Home / Browse projects / Dakshina Kannada, Karnataka / ATHARVA AIKYA

Registration approved No litigation declared Mixed Development project

ATHARVA AIKYA

By Atharva Builders And Developers

RG-KA-96767 · RERA PRM/KA/RERA/1257/334/PR/160525/007752 · Last updated on RERA Karnataka portal: 6 May 2025

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Nov 2027Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 70 documents Report an error

ATHARVA AIKYA is a Mixed Development project by Atharva Builders And Developers in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/160525/007752 on 16 May 2025. Possession is promised by 30 Nov 2027.

At a glance

Project

  • NameATHARVA AIKYA
  • TypeMixed Development
  • Location
    • Mangalore
    • Dakshina Kannada
    • 575006
  • Pincode575006
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1257/334/PR/160525/007752
  • ReraGenie IDRG-KA-96767

Builder

  • NameAtharva Builders And Developers
  • Entity typePartnership Firm
  • GSTIN29ABRFA5785G1ZR
  • Authorized SignatoryDhanraj Kumar
  • Other registrations6 more →
  • Declared earlier projects10 →

Key dates

this monthRegisteredMay 2025PromisedNov 2027

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on16 May 2025
  • Promised completion30 Nov 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed70 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ATHARVA AIKYA-----34

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 6 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 6 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
Piped GasYes-
Water and SanitationYes-
Air ConditioningYes-
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementYes-
TerraceYes-
Outer WallNoNot applicable
Open parking areasYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area769 sq m
Named landowners1
LandownerVillageDistrict
Atharva Builders And Developers--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 7.78 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 6.87 cr-
Payment of taxesRs 71.00 lakh-
On-site expenditure-Consultants FeesRs 10.00 lakh-
On-site expenditure-Site OverheadRs 5.00 lakh-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 5.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectALVA AND ASSOCIATES
Engineerk anil hegde
Chartered AccountantSRINIVAS UDUPA

