Home / Browse projects / Atlas Royal B
Atlas Royal B
RG-MH-65503 · RERA P51900015871 · Last updated on MahaRERA portal: 19 Oct 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- Completion date moved by 36 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Atlas Royal B is a Residential / Group Housing project by Atlas Infratech Pvt.Ltd in Girgaon Charni Road East, 400004, registered with MahaRERA as P51900015871 on 28 Mar 2018. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 36 months from the original filing.
At a glance
Project
- NameAtlas Royal B
- TypeResidential / Group Housing
- Location
- Mugbhat Lane
- Girgaon Charni Road East
- 400004
- Pincode400004
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900015871
- ReraGenie IDRG-MH-65503
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on28 Mar 2018
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 30 Dec 2022)
- Buildings1 building record
- Documents filed85 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Atlas Royal B | NA | 22 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 19 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 23%.
Atlas Royal B: 57% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 1% |
| Podiums (if any) | 0% |
| Plinth | 1% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 23% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities16
As on 19 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 85% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
| Tower Parking Mechanism | Yes | 85% |
Parking filed28
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mr Vijay Kabre |
| Architect | Vijay Jayavant Kabre |
| Engineer | Mr Anant Shintre |
| Engineer | Vijay Jayavant Kabre |
| Chartered Accountant | MrVikrant Basutkar & Associates |
| Chartered Accountant | Ashwin Girjashankar Oza |
| Chartered Accountant | Vikrant Manohar Basutkar |
| Partner | Role in project |
|---|---|
| Atlas Infratech Pvt.Ltd | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterCar Parking Work and O.C. and Compound work is pending rest construction related work has been Completed and requested for a Extension for Car parking Work to be completed and O.C. has to be applied after that
Reason as filed by the promoterParking Area is Pending and O.C. is Pending within a due Course of time
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Mar 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Mar 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Mar 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Jun 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed85
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of CA (Form 3)File: FORM-3 B WING_compressed.pdf | 19 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Atlas Bwing 10-10-2024.pdf | 19 Oct 2024 |
| Certificates of CA (Form 3)File: FORM-3 B WING_compressed.pdf | 19 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Atlas Bwing 10-10-2024.pdf | 19 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Atlas Bwing 10-10-2024.pdf | 19 Oct 2024 |
| Certificates of CA (Form 3)File: FORM-3 B WING_compressed.pdf | 19 Oct 2024 |
| Certificates of CA (Form 3)File: CA - Final.pdf | 17 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect - Final.pdf | 17 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer - Final.pdf | 17 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf | 17 Oct 2024 |
| Certificates of CA (Form 3)File: CA - Final.pdf | 17 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect - Final.pdf | 17 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer - Final.pdf | 17 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf | 17 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect - Final.pdf | 17 Oct 2024 |
| Certificates of CA (Form 3)File: CA - Final.pdf | 17 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer - Final.pdf | 17 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf | 17 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certiificate B Wing B Wing 31st March 2024_0001 - converted.pdf | 6 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certiificate B Wing 30th June 2024_0001 - converted.pdf | 6 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A-23-24 B Wing.pdf | 6 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A-22-23 B Wing.pdf | 6 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng-Jun-24-B Wing.pdf | 6 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng-Mar-24 B Wing.pdf | 6 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Form 5 FY 24 B Wing.pdf | 6 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certiificate B Wing B Wing 31st March 2024_0001 - converted.pdf | 6 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certiificate B Wing 30th June 2024_0001 - converted.pdf | 6 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A-23-24 B Wing.pdf | 6 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A-22-23 B Wing.pdf | 6 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng-Jun-24-B Wing.pdf | 6 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng-Mar-24 B Wing.pdf | 6 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Form 5 FY 24 B Wing.pdf | 6 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certiificate B Wing B Wing 31st March 2024_0001 - converted.pdf | 6 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certiificate B Wing 30th June 2024_0001 - converted.pdf | 6 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng-Jun-24-B Wing.pdf | 6 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng-Mar-24 B Wing.pdf | 6 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A-22-23 B Wing.pdf | 6 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A-23-24 B Wing.pdf | 6 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Form 5 FY 24 B Wing.pdf | 6 Oct 2024 |
