Ashiana Malhar Phase II
RG-MH-40660 · RERA P52100052593 · Last updated on MahaRERA portal: 29 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Ashiana Malhar Phase II is a Residential / Group Housing project by Ashiana Housing Limited in Pune, Maharashtra, registered with MahaRERA as P52100052593 on 11 Sep 2023. Possession is promised by 31 May 2027. 213 of the 220 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete.
At a glance
Project
- NameAshiana Malhar Phase II
- TypeResidential / Group Housing
- Location
- Marunji Road
- Pune
- Marunji
- Mulshi
- 411057
- Pincode411057
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100052593
- ReraGenie IDRG-MH-40660
Builder
- NameAshiana Housing Limited
- Entity typeCompany
- CINL70109WB1986PLC040864
- GSTIN27AADCA9093P1ZX
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- Managing DirectorVishal Gupta
- DirectorsAnkur Gupta, Varun Gupta, Abhishek Dalmia, Sonal Mattoo, Piyul Mukherjee, Narayan NA Anand
- Other registrations7 more →
- Declared earlier projects32 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on11 Sep 2023
- Promised completion31 May 2027
- Revised completionNone
- Buildings2 building records
- Documents filed95 files
Current status
Figures as on 29 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| T- 8 | NA | 15 | 0 | 110 | 0 | 110 |
| T - 9 | NA | 15 | 0 | 110 | 0 | 110 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 93%.
T- 877%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 91% |
| Sanitary Fittings within the flats / premises | 61% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 73% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 72% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 47% |
T - 976%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 93% |
| Sanitary Fittings within the flats / premises | 61% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 73% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 34% |
Progress on shared amenities15
As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 44% |
| Water Supply | Yes | 81% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 18% |
| Storm Water Drains | Yes | 19% |
| Landscaping & Tree Planting | Yes | 91% |
| Street Lighting | Yes | 20% |
| Community Buildings | Yes | 80% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 99% |
| Solid Waste Management And Disposal | Yes | 46% |
| Water conservation /Rain water harvesting | Yes | 11% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 26% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed651
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| T- 8 | 29 | 324 | 353 |
| T - 9 | 27 | 271 | 298 |
Land and ownership4
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Madan Shantilal Jain | Pune (M Corp.) | Pune |
| Purushottam Mukunddas Lohia | Pune (M Corp.) | Pune |
| Vijaykumar Santoshchand Jain | Mumbai City | Mumbai City |
| M/s Hindumal Balmukund Investment Co. PVT. Ltd. | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| T- 8 | NA | Rs 22.36 cr | Rs 20.67 cr |
| T - 9 | NA | Rs 22.36 cr | Rs 20.42 cr |
| - | NA | Rs 10.29 cr | Rs 6.76 cr |
Certifying professionals and partners11
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sanjeev Mehta |
| Architect | Mangesh Gotal |
| Engineer | Yogesh Kapoor |
| Engineer | MS JW consultant LLP |
| Engineer | Enviro Analysts & Engineers Pvt. Ltd. |
| Engineer | Dheeraj Agarwal |
| Engineer | Ramshankar Sharma |
| Engineer | Sagar Kale |
| Engineer | Dheeraj Agrawal |
| Chartered Accountant | SAC & Co LLP |
| Chartered Accountant | B.Chhawchharia & Co. |
| Partner | Role in project |
|---|---|
| Ashiana Housing Limited | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Jul 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Jul 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Jul 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 May 2027
Documents filed95
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2024-2025)File: Form 2A Malhar phase 2 25-26.pdf | 29 Jun 2026 |
| Form 5 (FY 2024-2025)File: Malhar Ph-2 Annual Certificate.pdf | 27 Jun 2026 |
| Form 2A (FY 2023-2024)File: FORM 2A - M2 - FY 2023 - 24 - SIG.pdf | 19 May 2026 |
| Withdrawal Update Form 1File: Form 1 M2.pdf | 24 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 M2.pdf | 24 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 - M2.pdf | 24 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1 - M2 - Dec 25.pdf | 19 Mar 2026 |
