Home / Browse projects / Pune, Maharashtra / ATLANTE

Registered No litigation declared Others project

ATLANTE

By PYRAMID INFRAVENTURE LLP

RG-MH-96172 · RERA P52100016663 · Last updated on MahaRERA portal: 1 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 24 months from the original
27 of 44Construction stages doneacross 4 buildings; furthest along: Basement (if any), 75%
0Complaints at MahaRERAon this registration
Jump to the 180 documents Report an error

ATLANTE is a Others project by PYRAMID INFRAVENTURE LLP in Pune, Maharashtra, registered with MahaRERA as P52100016663 on 5 Jun 2018. Possession is promised by 30 Dec 2027. The completion date has moved by 24 months from the original filing.

At a glance

Project

  • NameATLANTE
  • TypeOthers
  • Location
    • PUNE MUMBAI EXPRESSWAY
    • NEAR TO AKSHAR ELEMENTA
    • Tathwade
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100016663
  • ReraGenie IDRG-MH-96172

Builder

  • NamePYRAMID INFRAVENTURE LLP
  • Entity typeCompany
  • GSTIN27AAUFP5143K1ZM

Key dates

this monthRegisteredJun 2018First promiseDec 2025Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Jun 2018
  • Promised completion30 Dec 2027
  • Revised completionRevised to 30 Dec 2027 (originally 30 Dec 2025)
  • Buildings4 building records
  • Documents filed180 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING BNA240000
BUILDING CNA250000
SHOPSNA10000
BUILDING ANA290000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 1 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

27 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Basement (if any), at 75%.

BUILDING B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING C100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SHOPS40%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING A50%
ActivityProgress
Excavation100%
Basement (if any)75%
Podiums (if any)75%
Plinth75%
Stilt Floor100%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities22

As on 1 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes60%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes70%
Landscaping & Tree PlantingYes80%
Street LightingYes60%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes70%
Energy managemcntYes70%
Fire protection and fire safety requirementsYes60%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes50%
SWIMMING POOLYes100%
TEMPLENoNot applicable
PARTY LAWNYes100%
GYMYes100%
CLUB HOUSEYes100%
CHILDREN PLAY AREAYes100%
AMPHI THEATHERYes100%

Parking filed111

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots111
Closed/Covered111
BuildingClosed/CoveredTotal
BUILDING B5353
BUILDING C5757
BUILDING A11

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,200 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
PRASAD PRADIP TATAWARPune (M Corp.)Pune
NIVRUTTI SUDAM NAVALEPimpri Chinchawad (M Corp.)Pune
Deepak Vilasrao JagtapKothrudPune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI39919.58
Proposed, not sanctioned39,920 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSTATE BANK OF INDIA, PIMPRI BRANCH, PUNE

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSIDDARTH HARISCHANDRAKAR
EngineerPravin Wadje
Chartered AccountantCA Sonal Mahbubani
PartnerRole in project
PYRAMID INFRAVENTURE LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100017130Dec 2025 → Dec 2026

Reason as filed by the promotera. Due to Covid 19 (Corona Virus) pandemic, reverse migration of laborers to their native places, break in supply chain of construction material and due to which the construction activities of the said projects was highly impacted. b. To tackle the impact of Covid 19 (Corona Virus) pandemic, we strategically decided to complete one-by-one buildings construction work in the said project to avoid additional burden. Accordingly, we have clearly communicated to our unit/flat purchasers about that extra time may take to completion of building A & C. c. Thereafter, we are also facing problem of dela

EXT52100025206Dec 2025 → Dec 2027

Reason as filed by the promoterDue delay in obtaining revised sanction from competent authority and environment clearance, we need to take extension for project completion considering the further timelines. We have already completed two building and obtained occupation certificate. Our project construction will be complete before time but considering the timelines for completion certificate and other permissions we decided to avail extension. So we request you to grant us extension for project completion date.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 May 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 May 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 16 Jun 2022

