Home / Browse projects / Pune, Maharashtra / Ashok Nirvaan Phase 6

Registration lapsed No litigation declared Residential / Group Housing project

Ashok Nirvaan Phase 6

By Truewin Realty Limited

RG-MH-16597 · RERA P52100026375 · Last updated on MahaRERA portal: 10 Jan 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 26 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Aug 2024Possession promised26 months past this date
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 14 documents Report an error

Ashok Nirvaan Phase 6 is a Residential / Group Housing project by Truewin Realty Limited in Pune, Maharashtra, registered with MahaRERA as P52100026375 on 16 Sep 2020. Possession was promised by 4 Aug 2024 and is now 26 months past that date.

At a glance

Project

  • NameAshok Nirvaan Phase 6
  • TypeResidential / Group Housing
  • Location
    • Old Khandala Road
    • Lonavala (M Cl)
    • Mawal
    • Pune
    • 410401
  • Pincode410401
  • RERA no.P52100026375
  • ReraGenie IDRG-MH-16597

Builder

  • NameTruewin Realty Limited
  • Entity typeCompany
  • DirectorKalyani Shukla
  • Other registrations8 more →
  • Completed1 of 9
  • No longer live8 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

26 months past promisethis monthRegisteredSep 2020PromisedAug 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on16 Sep 2020
  • Promised completion4 Aug 2024
  • Revised completionNone
  • Buildings2 building records
  • Documents filed14 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Villa with sub plot 5NA30000
Villa with sub plot 6NA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 10 Jan 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.

Villa with sub plot 50%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Villa with sub plot 60%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 10 Jan 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes85%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes70%
Landscaping & Tree PlantingYes70%
Street LightingYes70%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes60%
Solid Waste Management And DisposalYes60%
Water conservation /Rain water harvestingYes60%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceYes70%
Open ParkingYes0%

Parking filed4

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots4
Open Space4
BuildingOpen SpaceTotal
Villa with sub plot 522
Villa with sub plot 622

Land and ownership11

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,207 sq m
Land owned byThe promoter, with other names on the file
Named landowners11
LandownerVillageDistrict
Jagdish M KapadiaAndheriMumbai Suburban
Anjana J KapadiaAndheriMumbai Suburban
Ashish J KapadiaAndheriMumbai Suburban
Seema J KapadiaAndheriMumbai Suburban
Jagdeep J KapadiaAndheriMumbai Suburban
Vinodini J KapadiaAndheriMumbai Suburban
Chandrakant M KapadiaAndheriMumbai Suburban
Rita C KapadiaAndheriMumbai Suburban
Gautam C KapadiaAndheriMumbai Suburban
Naina V RawalAndheriMumbai Suburban
Sunita V ZaveriAndheriMumbai Suburban

Approvals and building plan

Permissible FSI834.38
Proposed, not sanctioned695 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch215, Free Press House, Free Press Marg, Nariman Point, Mumbai, 400021

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSubhash Shah & Associates Architects Pvt Ltd
EngineerPankaj Lingot
Chartered AccountantKiran Mathkar
PartnerRole in project
Truewin Realty Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Sep 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Sep 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Sep 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Sep 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed14

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Other - LegalFile: Phase_6.pdf10 Jan 2023
Layout approvalFile: Copy of layout approval.pdf10 Sep 2020
Building plan approvalFile: Building Plan approval.pdf10 Sep 2020
Copy of the legal title reportFile: T Certificate part I.pdf10 Sep 2020
Copy of the legal title reportFile: T Certificate part II.pdf10 Sep 2020
Copy of the legal title reportFile: T Certificate part III.pdf10 Sep 2020
Copy of Layout Approval (in case of layout)File: Copy of layout approval.pdf10 Sep 2020
Building Plan Approval / NA Order for plotted developmentFile: Building Plan approval.pdf10 Sep 2020
PAN CardFile: Truewin Realty Ltd_ PAN CARD.pdf8 Sep 2020
Details of encumbrancesFile: Encumbrance - Phase 6.pdf8 Sep 2020
Commencement Certificates / NA Order for plotted developmentFile: Revised C C 04-09-2020.pdf8 Sep 2020
Declaration in FORM BFile: Declaration - Phase 6.pdf8 Sep 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM_3_ASHOK_NIRVAAN_PHASE_6.pdf8 Sep 2020
Proforma of Allotment letterFile: AFS Declaration.pdf8 Sep 2020

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Ashok Nirvaan phase 1S.No 147 149 154 part 155 C.T.S No. 167-1 to 167-23 Lonavala Ward H- LMC21CompletedJun 2017Late, Nov 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ashok Nirvaan Phase 6 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Old Khandala Road13,700+ in Pune

Builder: Truewin Realty Limited

Truewin Realty Limited has 9 registrations on MahaRERA, including Ashok Nirvaan Villa 43 and Ashok Nirvaan Phase 2. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Ashok Nirvaan Phase 6 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Ashok Nirvaan Phase 6 is delayed beyond 4 Aug 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ashok Nirvaan Phase 6?

The registered promoter entity is Truewin Realty Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ashok Nirvaan Phase 6?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Ashok Nirvaan Phase 6?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ashok Nirvaan Phase 6?

The professionals named in the filing: Architect: Subhash Shah & Associates Architects Pvt Ltd; Engineer: Pankaj Lingot; Chartered Accountant: Kiran Mathkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ashok Nirvaan Phase 6?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ashok Nirvaan Phase 6. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ashok Nirvaan Phase 6 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.