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed70

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/160525/007752 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
sources of fund to complete the project with supporting documentsFile: Sources of Fund.pdf6 May 2025
EC from 1-4-2011 to till dateFile: ECC-AIKYA 11 4 2025.pdf6 May 2025
connected MR showing flow of titles in favor of landownerFile: MR AIKYA.pdf6 May 2025
title deed of the current landownerFile: SALE DEED 5494 NEW.pdf6 May 2025
advocate search reportFile: ADVOCATE SEARCH REPORT - AIKYA.pdf6 May 2025
Approved Original Single Plot layout planFile: SINGLE SITE.pdf6 May 2025
Approved Original Single Plot layout plan orderFile: SINGLE SITE.pdf6 May 2025
Building License from Local Authority Original CopyFile: LICENSE AIKYA.pdf6 May 2025
ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original survey sketchFile: SKETCH.pdf6 May 2025
ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original survey sketchFile: PLAN 2 (1) MERGED.pdf6 May 2025
Upload all original sanctioned drawings, floor plan, sectional drawings and elevationsFile: floor plan merged.pdf6 May 2025
Upload commencement certificateFile: LICENSE AIKYA.pdf6 May 2025
Demarcation of proposed land in Approved Master plan Certified by the concern authorityFile: PLAN 2 (1) MERGED.pdf6 May 2025
Demarcation of proposed land in original Village map certified by the concern authorityFile: VILLAGE MAP AIKYA.pdf6 May 2025
Common Area Allotted to the Association on the project detail pageFile: COMMON AREA DETAILS.pdf6 May 2025
Common Area Allotted to the AssociationFile: Aikya Estimate.pdf6 May 2025
the Project Engineer details along with the self-attested copy of the Engineer license certificate,File: StructuralEngCertificate Anil Hegde.pdf6 May 2025
the brief estimated cost of construction, certified by the registered Civil EngineerFile: CONSTRUCTION COST DETAILS.pdf6 May 2025
area details are incorrect; please update the area details properly on the project detail page as pFile: AREA DETAILS.pdf6 May 2025
Annexure-A and upload the proforma of the Allotment letterFile: ALLOTMENT LETTER.pdf6 May 2025
Proforma of agreement (AFS) for saleFile: New Agreement - (Rera)AIKYA.pdf6 May 2025
)Architects certificate with valid COA numberFile: ARCHITECT CERTIFICATE.pdf6 May 2025
water supply to the project, Presently we have well water further will apply corporation waterFile: AIKYA WELL WATER POINT.pdf6 May 2025
the project name and project address, and upload the project section 3(1) notarised affidavitFile: Notarized affidavit.pdf6 May 2025
the Certificate from Registered Engineer indicating the structural safety adopted for the proposed bFile: stability certificate.pdf6 May 2025
profit and loss account and balance sheet for 2021-22, 2022-23 & 2023-24 with schedules and CA UDINFile: 22 23 balance sheet_merged.pdf6 May 2025
Upload previous project quarterly updatesFile: previous project annual audit and quarterly updatated.pdf6 May 2025
the Land cost calculation sheet as per the guidance valueFile: LAND COST.pdf6 May 2025
RTC, survey 59.8-
Mutation, survey 59.8-
Encumbrance Certificate, survey 59.8-
Conversion/Alienation Order, survey 59.8-
Sale/Title/Gift Deed, survey 59.8-
Khatha, survey 59.8-
Registration CertificateFile: Form C.pdf-
GST CertificateFile: GST Certificate 1.pdf-
Partnership DeedFile: Partership Deed - Atharva.PDF-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: FORM 1 CA CERTIFICATE_11zon.pdf-
Certificate issued by Architect Form 2File: ARCHITECT CERTIFICATE.pdf-
Certificate issued by Engineer Form 3File: ENGINEER CERTIFICATE.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: AFFIDAVIT CUM DECLARATION- non litigation.pdf-
Balance Sheet 2023 - 2024File: ATHARVA INCOME TAX SET_23-24.pdf-
Balance Sheet 2022 - 2023File: ATHARVA INCOME TAX SET_22-23.pdf-
Balance Sheet 2021 - 2022File: Balancesheet Atharva 21-22.pdf-
Audited Profit and Loss Statement 2023 - 2024File: STATEMENT OF INCOME AY2023-24.pdf-
Audited Profit and Loss Statement 2022 - 2023File: STATEMENT OF INCOME AY2022-23.pdf-
Audited Profit and Loss Statement 2021 - 2022File: atharva income tax 2021-22.pdf-
Income Tax Return Acknowledgement 2023 - 2024File: ACK_2023-24.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: ACK_2022-23.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: ACK 21-22.pdf-
LICENSE AIKYA-
PLAN 2 (1) MERGED-
PLAN 2 (1) MERGED-
Specification Aikya-
BROCHURE AIKYA_11zon-
DANAPATHRA gift deed-
NEW AGREEMENT- (Rera)AIKYA-
AllotmentLetter-2-9_merged (1)OLD-
FORM B AFFIDAVIT-
AFFIDAVIT CUM DECLARATION- non litigation-
JOINT AFFIDAVIT CUM DECLARATION-
MESCOM NOC AIKYA-
WATER NOC AIKYA-

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date1 under way, not due yet2 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
Atharva KanishkaBejai KapikadOngoingDec 2026Not due yet
Atharva Padma KushaUrwa Marigudi MangaloreOngoingJul 2025Not delivered
Atharva KrishniBejai, Anegundi, MangaloreCompleted-No date filed
Atharva GloryPandeshwara, Near Fire Station, MangaloreCompleted-No date filed

How this compares with Dakshina Kannada

30%of Dakshina Kannada projects moved their completion datethis one has not
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep ATHARVA AIKYA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

2 kmATHARVA AIKYAOther 76Dot size: filed unitsN

Filed coordinates, straight-line distance. 76 registered projects within 2 km.

Builder: Atharva Builders And Developers

Atharva builders and developers has 7 registrations on RERA Karnataka, including Atharva Kanishka and Atharva Krishvi. Its filings declare 10 earlier projects, 3 of them declared completed. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if ATHARVA AIKYA is delayed beyond 30 Nov 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of ATHARVA AIKYA?

The registered promoter entity is Atharva Builders And Developers, a partnership firm as per the filing. Its GSTIN 29ABRFA5785G1ZR can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in ATHARVA AIKYA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at ATHARVA AIKYA?

The professionals named in the filing: Architect: ALVA AND ASSOCIATES; Engineer: k anil hegde; Chartered Accountant: SRINIVAS UDUPA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ATHARVA AIKYA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ATHARVA AIKYA. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ATHARVA AIKYA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.