ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / Astha Avana

Registered No litigation declared Residential / Group Housing project

Astha Avana

By Anand Chandanmalji Soni HUF

RG-MH-85352 · RERA P52000047976 · Last updated on MahaRERA portal: 13 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 16 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Oct 2027Possession promisedmoved 16 months from the original
7 of 11Construction stages donefurthest along: External plumbing and external plaster, 98%
82 of 109Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

Astha Avana is a Residential / Group Housing project by Anand Chandanmalji Soni HUF in Raigarh, Maharashtra, registered with MahaRERA as P52000047976 on 2 Dec 2022. Possession is promised by 30 Oct 2027. The completion date has moved by 16 months from the original filing. 27 of the 109 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameAstha Avana
  • TypeResidential / Group Housing
  • Location
    • Plot No 71
    • sector 5 Ulve
    • Ulawe
    • Panvel
    • Raigarh
    • 400706
  • Pincode400706
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000047976
  • ReraGenie IDRG-MH-85352

Builder

  • NameAnand Chandanmalji Soni HUF
  • Entity typeIndividual
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2022First promiseJun 2026Revised toOct 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Dec 2022
  • Promised completion30 Oct 2027
  • Revised completionRevised to 30 Oct 2027 (originally 30 Jun 2026)
  • Buildings1 building record
  • Documents filed87 files

Current status

25%27 of 109 units booked
76.2%Work done, per cost certificate

Figures as on 13 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Astha AvanaNA17119316109

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 98%.

Astha Avana: 86% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises82%
Sanitary Fittings within the flats / premises38%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.31%

Progress on shared amenities15

As on 13 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes75%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed11

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots11
Closed/Covered1
Open Space10

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,050 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Aug 2025

Approvals and building plan

Sanctioning authorityCIDCO LTD
Permissible FSI2222.94
Proposed, not sanctioned2,223 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNerul East Navi Mumbai
Estimated costRs 22.56 cr
Cost incurredRs 17.20 cr
Work done76.23%
BuildingWingEstimatedIncurred
Astha AvanaNARs 17.84 crRs 13.99 cr
-NARs 4.72 crRs 3.21 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDestination Architecture Interior Designs
EngineerAdharshila Consultants
EngineerAyush Soni Architect
Chartered AccountantM H Kachhara & Co Chartered Accountants
Chartered AccountantDhaval Mehta & Associates
Chartered AccountantRAVARIYA ASSOCIATES
PartnerRole in project
Anand Chandanmalji Soni HUF-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA25062621519Jun 2026 → Jun 2027

Reason as filed by the promoterThere were liquidity issues and delays in funding. Labour and material shortages, along with disruptions in supply chains and workforce availability, are impacting construction timelines.

P52000047976/WarJun 2026 → Oct 2027

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Sep 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Oct 2027

