ATLANTA SQUARE
RG-MH-95450 · RERA P52100054714 · Last updated on MahaRERA portal: 2 Jul 2026
Source: official MahaRERA filing
Red flags
- Completion date moved by 4 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ATLANTA SQUARE is a Others project by UTTAM ASSOCIATE in Pune, Maharashtra, registered with MahaRERA as P52100054714 on 6 Feb 2024. The registration is recorded completed; possession was promised by 30 Apr 2026. The completion date has moved by 4 months from the original filing. 41 of the 41 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.
At a glance
Project
- NameATLANTA SQUARE
- TypeOthers
- Location
- TALEGAOUN NAGARPARISAD ROAD
- LAXMIBAG COLONY
- Talegaon Dabhade (M Cl)
- Mawal
- Pune
- 410506
- Pincode410506
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100054714
- ReraGenie IDRG-MH-95450
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on6 Feb 2024
- Promised completion30 Apr 2026
- Revised completionRevised to 30 Apr 2026 (originally 31 Dec 2025)
- Buildings1 building record
- Documents filed73 files
Current status
Figures as on 2 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ATLANTA SQUARE | NA | 9 | 8 | 13 | 28 | 41 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 2 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 80%.
ATLANTA SQUARE: 78% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities15
As on 2 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed108
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| ATLANTA SQUARE | NA | Rs 4.77 cr | Rs 3.34 cr |
| - | NA | Rs 18.14 lakh | Rs 7.61 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | BRAHMA ASSOCIATES |
| Engineer | prabhulal chothani PRABHULAL CHOTHANI |
| Chartered Accountant | Nikunj S Shah & Associates |
| Chartered Accountant | priyesh jain |
| Chartered Accountant | Nilesh Raut |
| Partner | Role in project |
|---|---|
| UTTAM ASSOCIATE | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe are applying for Extension of our Project Completion Date with MahaRERA Authority under Section - 7(3) of the Act. We would like to inform the Authority that the development on site is under process and is expected to be completed in next 1 to 2 months and then will require another 1 months to fulfil Sanction Authorities formalities and receive the completion certificate for the project. After conveying the same to the allottees, it was mutually decided to apply for an extension with the Authority. Hence, we request you to extend proposed date of completion for the Project from 31/12/2025 t
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Jan 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Mar 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Nov 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed73
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form-1 Architect Certificate 31122025.pdf | 2 Jul 2026 |
| Withdrawal Update Form 1File: Form-1 Architect Certificate 31122025.pdf | 2 Jul 2026 |
| Withdrawal Update Form 2File: Form-2 Engineer Certificate 31122025.pdf | 2 Jul 2026 |
| Withdrawal Update Form 2File: Form-2 Engineer Certificate 31122025.pdf | 2 Jul 2026 |
| Withdrawal Update Form 3File: Form-3 CA Certificate 31122025 Sign v_compressed.pdf | 2 Jul 2026 |
| Withdrawal Update Form 3File: Form-3 CA Certificate 31122025 Sign v_compressed.pdf | 2 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form-2A 24-25.pdf | 2 Jul 2026 |
| Occupational CertificateFile: Occupancy Certificate 12012026.pdf | 2 Jul 2026 |
| Layout approvalFile: Sanction Plan 31122025.pdf | 24 Mar 2026 |
| Withdrawal Update Form 1File: Form-1 Architect Certificate 30062025.pdf | 24 Feb 2026 |
| Withdrawal Update Form 1File: Form-1 Architect Certificate 30062025.pdf | 24 Feb 2026 |
| Withdrawal Update Form 1File: Form-1 Architect Certificate 30092025.pdf | 24 Feb 2026 |
| Withdrawal Update Form 1File: Form-1 Architect Certificate 31122025.pdf | 24 Feb 2026 |
| Withdrawal Update Form 2File: Form-2 Engineer Certificate 30062025.pdf | 24 Feb 2026 |
| Withdrawal Update Form 2File: Form-2 Engineer Certificate 30062025.pdf | 24 Feb 2026 |
| Withdrawal Update Form 2File: Form-2 Engineer Certificate 30092025.pdf | 24 Feb 2026 |
| Withdrawal Update Form 2File: Form-2 Engineer Certificate 31122025.pdf | 24 Feb 2026 |
| Withdrawal Update Form 3File: Form-3 CA Certificate 30062025 Sign v_compressed.pdf | 24 Feb 2026 |
| Withdrawal Update Form 3File: Form-3 CA Certificate 30062025 Sign v_compressed.pdf | 24 Feb 2026 |
| Withdrawal Update Form 3File: Form-3 CA Certificate 30092025 Sign v_compressed.pdf | 24 Feb 2026 |
| Withdrawal Update Form 3File: Form-3 CA Certificate 31122025 Sign v_compressed.pdf | 24 Feb 2026 |
| Form 2A (FY 2024-2025)File: atlanta square - ec 2024-25.pdf | 10 Jun 2025 |
| Form 2A (FY 2023-2024)File: ATLANTA - ECert 2023-24 .pdf | 10 Jun 2025 |
| Form 1File: UA architect certificate 22 4 25 OK Mar.pdf | 6 Jun 2025 |
| Form 2File: UA engineer certificate 28 4 25.pdf | 6 Jun 2025 |
| Form 3File: UA c a certificate 29 4 25.pdf | 6 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosed of Sold and Unsold Invetory 30 03 2025 .pdf | 6 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: developer disclosure 30 03 2025.pdf | 6 Jun 2025 |
| Form 1File: UA Architect certificate 21 1 25 OK DEC.pdf | 6 Jun 2025 |
| Form 2File: UA Engineer Certificate 10 2 25.pdf | 6 Jun 2025 |
