Home / Browse projects / Thane, Maharashtra / ATLANTAA ENCLAVE - II

Registered No litigation declared Others project

ATLANTAA ENCLAVE - II

By ATLANTAA LIMITED

RG-MH-23193 · RERA P51700077788 · Last updated on MahaRERA portal: 30 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
13 of 44Construction stages doneacross 4 buildings; furthest along: Excavation, 98%
280 of 310Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

ATLANTAA ENCLAVE - II is a Others project by ATLANTAA LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700077788 on 30 Oct 2024. Possession is promised by 31 Dec 2028. 30 of the 310 units on this registration are recorded sold or booked, and 13 of 44 construction stages are filed complete.

At a glance

Project

  • NameATLANTAA ENCLAVE - II
  • TypeOthers
  • Location
    • SURVEY NO 67/B/1
    • 67/B/2
    • 67/B/3
    • 67/B/4
    • 67/B/5
    • SHIL
    • SHILPHATA
    • SHILPHATA
    • THANE
    • Thane (M Corp.)
    • Thane
    • 400612
  • Pincode400612
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700077788
  • ReraGenie IDRG-MH-23193

Builder

  • NameATLANTAA LIMITED
  • Entity typeCompany
  • Managing DirectorRickiin Rajhoo Bbarot
  • Declared earlier projects2 →

Key dates

this monthRegisteredOct 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on30 Oct 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings4 building records
  • Documents filed63 files

Current status

10%30 of 310 units booked
12.4%Work done, per cost certificate

Figures as on 30 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TYPE A1NA17131560156
TYPE A2NA17131001101
TYPE C1NA141346551
TYPE C2NA22022

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 30 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

13 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Excavation, at 98%.

TYPE A118%
ActivityProgress
Excavation98%
Basement (if any)0%
Podiums (if any)0%
Plinth95%
Stilt Floor5%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE A218%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE C133%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure52%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE C281%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 30 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes30%
Water SupplyYes30%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsYes30%
Landscaping & Tree PlantingYes30%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes30%
Solid Waste Management And DisposalYes30%
Water conservation /Rain water harvestingYes30%
Energy managemcntYes30%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes30%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed831

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots831
Closed/Covered264
Open Space567
BuildingClosed/CoveredOpen SpaceTotal
TYPE A1103213316
TYPE A283175258
TYPE C159127186
TYPE C2195271

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area16,689 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Mar 2026