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A_FY 2025-26.pdf13 Aug 2026
Withdrawal Update Form 1File: FORM 1.pdf21 Jul 2026
Withdrawal Update Form 2File: FORM 2.pdf21 Jul 2026
Withdrawal Update Form 3File: FORM 3.pdf21 Jul 2026
Withdrawal Update Form 1File: FORM 1.pdf27 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf27 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf27 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf20 Jan 2026
Withdrawal Update Form 2File: FORM 2.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM 3 Q3.pdf20 Jan 2026
Withdrawal Update Form 1File: FORM 1.pdf27 Oct 2025
Withdrawal Update Form 2File: FORM 2.pdf27 Oct 2025
Withdrawal Update Form 3File: FORM 3.pdf27 Oct 2025
Form 5 (FY 2024-2025)File: FORM 5 ASTHA AVANA.pdf30 Sep 2025
Form 1File: FORM 1 22-23 Q3.pdf29 Aug 2025
Form 2File: FORM 2 22-23 Q3.pdf29 Aug 2025
Form 3File: FORM 3 22-23 Q3 - converted.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE Q3 22.pdf29 Aug 2025
Form 1File: FORM 1 22-23-Q4.pdf29 Aug 2025
Form 2File: FORM 2 22-23 Q4.pdf29 Aug 2025
Form 3File: FORM 3 22-23 Q4 - converted.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE Q4 M23.pdf29 Aug 2025
Form 1File: FORM 1 23-24 Q1.pdf29 Aug 2025
Form 2File: FORM 2 23-24 Q1.pdf29 Aug 2025
Form 3File: FORM 3 23-24 Q1 - converted.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOUSER Q1 2023-24.pdf29 Aug 2025
Form 1File: FORM 1 23-24 Q2.pdf29 Aug 2025
Form 2File: FORM 2 23-24 Q2 - converted.pdf29 Aug 2025
Form 3File: FORM 3 23-24 Q2 - converted.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOUSER Q2 2023-24.pdf29 Aug 2025
Form 1File: FORM 1 23-24 Q3.pdf29 Aug 2025
Form 2File: FORM 2 23-24 Q3.pdf29 Aug 2025
Form 3File: FORM 3 23-24 Q3 - converted.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOUSER Q3 2023-24.pdf29 Aug 2025
Form 1File: FORM 1 23-24 Q4.pdf29 Aug 2025
Form 2File: FORM 2 23-24 Q4.pdf29 Aug 2025
Form 3File: FORM 3 23-24 Q4 - converted.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOUSER Q4 2023-24.pdf29 Aug 2025
Form 1File: Form 1 _2024-07-05.pdf29 Aug 2025
Form 2File: FORM 2 2024-25 Q1.pdf29 Aug 2025
Form 3File: FORM 3 2024-25 Q1.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE Q1 2024-25.pdf29 Aug 2025
Form 1File: Form 1 _2024-Q2.pdf29 Aug 2025
Form 2File: FORM 2 2024-25 Q2.pdf29 Aug 2025
Form 3File: FORM 3 2024-25 Q2.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE Q2 2024-25.pdf29 Aug 2025
Form 1File: Form 1_2024-Q3.pdf29 Aug 2025
Form 2File: FORM 2 2024-25 Q3.pdf29 Aug 2025
Form 3File: FORM 3 2024-25 Q3.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE Q3 2024-25.pdf29 Aug 2025
Form 1File: Form 1_2025-Q4.pdf29 Aug 2025
Form 2File: FORM 2 2024-25 Q4.pdf29 Aug 2025
Form 3File: FORM 3 2024-25 Q4.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE Q4 2024-25.pdf29 Aug 2025
Withdrawal Update Form 1File: Form 1_2025-07-05.pdf29 Aug 2025
Withdrawal Update Form 2File: FORM 2 2025-26 Q1.pdf29 Aug 2025
Withdrawal Update Form 3File: FORM 3 2025-26 Q1.pdf29 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3 2022-23.pdf4 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q4 2022-23.pdf4 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q1 2023-24.pdf4 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2 2023-24.pdf4 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3 2023-24.pdf4 Apr 2024
CERSAI detailsFile: Declaration about cersai report.pdf23 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf23 Nov 2022
CERSAI detailsFile: Astha_Asset Based Search dated 14_11_22.pdf15 Nov 2022
Other - FinanceFile: Form 1.pdf15 Nov 2022
Other - FinanceFile: Form 2.pdf15 Nov 2022
CERSAI detailsFile: Astha_Debtor Based Search.pdf8 Nov 2022
CERSAI detailsFile: CERSAI_Search_Report_200250295174_For_Debtor_Based_Search_20_10_2022_15_27_14_220.pdf21 Oct 2022
Deviation Report with respect to Allotment letterFile: Deviation Report Declaration for Allotment Letter.pdf21 Oct 2022
Deviation Report with respect to Allotment letterFile: allottment letter.pdf21 Oct 2022
Other - LegalFile: Declaration of CC.pdf21 Oct 2022
Details of encumbrances concerned to FinanceFile: Encumbrance Letter.pdf13 Oct 2022
Details of encumbrances concerned to LegalFile: No Encumbrance Final.pdf13 Oct 2022
Declaration about Commencement CertificateFile: Declaration About CC Format D.pdf13 Oct 2022
Proforma of Agreement for saleFile: Draft Agree.pdf13 Oct 2022
Proforma of Allotment letterFile: Draft Agree.pdf13 Oct 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seprate Bank Account Details Format A.pdf13 Oct 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to model agreement.pdf13 Oct 2022
Declaration in FORM BFile: Form B.pdf21 Sep 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Sai AsthaPlot No 18 Sector 23E Ulve2CompletedJun 2019May 2019

How this compares with Raigarh

25%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 16 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Astha Avana on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near sector 5 Ulve5,900+ in Raigarh

2 kmAstha AvanaCompleted 185Lapsed / revoked 50Other 122Dot size: filed unitsN

Filed coordinates, straight-line distance. 357 registered projects within 2 km.

Builder: Anand Chandanmalji Soni HUF

Anand Chandanmalji Soni HUF has 1 registration on MahaRERA, including Astha Avana. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Astha Avana is delayed beyond 30 Oct 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Astha Avana?

The registered promoter entity is Anand Chandanmalji Soni HUF, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Astha Avana?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Astha Avana?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Astha Avana?

The professionals named in the filing: Architect: Destination Architecture Interior Designs; Engineer: Adharshila Consultants; Engineer: Ayush Soni Architect; Chartered Accountant: M H Kachhara & Co Chartered Accountants; Chartered Accountant: Dhaval Mehta & Associates; Chartered Accountant: RAVARIYA ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Astha Avana?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Astha Avana. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Astha Avana to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.