Documents filed180

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 180 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1 SEP 2024 ATLANTE.pdf1 Jul 2026
Form 2File: FORM 2 ATLANTE.pdf1 Jul 2026
Form 3File: FORM 3 ATLANTE DEC 2024_compressed.pdf1 Jul 2026
Disclosure of Sold and Booked InventoryFile: FORM 2 ATLANTE.pdf1 Jul 2026
Form 2A (FY 2021-2022)File: Form 2A- Quality Assurance - Atlante.pdf1 Jul 2026
Form 1File: Form 1- Architect Certificate- Quaterly- June 2023.pdf11 Jun 2026
Form 2File: Form 2- Engineer Certificate- AtLante.pdf11 Jun 2026
Form 3File: FORM 3 infraventure June 23_compressed.pdf11 Jun 2026
Disclosure of Sold and Booked InventoryFile: DISC OF SOLD INVENTORY JUNE 2023 ATLANTE c.pdf11 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold unsold inventory Atlante sep 2023 c.pdf11 Jun 2026
Form 1File: FORM 1 SEP 2024 ATLANTE.pdf11 Jun 2026
Form 2File: FORM 2 SEP 2024 ATLANTE.pdf11 Jun 2026
Form 3File: FORM 3 SEP 2024 ATLANTE RERA compressed.pdf11 Jun 2026
Form 1File: Form 1_Atlante_Dec 23.pdf11 Jun 2026
Form 2File: Form 2 Atlante Dec 23.pdf11 Jun 2026
Form 3File: Form 3 Dec 23 Pyramid Infraventure LLP.pdf11 Jun 2026
Disclosure of Sold and Booked InventoryFile: Atlante_Disclosure of sold unsold - Dec 23_compressed.pdf11 Jun 2026
Form 1File: Pyramid Infraventure LLP-Form 1- mar 24_compressed.pdf11 Jun 2026
Form 3File: Form 3 Pyramid Infraventure LLP Q4001.pdf11 Jun 2026
Form 2File: Pyramid Infraventure LLP-Form 2 - mar 24.pdf11 Jun 2026
Disclosure of Sold and Booked InventoryFile: Pyramid Atlante - disclosure of sold unsold - mar 24.pdf11 Jun 2026
Form 1File: FORM 1 SEP 2024 ATLANTE.pdf11 Jun 2026
Form 2File: FORM 2 SEP 2024 ATLANTE.pdf11 Jun 2026
Form 3File: FORM 3 SEP 2024 ATLANTE RERA_compressed.pdf11 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory Sept 2024 Atlante.pdf11 Jun 2026
Form 1File: Form-1-March-2025 Atlante.pdf11 Jun 2026
Form 2File: FORM -2 PYRAMID INFRAVENTURE LLP-MARCH-2025.pdf11 Jun 2026
Form 3File: FORM-3 PYRAMID IINFRAVENTURE LLP MARCH-2025_compressed.pdf11 Jun 2026
Disclosure of Sold and Booked InventoryFile: ATLANTE SOLD UNSOLD RERA MAR-2025_compressed.pdf11 Jun 2026
Form 1File: FORM 1 ATLANTE JUNE-2025.pdf11 Jun 2026
Form 2File: FORM-2 ATLANTE JUNE-2025.pdf11 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventary Total Project_compressed.pdf11 Jun 2026
Form 3File: FORM 3 ATLANTE JUNE-2025_compressed.pdf11 Jun 2026
Form 2A (FY 2022-2023)File: Form 2A FY2022-23.pdf11 Jun 2026
Form 2A (FY 2024-2025)File: Form 2A mar 2024 Infraventure.pdf11 Jun 2026
Form 2A (FY 2023-2024)File: Form 2A sep 2023 pyramid Atlante.pdf11 Jun 2026
Form 5 (FY 2022-2023)File: FORM 5 INFRAVENTURE 2022-23_compressed.pdf11 Jun 2026
Form 5 (FY 2023-2024)File: Form 5 Atlante 2023-24_compressed.pdf11 Jun 2026
Form 5 (FY 2018-2019)File: Form 5 FY 201819 INFRAVENTURE.pdf11 Jun 2026
Form 5 (FY 2020-2021)File: Form 5 FY 202021 INFRAVENTURE.pdf11 Jun 2026
Form 5 (FY 2021-2022)File: Form 5 FY 202122 INFRAVENTURE.pdf11 Jun 2026
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1-March-2025 Atlante.pdf19 Apr 2025
Certificates of CA (Form 3)File: FORM-3 PYRAMID IINFRAVENTURE LLP MARCH-2025_compressed.pdf19 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM -2 PYRAMID INFRAVENTURE LLP-MARCH-2025.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: ATLANTE SOLD UNSOLD RERA MAR-2025_compressed.pdf19 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1-ATLANTE-DEC-2024.pdf11 Mar 2025
Certificates of CA (Form 3)File: FORM 3 ATLANTE DEC 2024_compressed.pdf1 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ATLANTE.pdf1 Feb 2025
Certificates of CA (Form 3)File: FORM 3 ATLANTE DEC 2024_compressed.pdf1 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ATLANTE.pdf1 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: Commeincement Certificate2024.pdf15 Nov 2024