| Withdrawal Update Form 2File: FORM 2 - M2 - Dec 25.pdf | 19 Mar 2026 |
| Withdrawal Update Form 3File: FORM 3 - M2 - Dec 25.pdf | 19 Mar 2026 |
| Withdrawal Update Form 1File: FORM 1 - Malhar 2 - Sep 25.pdf | 23 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 - Malhar PH-2 - Sep 25.pdf | 23 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 - Malhar 2 - Sep 25_compressed.pdf | 23 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1 - Malhar 2- Jun 25.pdf | 20 Feb 2026 |
| Withdrawal Update Form 2File: FORM 2 - Malhar 2 - Jun 25.pdf | 20 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3 - Malhar 2- Jun 25_compressed.pdf | 20 Feb 2026 |
| Disclosure of sold/ booked inventoryFile: Malhar Phase 2 - Inventory 31032025.pdf | 6 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Malhar 2 - signed-13-16.pdf | 22 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 2 - Malhar 2 - signed-17-20.pdf | 22 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 03 Malhar 2_compressed.pdf | 22 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Malhar 2 - signed-17-20.pdf | 22 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory - Malhar 2 - 31122024.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - MALHAR 2 31122024 - Signed.pdf | 18 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - Ashiana Malhar Phase Il - 31122024 - signed - compressed.pdf | 18 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Malhar 2 31122024.pdf | 18 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Malhar II 30092024.pdf | 21 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - AMODH PHASE 1 30092024.pdf | 16 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - MALHAR 2 30092024.pdf | 16 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - AMODH PHASE 1 30092024_compressed.pdf | 16 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - MALHAR 2 30092024_compressed.pdf | 16 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - AMODH 1 30092024.pdf | 16 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Malhar 2 30092024.pdf | 16 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - Malhar II - 24.pdf | 8 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Malhar Ph-2 Annual Rera FY 2023-24.pdf | 7 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Malhar 2 - 30062024.pdf | 19 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Malhar Ph 2 - signed.pdf | 16 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Malhar 2 - signed.pdf | 16 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - Malhar 2 - signed_compressed.pdf | 16 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Malhar Ph-II.pdf | 16 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase II.pdf | 12 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase2.pdf | 12 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect.pdf | 19 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf | 19 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 19 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_compressed (2).pdf | 19 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 PhII.pdf | 30 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 30 Oct 2023 |
| Proforma of Agreement for saleFile: Ashiana Malhar Phase II ATS_compressed-31-50.pdf | 4 Sep 2023 |
| Proforma of Agreement for saleFile: Ashiana Malhar Phase II ATS_compressed-51-70.pdf | 4 Sep 2023 |
| Proforma of Agreement for saleFile: Ashiana Malhar Phase II ATS_compressed-71-90.pdf | 4 Sep 2023 |
| Proforma of Agreement for saleFile: Ashiana Malhar Phase II ATS_compressed-91-138.pdf | 4 Sep 2023 |
| Deviation Report with respect to model copy of AgreementFile: deviation final_compressed-34-66.pdf | 4 Sep 2023 |
| Other - TechnicalFile: Plinth Declaration.pdf | 4 Sep 2023 |
| Deviation Report with respect to model copy of AgreementFile: deviation final_compressed-1-33.pdf | 18 Aug 2023 |
| Building plan approvalFile: 3_15 Parking Layout.pdf | 26 Jul 2023 |
| Building plan approvalFile: 4_15 T-1, T-2, T-4, T-5, T-6, T-7, T-8_compressed.pdf | 26 Jul 2023 |
| Building plan approvalFile: 5_15 T-1, T-2, T-4, T-5, T-6, T-7, T-8_compressed (1).pdf | 26 Jul 2023 |
| Building plan approvalFile: 6_15 T-1, T-2, T-4, T-5, T-6, T-7, T-8_compressed (1).pdf | 26 Jul 2023 |
| Building plan approvalFile: 7_15 Residential Towers 1to9_compressed.pdf | 26 Jul 2023 |
| Building plan approvalFile: 8_15 Residential Tower T3_compressed.pdf | 26 Jul 2023 |
