ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / ATMIYA CROWN

Registered No litigation declared Residential / Group Housing project

ATMIYA CROWN

By ATMIYA REALTY

RG-MH-17916 · RERA P51700056458 · Last updated on MahaRERA portal: 1 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
6 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 75%
263 of 333Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 47 documents Report an error

ATMIYA CROWN is a Residential / Group Housing project by ATMIYA REALTY in Thane, Maharashtra, registered with MahaRERA as P51700056458 on 5 Jun 2024. Possession is promised by 31 Dec 2028. 70 of the 333 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.

At a glance

Project

  • NameATMIYA CROWN
  • TypeResidential / Group Housing
  • Location
    • S. No- 67
    • H. No- 1B
    • Sonavale
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • RERA no.P51700056458
  • ReraGenie IDRG-MH-17916

Builder

  • NameATMIYA REALTY
  • Entity typePartnership
  • PartnersVIPULKUMAR PARSHOTTAMDAS PATEL, DEEPAKKUMAR RAMANBHAI PATEL, BIPIN AMBALAL PATEL, SHRIKRISHNA SARJERO BHUJANG, RAJENDRAKUMAR NARESHBHAI PATEL, PRATIKKUMAR CHUNILAL PATEL, PARSHOTTAMDAS GOVINDBHAI PATEL, PANKAJKUMAR S PATEL

Key dates

this monthRegisteredJun 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Jun 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed47 files

Current status

21%70 of 333 units booked
29.8%Work done, per cost certificate

Figures as on 1 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A- WING ATMIYA CROWNNA151418015195
B- WING ATMIYA CROWNNA15151380138

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 1 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 75%.

A- WING ATMIYA CROWN9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B- WING ATMIYA CROWN63%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 1 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed411

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots411
Closed/Covered73
Open Space338
BuildingClosed/CoveredOpen SpaceTotal
A- WING ATMIYA CROWN34200234
B- WING ATMIYA CROWN39138177

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,450 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
RAJESH MOTIRAM GHAVATSonavaleThane
YOGESH MOTIRAM GHAVATSonavaleThane

Approvals and building plan

Sanctioning authorityKulgoan Badlapur Municipal Council
Permissible FSI16285.53
Proposed, not sanctioned16,286 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK LTD, SHOP NO 1 AND 2, PUSHKAR APT, RAMESH WADI, BADLAPUR GOAN ROAD, BADLAPUR WEST, MAHARASHTRA -421503
Estimated costRs 51.51 cr
Cost incurredRs 15.36 cr
Work done29.81%
BuildingWingEstimatedIncurred
A- WING ATMIYA CROWNNARs 27.50 cr-
B- WING ATMIYA CROWNNARs 21.80 crRs 15.36 cr
-NARs 2.21 cr-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAJ ASSOCIATES
EngineerK R PATEL & ASSOCIATES
Chartered AccountantH V PATEL & ASSOCIATES
PartnerRole in project
ATMIYA REALTY-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed47

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 30092025.pdf1 Jul 2026
Withdrawal Update Form 1File: Form1 31122025.pdf1 Jul 2026
Withdrawal Update Form 1File: Form 1 31032026.pdf1 Jul 2026
Withdrawal Update Form 2File: Form 2 30092025.pdf1 Jul 2026
Withdrawal Update Form 2File: FORM2 31122025.pdf1 Jul 2026
Withdrawal Update Form 2File: Form 2 31032026.pdf1 Jul 2026
Withdrawal Update Form 3File: Form 3 30092025.pdf1 Jul 2026
Withdrawal Update Form 3File: Form331122025.pdf1 Jul 2026
Withdrawal Update Form 3File: Form 3 31032026.pdf1 Jul 2026
Withdrawal Update Form 1File: Form 1 30062025.pdf17 Jun 2026
Withdrawal Update Form 2File: Form 2 30062025.pdf17 Jun 2026
Withdrawal Update Form 3File: FORM 3 June 25.pdf17 Jun 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 June 25.pdf22 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Q1 FY 2025-26.pdf18 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 Atmiya Realty Q1 FY 2025-26.pdf18 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Atmiya Realty Form 3.pdf7 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf22 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer Certificate.pdf22 Apr 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf14 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf23 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 ATMIYA CROWN_11zon.pdf23 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer Certificate.pdf23 Dec 2024
CERSAI detailsFile: Declaration For CERSAI REPORT.pdf25 Apr 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE CERTIFICATION with respect to LEGAL.pdf12 Apr 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCE CERTIFICATION with respect to LEGAL.pdf12 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 Atmiya Realty Resubmission COMPRESSED.pdf12 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Atmiya Realty F.pdf12 Apr 2024
Other - LegalFile: Legal title Atmiya Realty.pdf12 Apr 2024
Other - TechnicalFile: Order No 50 Atmiya Realty.pdf12 Apr 2024
Proforma of Allotment letterFile: Draft Allotment letter Final.pdf18 Mar 2024
Deviation Report with respect to model copy of AgreementFile: 38 DEVIATION IN modal copy of AGRRMENT.pdf18 Mar 2024
Layout approvalFile: 5 PLOT LAYOUT.pdf16 Mar 2024
Building plan approvalFile: 6 BUILDING PLAN ATMIYA CROWN.pdf16 Mar 2024
PAN CardFile: 1 Atmiya Realty PAN CARD.pdf16 Mar 2024
Copy of the legal title reportFile: 2 Legal Title Report ATMIYA REALTY.pdf16 Mar 2024
Details of encumbrances concerned to FinanceFile: 3 ENCUMBRANCE CERTIFICATION MERGED FINANCE AND LEGAL - Copy.pdf16 Mar 2024
Details of encumbrances concerned to LegalFile: 3 ENCUMBRANCE CERTIFICATION MERGED FINANCE AND LEGAL - Copy.pdf16 Mar 2024
Copy of Layout Approval (in case of layout)File: 5 PLOT LAYOUT.pdf16 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 6 BUILDING PLAN ATMIYA CROWN.pdf16 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: 7 Commencement Certificate.pdf16 Mar 2024
Declaration about Commencement CertificateFile: 8 DECLARATION ABT COMMENCEMENT CERTIFICATE.pdf16 Mar 2024
Declaration in FORM BFile: 9 FORM 'B' PRAKASH R PATEL.pdf16 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 FORM 1 ARCHITECH CERTIFICATE ATMIYA CROWN.pdf16 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 FORM 2 ENGINEER CERTIFICATE ATMIYA CROWN.pdf16 Mar 2024
Proforma of Agreement for saleFile: 25 Proforma AGREEMENT FOR SALE.pdf16 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 36 FORMAT 'A' Seperate Bank Ac Details.pdf16 Mar 2024
Deviation Report with respect to Allotment letterFile: 37 DEVIATION IN Respect of ALLOTMENT.pdf16 Mar 2024

How this compares with Thane

21%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ATMIYA CROWN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near H. No- 1B7,600+ in Thane

Builder: ATMIYA REALTY

ATMIYA REALTY has 1 registration on MahaRERA, including ATMIYA CROWN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if ATMIYA CROWN is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ATMIYA CROWN?

The registered promoter entity is ATMIYA REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ATMIYA CROWN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ATMIYA CROWN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ATMIYA CROWN?

The professionals named in the filing: Architect: RAJ ASSOCIATES; Engineer: K R PATEL & ASSOCIATES; Chartered Accountant: H V PATEL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ATMIYA CROWN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ATMIYA CROWN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ATMIYA CROWN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.