Declaration about Commencement CertificateFile: Declaration about commiencement Certififcate.pdf15 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: Commeincement Certificate2024.pdf15 Nov 2024
Declaration about Commencement CertificateFile: Declaration about commiencement Certififcate.pdf15 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Atlante 2023-24_compressed.pdf14 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Atlante 2023-24_compressed.pdf14 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 SEP 2024 ATLANTE.pdf25 Oct 2024
Certificates of CA (Form 3)File: FORM 3 SEP 2024 ATLANTE RERA compressed.pdf25 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 SEP 2024 ATLANTE.pdf25 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 SEP 2024 ATLANTE.pdf25 Oct 2024
Certificates of CA (Form 3)File: FORM 3 SEP 2024 ATLANTE RERA compressed.pdf25 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 SEP 2024 ATLANTE.pdf25 Oct 2024
Certificates of CA (Form 3)File: Form 3_Atlante_June 2024_compressed.pdf9 Aug 2024
Disclosure of sold/ booked inventoryFile: Disc of Sold Booked Inventary_Atlante.pdf10 Jun 2024
Certificates of CA (Form 3)File: Form 3 Pyramid Infraventure LLP Q4001_compressed.pdf5 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Pyramid Infraventure LLP-Form 2A - mar 24.pdf6 May 2024
Disclosure of sold/ booked inventoryFile: Pyramid Atlante - disclosure of sold unsold - mar 24.pdf6 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Pyramid Infraventure LLP-Form 1- mar 24_compressed.pdf18 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Pyramid Infraventure LLP-Form 2 - mar 24.pdf18 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Pyramid Infraventure LLP-Form 2A - mar 24.pdf18 Apr 2024
Layout approvalFile: HPSC1036_compressed (1).pdf11 Mar 2024
Copy of Layout Approval (in case of layout)File: HPSC1036_compressed (1).pdf11 Mar 2024
Certificates of CA (Form 3)File: pyramid Infraventure LLP- Form 3- dec 23_compressed.pdf6 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Atlante_Dec 23.pdf21 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Atlante Dec 23.pdf21 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A _Atlante_Dec 23.pdf21 Jan 2024
Disclosure of sold/ booked inventoryFile: Atlante_Disclosure of sold unsold - Dec 23_compressed.pdf21 Jan 2024
Layout approvalFile: HPSC0679_compressed.pdf27 Dec 2023
Copy of Layout Approval (in case of layout)File: HPSC0679_compressed.pdf27 Dec 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory - Atlante - sep 23_compressed.pdf20 Oct 2023

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ATLANTE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR TO AKSHAR ELEMENTA13,700+ in Pune

2 kmATLANTECompleted 127Lapsed / revoked 42Other 80Dot size: filed unitsN

Filed coordinates, straight-line distance. 249 registered projects within 2 km.

Builder: PYRAMID INFRAVENTURE LLP

PYRAMID INFRAVENTURE LLP has 1 registration on MahaRERA, including ATLANTE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ATLANTE is delayed beyond 30 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ATLANTE?

The registered promoter entity is PYRAMID INFRAVENTURE LLP, a company as per the filing. Its GSTIN 27AAUFP5143K1ZM can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ATLANTE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ATLANTE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ATLANTE?

The professionals named in the filing: Architect: SIDDARTH HARISCHANDRAKAR; Engineer: Pravin Wadje; Chartered Accountant: CA Sonal Mahbubani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ATLANTE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ATLANTE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ATLANTE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.