| Form 3File: UA CA certificate 14 2 25.pdf | 6 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosed of Sold and Unsold Invetory 30 12 2024.pdf | 6 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: developer disclosure 30 12 2024.pdf | 6 Jun 2025 |
| Form 1File: UA 19 8 24 Architect certificate OK Seo.pdf | 6 Jun 2025 |
| Form 2File: UA 19 8 24 Engineer Certificate.pdf | 6 Jun 2025 |
| Form 3File: UA 19 8 24 CA CERTIFICATE.pdf | 6 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosed of Sold and Unsold Invetory 30 09 2024.pdf | 6 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: developer disclosure 30 09 2024.pdf | 6 Jun 2025 |
| Form 1File: UA architect certicaate 30 06 2024 OK June.pdf | 6 Jun 2025 |
| Form 2File: UA 19 8 24 Engineer Certificate.pdf | 6 Jun 2025 |
| Form 3File: UA 19 8 24 CA CERTIFICATE.pdf | 6 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosed of Sold and Unsold Invetory 30 06 2024.pdf | 6 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: developer disclosure 30 06 2024.pdf | 6 Jun 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Atlanta quality Septmber 2024.pdf | 15 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Serinity quality september 2024.pdf | 15 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate 19 8 24.pdf | 11 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf | 11 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: RERA DISCLOSURE 11 10 24 UTTAM ASSOCIATE ATLANT PROJECT-7.pdf | 11 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Rera CA_compressed.pdf | 25 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer cerficate atlanta.pdf | 18 Jan 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation report allotment Atlanta.pdf | 18 Jan 2024 |
| Other - TechnicalFile: muncipal approval atlanta square.pdf | 18 Jan 2024 |
| Copy of the legal title reportFile: 1 Copy of the legal title report.pdf | 14 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: 1 b Details of encumbrances concerned to Legal.pdf | 14 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: details of encumbarance finalce.pdf | 14 Jan 2024 |
| Details of encumbrances concerned to LegalFile: 1 b Details of encumbrances concerned to Legal.pdf | 14 Jan 2024 |
| Details of encumbrances concerned to LegalFile: details of encumbarance finalce.pdf | 14 Jan 2024 |
| CERSAI detailsFile: CERSAI.pdf | 14 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosed of unsold invetory atlanta.pdf | 14 Jan 2024 |
| Proforma of Allotment letterFile: Allotmetn letter atlanta.pdf | 14 Jan 2024 |
| Layout approvalFile: Atlanata Square Approved Plan_compressed.pdf | 10 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: Atlanata Square Approved Plan_compressed.pdf | 10 Jan 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: sEPARAATE BANK ACCOUNT AXIS.pdf | 10 Jan 2024 |
| Declaration in FORM BFile: FORM B notarised affedive.pdf | 4 Jan 2024 |
| Declaration about Commencement CertificateFile: DECLERATION FOR commencemnet.pdf | 17 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate atlanta.pdf | 17 Dec 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosed of interest_compressed.pdf | 17 Dec 2023 |
| Deviation Report with respect to model copy of AgreementFile: deviation copy of agreemnt.pdf | 17 Dec 2023 |
| Proforma of Agreement for saleFile: Draft Agreement.pdf | 15 Dec 2023 |
| Building plan approvalFile: Atlanata Square Approved Plan_compressed.pdf | 30 Nov 2023 |
| PAN CardFile: Pan card Uttam Associate PDF.pdf | 30 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Atlanata Square Approved Plan_compressed.pdf | 30 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Atlanta Commencement Certificate.pdf | 30 Nov 2023 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| ELEMENTS | TALEGOUN DHABADE PUNE | 15 | Completed | Sep 2018 | Sep 2018 |
| HARMONY | Talegoun Dabhade Pune | 16 | Completed | Dec 2017 | Late, Oct 2020 |
| UTTAM MEDOWS | PLOT NO 7 | 6 | Completed | May 2016 | Late, May 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 73 filed documents as one ZIP, foldered, with a manifest
Keep ATLANTA SQUARE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near LAXMIBAG COLONY13,700+ in Pune
Filed coordinates, straight-line distance. 24 registered projects within 2 km.
Everland
EVITA KRISALA TOWNSHIP LLP
EVERLYN
EVITA KRISALA TOWNSHIP LLP
ABHIMAAN HOMES PHASE 3
RISING PROPCON LLP
SURABHI CITY PHASE 1
Surabhi Group
ROHAN ANAND PHASE I
ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITE
Urban Life Phase 1
Kakade Vtp Associates
Builder: UTTAM ASSOCIATE
UTTAM ASSOCIATE has 4 registrations on MahaRERA, including HARMONY and ELEMENTS. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if ATLANTA SQUARE is delayed beyond 30 Apr 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ATLANTA SQUARE?
The registered promoter entity is UTTAM ASSOCIATE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ATLANTA SQUARE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ATLANTA SQUARE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ATLANTA SQUARE?
The professionals named in the filing: Architect: BRAHMA ASSOCIATES; Engineer: prabhulal chothani PRABHULAL CHOTHANI; Chartered Accountant: Nikunj S Shah & Associates; Chartered Accountant: priyesh jain; Chartered Accountant: Nilesh Raut. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ATLANTA SQUARE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback