Home / Browse projects / Pune, Maharashtra / ATHASHREE
ATHASHREE
RG-MH-77337 · RERA P52100050375 · Last updated on MahaRERA portal: 9 Sep 2025
Source: official MahaRERA filing
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 20 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ATHASHREE is a Others project by ABHIVRUDDHI HOUSING LLP in Pune, Maharashtra, registered with MahaRERA as P52100050375 on 5 Apr 2023. The registration is recorded completed; possession was promised by 31 Aug 2025. The completion date has moved by 20 months from the original filing. 1 of the 12 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameATHASHREE
- TypeOthers
- Location
- TILAK ROAD
- SADASHIV PETH
- Pune (M Corp.)
- Pune City
- Pune
- 411030
- Pincode411030
- RERA no.P52100050375
- ReraGenie IDRG-MH-77337
Builder
- NameABHIVRUDDHI HOUSING LLP
- Entity typePartnership
- GSTIN27ABPFM7716D1Z0
- PartnersSANDEEP DINKAR HAWALDAR, HARSHWARDHAN PRAVIN SHIMPI
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on5 Apr 2023
- Promised completion31 Aug 2025
- Revised completionRevised to 31 Aug 2025 (originally 31 Dec 2023)
- Buildings1 building record
- Documents filed56 files
Current status
Figures as on 9 Sep 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ATHASHREE | NA | 6 | 0 | 12 | 0 | 12 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 9 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 85%.
ATHASHREE: 44% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 85% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 9 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed12
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SHRIRAM BHAUSAHEB PANDIT | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AR MANGESH M GOTAL |
| Engineer | NILESH CHAVAN |
| Chartered Accountant | CAPOOJA KAMDAR DATE |
| Partner | Role in project |
|---|---|
| ABHIVRUDDHI HOUSING LLP | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterJanuary 17, 2024 To, Appropriate Office Maharashtra Real estate Regulatory Authority MAHA RERA Mumbai. Sub: Extension of Completion Date for the project ATHASHREE RERA NO P 21000 50375 With reference to the above we would like to request you for extension of time for our above referred project. Earlier the date of completion was December 31, 2023. However due to delay in plan approvals by the Pune Municipal Corporation we would not complete the work in time. We therefore request for extension of the completion date to December 15, 2024. Thanking you. Yours Sincerely. Authorized Signatory Abhiv
Reason as filed by the promoterFollowing are the explanatory reasons setting out grounds and reasons for delay in completion of our said project: 1) Our said project - ‘ATHASHREE’ having registration number P52100050375 has been physically complete in all aspects which is denoted by our latest uploaded Form 1 Architect Certificate, except mechanical parkings. 2) We are also attaching photos of the project along with this application. 3) There is a scarcity of mechanical parkings vendors in Pune, namely there are only two standard and renowned mechanical parking vendor companies that are serving practically the entire city -
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12600184 | Ram Gawali | ABHIVRUDDHI HOUSING LLP | 23/03/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jan 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 May 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 May 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 May 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed56
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1.pdf | 9 Sep 2025 |
| Form 2File: Form 2.pdf | 9 Sep 2025 |
| Form 3File: Form 3 CA certificate.pdf | 9 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory Declaration.pdf | 9 Sep 2025 |
| Occupational CertificateFile: 20250902005708.pdf | 9 Sep 2025 |
| Declaration about Commencement CertificateFile: Format D-Commencement Plan.pdf | 28 May 2024 |
| Declaration in FORM BFile: Form B notarized.pdf | 28 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A ATHASHREE site.pdf | 28 May 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Declaration -27052024.pdf | 28 May 2024 |
| Layout approvalFile: Plan.pdf | 27 May 2024 |
| Building plan approvalFile: Plan.pdf | 27 May 2024 |
| Copy of Layout Approval (in case of layout)File: Plan.pdf | 27 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan.pdf | 27 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 27 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 MARCH 24.pdf | 22 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MARCH 24.pdf | 22 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MARCH 24.pdf | 22 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MARCH 24.pdf | 22 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 MARCH 24.pdf | 22 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 -new.pdf | 17 Feb 2024 |
| Declaration in FORM BFile: Form-B.pdf | 12 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf | 12 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf | 12 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A.pdf | 12 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 Dec 23_compressed.pdf | 12 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 till june 23.pdf | 16 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 till sept 23.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate Sept 23.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate June 23.pdf | 16 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 June 23_comp file.pdf | 16 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA certificate Sept 23_comp file.pdf | 16 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate 16 mar_11zon.pdf | 29 Mar 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: RERA Bank AC.pdf | 17 Mar 2023 |
| Proforma of Agreement for saleFile: Updated AFS 25feb_11zon.pdf | 6 Mar 2023 |
| Proforma of Allotment letterFile: Allotment new format1.pdf | 16 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: Legal encumbrance Cert.pdf | 2 Feb 2023 |
| Details of encumbrances concerned to LegalFile: Legal encumbrance Cert.pdf | 2 Feb 2023 |
| Declaration about Commencement CertificateFile: Declrtn of commencement.pdf | 2 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annex A Sandeep H.pdf | 2 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annex A H Shimpi.pdf | 2 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annex A K Khare.pdf | 2 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annex A S Pandit.pdf | 2 Feb 2023 |
| Deviation Report with respect to Allotment letterFile: No Deviation in Allotment.pdf | 2 Feb 2023 |
| Deviation Report with respect to model copy of AgreementFile: No Deviation Cert.pdf | 2 Feb 2023 |
| Copy of the legal title reportFile: 1st Supplementary Title Search Report_comp.pdf | 30 Jan 2023 |
| Layout approvalFile: Sanction Plan.pdf | 5 Jan 2023 |
| Copy of Layout Approval (in case of layout)File: Sanction Plan.pdf | 5 Jan 2023 |
| Declaration in FORM BFile: Affidavit.pdf | 5 Jan 2023 |
| Building plan approvalFile: Sanction Plan.pdf | 20 Dec 2022 |
| PAN CardFile: PAN copy.pdf | 20 Dec 2022 |
| Copy of the legal title reportFile: Format A_compressed.pdf | 20 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: Financial Encumburances certificate.pdf | 20 Dec 2022 |
| Details of encumbrances concerned to LegalFile: Financial Encumburances certificate.pdf | 20 Dec 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan.pdf | 20 Dec 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 20 Dec 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200253979948_For_Asset_Based_Search_05_12_2022_15_06_33_286.pdf | 20 Dec 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- All 56 filed documents as one ZIP, foldered, with a manifest
Keep ATHASHREE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SADASHIV PETH13,700+ in Pune
NYATI EVANIA
NYATI CONSTRUCTION PRIVATE LIMITED
CENTRALVISTA
NAIKNAVARE DEVELOPERS PVT. LTD.
Guardian Cityscapes Phase-3
Guardian Homes Private Limited
SARASNAGAR
CITY ETHERNAL LLP
PROFITBAY
LAXMI SPACECON LLP
SUN GLORY
Jindal Mittal Graha Nirman Pvt. Ltd.
Builder: ABHIVRUDDHI HOUSING LLP
ABHIVRUDDHI HOUSING LLP has 1 registration on MahaRERA, including ATHASHREE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if ATHASHREE is delayed beyond 31 Aug 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ATHASHREE?
The registered promoter entity is ABHIVRUDDHI HOUSING LLP, a partnership as per the filing. Its GSTIN 27ABPFM7716D1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ATHASHREE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against ATHASHREE?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for ATHASHREE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ATHASHREE?
The professionals named in the filing: Architect: AR MANGESH M GOTAL; Engineer: NILESH CHAVAN; Chartered Accountant: CAPOOJA KAMDAR DATE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ATHASHREE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.