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI101951.34
Proposed, not sanctioned26,791 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGr. Floor, Shop No. 1 & 2nd Floor, Office no. 205, “Dynasty Business Park”, “A” wing of Building no. 2, Plot bearing CS No. 57, 58, 14, 11 &13, Andheri Kurla road, Andheri – east, Mumbai 400059
Estimated costRs 381.08 cr
Cost incurredRs 47.33 cr
Work done12.42%
BuildingWingEstimatedIncurred
TYPE A1NARs 215.74 crRs 26.71 cr
TYPE A2NARs 107.28 crRs 13.25 cr
TYPE C1NARs 54.25 crRs 6.63 cr
TYPE C2NARs 3.80 crRs 73.55 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architect10 FOLDS ARCHITECTS & CONSULTANTS
EngineerPRAVINKUMAR SHRIVASTWA
Chartered AccountantPUNIT GUPTA
PartnerRole in project
ATLANTAA LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 31-03-2026.pdf30 Apr 2026
Withdrawal Update Form 2File: form 2 31-03-2026.pdf30 Apr 2026
Withdrawal Update Form 3File: Form 3 31-03-2026.pdf30 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A.pdf30 Apr 2026
Withdrawal Update Form 1File: form 1.pdf23 Jan 2026
Withdrawal Update Form 1File: form 1.pdf23 Jan 2026
Withdrawal Update Form 1File: form 1.pdf23 Jan 2026
Withdrawal Update Form 2File: ENG.pdf23 Jan 2026
Withdrawal Update Form 2File: ENG.pdf23 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf23 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf23 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf23 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf23 Jan 2026
Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf1 Nov 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf1 Nov 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf1 Nov 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD.pdf1 Nov 2025
Form 1File: FORM 1.pdf21 Jul 2025
Form 2File: FORM 2.pdf21 Jul 2025
Form 3File: FORM 3.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf21 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf25 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD - UNSOLD INVENTORY.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Revised Engineer Certificate (Oct 24-Dec 24) (1).pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Revised Engineer Certificate (Oct 24-Dec 24) (1).pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architechts Certificate (Oct 24-Dec 24).pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certifiate form 03 (Oct 24-Dec 24).pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate 3 (Oct 24-Dec24).pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architechts Certificate (Oct 24-Dec 24).pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certifiate form 03 (Oct 24-Dec 24).pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate 3 (Oct 24-Dec24).pdf17 Jan 2025
Other - TechnicalFile: Annexure A order no 50.pdf17 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA COMP.pdf12 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG.pdf12 Oct 2024
CERSAI detailsFile: CERSAI Report_merged.pdf11 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A (2).pdf11 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: DISCLOSURE OF SECURED UNSECURED LOAN.pdf10 Oct 2024
PAN CardFile: ATLANTAA LTD -NEW PAN CARD.pdf9 Oct 2024
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE TO LEGAL AND FINANCE.pdf9 Oct 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT CC.pdf9 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A - BANK LETTER.pdf9 Oct 2024
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE TO LEGAL AND FINANCE.pdf9 Oct 2024
Building plan approvalFile: FLOOR PLANS 8-10.pdf8 Oct 2024
Building plan approvalFile: FLOOR PLANS 5-7.pdf8 Oct 2024
Building plan approvalFile: FLOOR PLANS 2-4.pdf8 Oct 2024
Layout approvalFile: LAYOUT PLAN.pdf8 Oct 2024
Copy of the legal title reportFile: Title Report.pdf8 Oct 2024
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf8 Oct 2024
Proforma of Allotment letterFile: Allotment Letter with Sign.pdf8 Oct 2024
Declaration in FORM BFile: Revised Form B.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate (2).pdf8 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf8 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: FLOOR PLANS 5-7.pdf8 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: FLOOR PLANS 2-4.pdf8 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: FLOOR PLANS 8-10.pdf8 Oct 2024
Deviation Report with respect to Allotment letterFile: No Deviation Allotment Letter.pdf8 Oct 2024
Deviation Report with respect to model copy of AgreementFile: No Deviation Agreement for sale.pdf8 Oct 2024
Proforma of Agreement for saleFile: AFS.pdf8 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Bank Letterhead.pdf8 Oct 2024

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SHRIKANT CHAMBERS IIChembur13CompletedJan 2019Jan 2019
Atlantaa IShilphate Thane100CompletedApr 2017Apr 2017

How this compares with Thane

10%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ATLANTAA ENCLAVE - II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHILPHATA, THANE7,600+ in Thane

2 kmATLANTAA ENCLAVE - IICompleted 25Lapsed / revoked 11Other 38Dot size: filed unitsN

Filed coordinates, straight-line distance. 74 registered projects within 2 km.

Builder: ATLANTAA LIMITED

ATLANTAA LIMITED has 1 registration on MahaRERA, including ATLANTAA ENCLAVE - II. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if ATLANTAA ENCLAVE - II is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ATLANTAA ENCLAVE - II?

The registered promoter entity is ATLANTAA LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ATLANTAA ENCLAVE - II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ATLANTAA ENCLAVE - II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ATLANTAA ENCLAVE - II?

The professionals named in the filing: Architect: 10 FOLDS ARCHITECTS & CONSULTANTS; Engineer: PRAVINKUMAR SHRIVASTWA; Chartered Accountant: PUNIT GUPTA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ATLANTAA ENCLAVE - II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ATLANTAA ENCLAVE - II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ATLANTAA ENCLAVE - II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.