| Declaration in FORM BFile: Form- B Atlas Royal B Wing.pdf | 12 Jul 2024 |
| CERSAI detailsFile: CERSAI DECLARATION For Atlas Royal B.pdf | 25 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other real estate organization Atlas Royal B.pdf | 25 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 B Wing FY 23.pdf | 18 Oct 2023 |
| Details of encumbrances concerned to FinanceFile: Title Certificate.pdf | 24 Mar 2023 |
| Details of encumbrances concerned to LegalFile: Title Certificate.pdf | 24 Mar 2023 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE ATLAS ROYAL B.pdf | 24 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer Certificate Form 2 Atlas Royal B 2019-20.pdf | 24 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form5.pdf | 24 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Atlas Royal B Wing.pdf | 24 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Atlas Royal B Wing.pdf | 24 Mar 2023 |
| Proforma of Agreement for saleFile: Draft Agreement For Sale.pdf | 24 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engg Cert.pdf | 14 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engg Cert.pdf | 14 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 14 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Cert.pdf | 6 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Completion Certificate B wing - Architect.pdf | 6 Jun 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: B Wing - Mar 20 Form 5.pdf | 7 Dec 2021 |
| Certificates of CA (Form 3)File: Form 3 - B - 15 Jun 2021.pdf | 15 Jun 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 25 Jun 2019 |
| Certificates of CA (Form 5)File: Atlas Royal B Form 5.pdf | 25 Mar 2019 |
| Building plan approvalFile: 180323120630_0001.pdf | 24 Mar 2018 |
| Building plan approvalFile: 180323120737_0001.pdf | 24 Mar 2018 |
| Layout approvalFile: Layout.pdf | 24 Mar 2018 |
| Building plan approvalFile: IOD.pdf | 24 Mar 2018 |
| Building plan approvalFile: 180323120409_0001.pdf | 24 Mar 2018 |
| Building plan approvalFile: 180323120450_0001.pdf | 24 Mar 2018 |
| Building plan approvalFile: 180323120515_0001.pdf | 24 Mar 2018 |
| Building plan approvalFile: 180323120613_0001.pdf | 24 Mar 2018 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 24 Mar 2018 |
| Building Plan Approval (IOD)File: IOD.pdf | 24 Mar 2018 |
| Building Plan Approval (IOD)File: 180323120409_0001.pdf | 24 Mar 2018 |
| Building Plan Approval (IOD)File: 180323120450_0001.pdf | 24 Mar 2018 |
| Building Plan Approval (IOD)File: 180323120515_0001.pdf | 24 Mar 2018 |
| Building Plan Approval (IOD)File: 180323120613_0001.pdf | 24 Mar 2018 |
| Building Plan Approval (IOD)File: 180323120630_0001.pdf | 24 Mar 2018 |
| Building Plan Approval (IOD)File: 180323120737_0001.pdf | 24 Mar 2018 |
| Declaration in FORM BFile: Form B.pdf | 24 Mar 2018 |
| PAN CardFile: Atlas - Pan Card.pdf | 8 Mar 2018 |
| Copy of the legal title reportFile: Title Clearance Certificate.pdf | 8 Mar 2018 |
| Details of encumbrancesFile: Title Clearance Certificate.pdf | 8 Mar 2018 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Atlas Royal | Sita Niwas Co-Operative Hsg.Ltd Mugbhat Cross Lane Girgaon Mumbai 400 004 | 1 | Completed | Dec 2017 | Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 85 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Atlas Royal B on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Girgaon Charni Road East
Filed coordinates, straight-line distance. 70 registered projects within 2 km.
SHREEPATI CASTLE
SHREEPATI CASTLE
Meadows
Celestial Globe (A.O.P.)
SHREEPATI BAYVIEW
SHREEPATI BUILD INFRA INVESTMENT LIMITED
NAKODA MEHTA SUNSHINE HEIGHTS A AND C WINGS
CHANDULAL JORAVARMALJI MEHTA
Earth Enclave
Earth Graphics
Chandan Signature
PAVAN KUMAR BACHHRAJ CHANDAN
Builder: Atlas Infratech Pvt.Ltd
Atlas Infratech Pvt.Ltd has 3 registrations on MahaRERA, including Atlas Royal - A and Atlas Royal B. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record.
Frequently asked questions
What does it mean that Atlas Royal B shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Atlas Royal B is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Atlas Royal B?
The registered promoter entity is Atlas Infratech Pvt.Ltd, a company as per the filing. Its CIN U70102MH2009PTC192732 and GSTIN 27AAICA0003E1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Atlas Royal B?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Atlas Royal B?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Atlas Royal B?
The professionals named in the filing: Architect: Mr Vijay Kabre; Architect: Vijay Jayavant Kabre; Engineer: Mr Anant Shintre; Engineer: Vijay Jayavant Kabre; Chartered Accountant: MrVikrant Basutkar & Associates; Chartered Accountant: Ashwin Girjashankar Oza. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Atlas Royal B?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback