Registered No litigation declared Others project

ASHIRWAD CHS LTD

By SHREEDHAM DEVELOPERS

RG-MH-28050 · RERA P51800024800 · Last updated on MahaRERA portal: 4 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 36 months from the original
2 of 11Construction stages donefurthest along: Excavation, 98%
48 of 97Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

ASHIRWAD CHS LTD is a Others project by SHREEDHAM DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800024800 on 9 Mar 2020. Possession is promised by 31 Dec 2026. The completion date has moved by 36 months from the original filing. 49 of the 97 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameASHIRWAD CHS LTD
  • TypeOthers
  • Location
    • SAHAKARI MARKET ROAD
    • PANT NAGAR GHATKOPAR EAST
    • Kurla
    • Mumbai Suburban
    • 400075
  • Pincode400075
  • RERA no.P51800024800
  • ReraGenie IDRG-MH-28050

Builder

  • NameSHREEDHAM DEVELOPERS
  • Entity typePartnership
  • PartnersVARDHMAN GANPATLAL SINGHVI, RAHUL RAKESH RAWAL

Key dates

this monthRegisteredMar 2020First promiseDec 2023Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Mar 2020
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2023)
  • Buildings1 building record
  • Documents filed77 files

Current status

51%49 of 97 units booked
95.8%Work done, per cost certificate

Figures as on 4 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ASHIRWAD RESIDENCYNA1515831497

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 98%.

ASHIRWAD RESIDENCY: 85% average across the applicable activities

ActivityProgress
Excavation98%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor95%
Slabs of Super Structure97%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%

Progress on shared amenities15

As on 4 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes75%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area742 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Jan 2026
LandownerVillageDistrict
Pant Nagar Ashirwad CHS LTD.KurlaMumbai Suburban

Approvals and building plan

Sanctioning authorityMHADA
Permissible FSI5554.02
Proposed, not sanctioned5,146 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKURLA EAST MUMBAI
Estimated costRs 21.38 cr
Cost incurredRs 20.49 cr
Work done95.82%
BuildingWingEstimatedIncurred
ASHIRWAD RESIDENCYNARs 20.88 crRs 20.28 cr
-NARs 50.00 lakhRs 20.15 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRitesh Thakur
EngineerASSOCIATED STRUCTURAL ENGINEERS LLP
Chartered AccountantPiyush Bolia
PartnerRole in project
SHREEDHAM DEVELOPERS-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800018066Dec 2023 → Dec 2024

Reason as filed by the promoterThe project shall be completed within a year.

EXT51800027315Dec 2023 → Dec 2025

Reason as filed by the promoterthe said project is completed in all aspect apart from fire safety work and lift work. we are positive to complete the project within the extension time and there are no complaints against us therefore kindly grant us the extension.

EA07012619326Dec 2023 → Dec 2026

Reason as filed by the promoterTHE BUILDING IS COMPLETED. WE HAVE APPLIED FOR THE FINAL FIRE NOC AND OTHER NOCs WHICH ARE REQUIRED FOR THE OCCUPATION CERTIFICATE. THE SAME SHALL BE OBTAINED, AND THE POSSESSION SHALL BE HANDED OVER TO THE ALLOTTEES.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Feb 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Feb 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: PN_106_IOA-3-6_compressed.pdf4 Apr 2026
Withdrawal Update Form 1File: q3 form1.pdf4 Apr 2026
Withdrawal Update Form 2File: q3 form 2.pdf4 Apr 2026
Withdrawal Update Form 3File: form 3.pdf4 Apr 2026
Withdrawal Update Form 1File: q2 FORM 1.pdf6 Jan 2026
Withdrawal Update Form 1File: q2 FORM 1.pdf6 Jan 2026
Withdrawal Update Form 1File: q3 form1.pdf6 Jan 2026
Withdrawal Update Form 2File: q2 form 2.pdf6 Jan 2026
Withdrawal Update Form 2File: q2 form 2.pdf6 Jan 2026
Withdrawal Update Form 2File: q3 form 2.pdf6 Jan 2026
Withdrawal Update Form 3File: form 3.pdf6 Jan 2026
Withdrawal Update Form 3File: form 3.pdf6 Jan 2026
Withdrawal Update Form 3File: form 3.pdf6 Jan 2026
Declaration in FORM BFile: form b revised.pdf31 Mar 2025
Declaration in FORM BFile: revised form b.pdf31 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: upto december 2023.pdf31 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: upto march.pdf31 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1) (3).pdf31 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 106 form 5.pdf6 Mar 2025
Declaration in FORM BFile: ilovepdf_merged (93).pdf5 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations (6).pdf15 Feb 2025
Building plan approvalFile: sheet 1_merged_compressed (1).pdf27 Jan 2025
PAN CardFile: pan (4).pdf27 Jan 2025
Details of encumbrances concerned to FinanceFile: 1 Details of encumbrances (1).pdf27 Jan 2025
Declaration in FORM BFile: DocScanner Jan 23, 2025 6-10 PM.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Chartered accountant Certificate (1).pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DocScanner Jan 27, 2025 1-29 PM.pdf27 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: 10713_furthercc_signed.pdf27 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: sheet 1_merged_compressed (1).pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: DocScanner Jan 27, 2025 1-28 PM.pdf27 Jan 2025
Declaration about Commencement CertificateFile: cc de.pdf27 Jan 2025
CERSAI detailsFile: CERSAI_Search_Report_200337165988_For_Asset_Based_Search_27_01_2025_14_37_02_593.pdf27 Jan 2025
CERSAI detailsFile: DocScanner Jan 27, 2025 2-40 PM.pdf27 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: DocScanner Jan 27, 2025 1-28 PM.pdf27 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: DocScanner Jan 27, 2025 1-28 PM(1).pdf27 Jan 2025
Details of encumbrances concerned to LegalFile: 1 Details of encumbrances (1).pdf27 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: DocScanner Jan 27, 2025 2-30 PM.pdf27 Jan 2025
Proforma of Agreement for saleFile: 1 Proforma of Allotment letter (9).pdf22 Jan 2025
Building plan approvalFile: IOA_106_ APRIL 23 ( New ) _compressed-1-4.pdf1 Jan 2025
Building plan approvalFile: IOA_106_ APRIL 23 ( New ) _compressed-5-6.pdf1 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DocScanner 01-Jan-2025 3-05 pm.pdf1 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: 10149_furthercc_signed (2).pdf1 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: IOA_106_ APRIL 23 ( New ) _compressed-5-6.pdf1 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: IOA_106_ APRIL 23 ( New ) _compressed-1-4.pdf1 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ilovepdf_merged (26).pdf16 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: ilovepdf_merged (27).pdf16 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ilovepdf_merged (28).pdf16 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 1829037762.pdf12 Dec 2023
Declaration in FORM BFile: Form B (5).pdf2 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2020-21 (1).pdf2 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2021-22 (1).pdf2 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2022-23.pdf2 Dec 2023
Disclosure of sold/ booked inventoryFile: SOLD (2).pdf2 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 20-21.pdf17 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 21-22.pdf17 Jun 2023
Building plan approvalFile: Amended 106 IOA (5)_compressed-1-4.pdf6 May 2023
Building plan approvalFile: Amended 106 IOA (5)_compressed-5-6-1.pdf6 May 2023
Building plan approvalFile: Amended 106 IOA (5)_compressed-5-6-2.pdf6 May 2023
Building plan approvalFile: Amended 106 IOA (5)_compressed-7.pdf6 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Amended 106 IOA (5)_compressed-1-4.pdf6 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Amended 106 IOA (5)_compressed-5-6-1.pdf6 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Amended 106 IOA (5)_compressed-5-6-2.pdf6 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Amended 106 IOA (5)_compressed-7.pdf6 May 2023
Commencement Certificates / NA Order for plotted developmentFile: fcc 106.pdf19 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 106.pdf23 Feb 2022
Proforma of Allotment letterFile: draft.pdf23 Feb 2022
Declaration in FORM BFile: DECLARATION FORM B.pdf4 Mar 2020
Proforma of Allotment letterFile: Agreement for sale and Allotment letter proforma 106.pdf4 Mar 2020
Building plan approvalFile: IOA PLAN 106.pdf18 Feb 2020
Layout approvalFile: IOA PLAN 106.pdf18 Feb 2020
Copy of the legal title reportFile: Title certificate.pdf18 Feb 2020
Details of encumbrancesFile: declaration of no encumbrances.pdf18 Feb 2020
Copy of Layout Approval (in case of layout)File: IOA PLAN 106.pdf18 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: IOA PLAN 106.pdf18 Feb 2020
Commencement Certificates / NA Order for plotted developmentFile: 106 c c.pdf18 Feb 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate GM arch.pdf18 Feb 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: shree dham developers.pdf18 Feb 2020

How this compares with Mumbai Suburban

51%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 36 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ASHIRWAD CHS LTD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PANT NAGAR GHATKOPAR EAST6,700+ in Mumbai Suburban

Builder: SHREEDHAM DEVELOPERS

SHREEDHAM DEVELOPERS has 1 registration on MahaRERA, including ASHIRWAD CHS LTD. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if ASHIRWAD CHS LTD is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ASHIRWAD CHS LTD?

The registered promoter entity is SHREEDHAM DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ASHIRWAD CHS LTD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ASHIRWAD CHS LTD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ASHIRWAD CHS LTD?

The professionals named in the filing: Architect: Ritesh Thakur; Engineer: ASSOCIATED STRUCTURAL ENGINEERS LLP; Chartered Accountant: Piyush Bolia. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ASHIRWAD CHS LTD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ASHIRWAD CHS LTD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ASHIRWAD CHS LTD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.