inflows during the relevant period.Due to reduced inflows,we are co

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Jan 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Jan 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jan 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jan 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed122

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 122 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form1 310326.pdf22 May 2026
Withdrawal Update Form 2File: Form 2 310326.pdf22 May 2026
Withdrawal Update Form 3File: Akshar Infra Form 3.pdf22 May 2026
Form 1File: Form 1.pdf25 Feb 2026
Form 2File: Form 2.pdf25 Feb 2026
Form 3File: Form 3.pdf25 Feb 2026
Disclosure of Sold and Booked InventoryFile: Inventory Annexure.pdf25 Feb 2026
Form 1File: Form 1.pdf25 Feb 2026
Form 2File: Form 2.pdf25 Feb 2026
Form 3File: Form 3.pdf25 Feb 2026
Disclosure of Sold and Booked InventoryFile: Inventory Annexure.pdf25 Feb 2026
Form 1File: Form 1.pdf25 Feb 2026
Form 2File: Form 2.pdf25 Feb 2026
Form 3File: Form 3.pdf25 Feb 2026
Disclosure of Sold and Booked InventoryFile: Inventory Annexure.pdf25 Feb 2026
Form 2File: Form 2.pdf25 Feb 2026
Form 3File: Form 3.pdf25 Feb 2026
Form 1File: Form 1.pdf25 Feb 2026
Disclosure of Sold and Booked InventoryFile: Inventory Annexure.pdf25 Feb 2026
Form 1File: Form 1.pdf25 Feb 2026
Form 2File: Form 2.pdf25 Feb 2026
Form 3File: Form 3.pdf25 Feb 2026
Disclosure of Sold and Booked InventoryFile: Inventory Annexure.pdf25 Feb 2026
Form 1File: Form 1.pdf25 Feb 2026
Form 2File: Form 2.pdf25 Feb 2026
Form 3File: Form 3.pdf25 Feb 2026
Disclosure of Sold and Booked InventoryFile: Inventory Annexure.pdf25 Feb 2026
Form 1File: Form 1.pdf25 Feb 2026
Form 2File: Form 2.pdf25 Feb 2026
Form 3File: FORM -3.pdf25 Feb 2026
Disclosure of Sold and Booked InventoryFile: Inventory Annexure.pdf25 Feb 2026
Form 1File: Form 1.pdf25 Feb 2026
Form 2File: Form 2.pdf25 Feb 2026
Form 3File: FORM 3.pdf25 Feb 2026
Disclosure of Sold and Booked InventoryFile: Inventory Annexure.pdf25 Feb 2026
Form 1File: Form-1.pdf25 Feb 2026
Form 2File: Form 2.pdf25 Feb 2026
Form 3File: Form 3.pdf25 Feb 2026
Disclosure of Sold and Booked InventoryFile: Inventory Annexure.pdf25 Feb 2026
Form 1File: Form 1.pdf25 Feb 2026
Form 2File: Form 2.pdf25 Feb 2026
Form 3File: FORM 3.pdf25 Feb 2026
Disclosure of Sold and Booked InventoryFile: Inventory Annexure.pdf25 Feb 2026
Form 2A (FY 2019-2020)File: Form 2A 310320.pdf25 Feb 2026
Form 2A (FY 2020-2021)File: FORM 2A 310321.pdf25 Feb 2026
Form 2A (FY 2021-2022)File: FORM 2A 310322.pdf25 Feb 2026
Form 2A (FY 2022-2023)File: FORM 2A 31032023.pdf25 Feb 2026
Form 2A (FY 2023-2024)File: FORM 2A 310324.pdf25 Feb 2026
Form 2A (FY 2024-2025)File: FORM 2A 31032025.pdf25 Feb 2026
Form 5 (FY 2024-2025)File: FY 24-25.pdf25 Feb 2026
Form 5 (FY 2023-2024)File: FY 23-24.pdf25 Feb 2026
Form 5 (FY 2022-2023)File: FY 22-23.pdf25 Feb 2026
Form 5 (FY 2021-2022)File: FY 21-22.pdf25 Feb 2026
Form 5 (FY 2020-2021)File: FY 20-21.pdf25 Feb 2026
Form 5 (FY 2019-2020)File: Akshar Infra _Form 5_FY 19-20.pdf25 Feb 2026
Form 1File: Form 1.pdf23 Jan 2026
Form 2File: Form-2.pdf23 Jan 2026
Form 3File: FORM-3_.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: Inventory Annexure.pdf23 Jan 2026
Form 1File: Form-1.pdf23 Jan 2026
Form 2File: FORM 2.pdf23 Jan 2026
Form 3File: FORM-3_.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: Inventory Annexure.pdf23 Jan 2026
Form 1File: FORM 1.pdf23 Jan 2026
Form 2File: Form 2.pdf23 Jan 2026
Form 3File: Form 3.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: Annexure -31-12-2022.pdf23 Jan 2026
Form 1File: FORM 1.pdf23 Jan 2026
Form 2File: Form 2.pdf23 Jan 2026
Form 3File: Form 3.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: Inventory Annexure.pdf23 Jan 2026
Form 1File: Form-1.pdf22 Aug 2025
Form 2File: Form 2 30-06-2025.pdf22 Aug 2025
Form 3File: FORM -3.pdf22 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold & Unsold Inventory.pdf22 Aug 2025
Form 1File: FORM 1.pdf23 May 2025
Form 2File: Form 2.pdf23 May 2025
Form 3File: Form 3.pdf23 May 2025
Form 1File: FORM 1.pdf20 May 2025
Form 2File: FORM 2.pdf20 May 2025

How this compares with Thane

53%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 24 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ATMIYA RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AMBERNATH7,600+ in Thane

2 kmATMIYA RESIDENCYCompleted 39Lapsed / revoked 30Other 22Dot size: filed unitsN

Filed coordinates, straight-line distance. 91 registered projects within 2 km.

Builder: AKSHAR INFRA

AKSHAR INFRA has 1 registration on MahaRERA, including ATMIYA RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if ATMIYA RESIDENCY is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ATMIYA RESIDENCY?

The registered promoter entity is AKSHAR INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ATMIYA RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ATMIYA RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ATMIYA RESIDENCY?

The professionals named in the filing: Architect: Destination Architecture Interior Design; Architect: RAJ ASSOCIATE; Engineer: K R Patel & Associates; Engineer: RAJ ASSOCIATES; Chartered Accountant: H V Patel & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ATMIYA RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ATMIYA RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ATMIYA RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.