| Building plan approvalFile: 9_15 Residential Tower T3, T9_compressed (1).pdf | 26 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 3_15 Parking Layout.pdf | 26 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 4_15 T-1, T-2, T-4, T-5, T-6, T-7, T-8_compressed.pdf | 26 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 5_15 T-1, T-2, T-4, T-5, T-6, T-7, T-8_compressed (1).pdf | 26 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 6_15 T-1, T-2, T-4, T-5, T-6, T-7, T-8_compressed (1).pdf | 26 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 7_15 Residential Towers 1to9_compressed.pdf | 26 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 8_15 Residential Tower T3_compressed.pdf | 26 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 9_15 Residential Tower T3, T9_compressed (1).pdf | 26 Jul 2023 |
| Other - LegalFile: SKM_C22723072617030.pdf | 26 Jul 2023 |
| Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance.pdf | 22 Jul 2023 |
| Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance.pdf | 22 Jul 2023 |
| Copy of the legal title reportFile: Title Report Ashiana Malhar Phase-II_compressed.pdf | 18 Jul 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 7 Commencement Certificates _ NA Order for plotted development.pdf | 18 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Inventory List Malhar Phase II signed.pdf | 18 Jul 2023 |
| Proforma of Agreement for saleFile: Ashiana Malhar Phase II ATS_compressed-1-30.pdf | 18 Jul 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Malhar Phase II Bank Declaration.pdf | 18 Jul 2023 |
| Declaration in FORM BFile: Declaration Form - B Malhar Phase II.pdf | 4 Jul 2023 |
| CERSAI detailsFile: 1 CERSAI details-1.pdf | 4 Jul 2023 |
| CERSAI detailsFile: 2 CERSAI details-2.pdf | 4 Jul 2023 |
| Proforma of Allotment letterFile: Allotment Letter Malhar Phase II Signed.pdf | 4 Jul 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Report Malhar Phase II-Allotment.pdf | 4 Jul 2023 |
Promoter's earlier projects33
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Anmol Phase III and Plaza Phase II | revenue estate of Village-Dhulena Sector 33 Tehsil-Sohna Distt Gurgaon Haryana | 300 | Ongoing | Dec 2028 | Dec 2028 |
| Ashiana Malhar | Marunji Taluka Mulshi District Pune Maharashtra | 220 | Ongoing | Oct 2026 | Oct 2026 |
| Ashiana Tarang Phase IVB | Revenue Village of Milakpur Gurjar Tehsil Tijara Bhiwadi Distt Alwar Rajasthan | 48 | Ongoing | Jun 2026 | Jun 2026 |
| Ashiana Shubham Phase IVB | Sengundram Village Govindapuram Hamlet Maraimalai Nagar Municipal Limit Chengalpet Tamil Nadu | 140 | Ongoing | Dec 2025 | Dec 2025 |
| Ashiana Tarang Phase IVA | Revenue Village of Milakpur Gurjar Tehsil Tijara Bhiwadi Distt. Alwar Rajasthan | 26 | Ongoing | Nov 2025 | Nov 2024 |
| Ashiana Amantran Phase III | village Keshopura Tehsil Sanganer Jaipur | 224 | Ongoing | Aug 2025 | Aug 2025 |
| Ashiana Amantran Phase-II | Jaipur | 56 | Ongoing | Jun 2025 | Jun 2025 |
| AshianaAmantran Phase-I | Jaipur | 224 | Ongoing | Dec 2024 | Dec 2024 |
| Ashiana Nirmay Phase IV | Bhiwadi | 151 | Ongoing | Dec 2024 | Dec 2024 |
| Ashiana Dwarka Phase IV | Jodhpur | 96 | Ongoing | Oct 2024 | Oct 2024 |
| Ashiana Daksh Phase-II | Jaipur | 192 | Ongoing | Oct 2024 | Oct 2024 |
| Ashiana Tarang-III | Bhiwadi | 96 | Completed | Jul 2024 | Jul 2024 |
| Ashiana Daksh, Phase-I | Jaipur | 341 | Completed | Jul 2024 | Jul 2024 |
| Ashiana Daksh Phase III | Village Srikishanpura Tehsil Sanganer Distt Jaipur Rajasthan | 96 | Completed | Jul 2024 | Jul 2024 |
| Ashiana Shubham Phase IVA | Sengundram Village Govindapuram Hamlet Maraimalai Nagar Municipal Limit Chengalpet Taluk Kancheepuram District Tamil Nadu | 220 | Completed | Mar 2024 | Mar 2024 |
| Ashiana Aditya Phase-II | Jamshedpur | 200 | Completed | Jan 2024 | Jan 2024 |
| Ashiana Aditya Phase-I | Jamshedpur | 250 | Completed | Jun 2023 | Jun 2021 |
| Ashiana Dwarka Phase III | Jodhpur | 96 | Completed | May 2023 | May 2023 |
| Ashiana Dwarka Phase II | Jodhpur | 96 | Completed | May 2023 | May 2023 |
| Ashiana Sehar | Jamshedpur | 239 | Completed | Jan 2023 | Jan 2023 |
| AshianaNirmay Phase III | Bhiwadi | 192 | Completed | Dec 2022 | Dec 2022 |
| Ashiana Shubham Phase III | Sengundram Village Govindapuram Hamlet Maraimalai Nagar Municipal Limit Chengalpet Taluk Kancheepuram Chennai Tamil Nadu | 172 | Completed | Oct 2022 | Oct 2022 |
| Ashiana Tarang-II | Bhiwadi | 48 | Completed | May 2022 | May 2022 |
| Ashiana Umang Phase IV | Jaipur | 192 | Completed | Oct 2021 | Oct 2021 |
| Ashiana Umang Ph-V and Umang Plaza | Jaipur | 304 | Ongoing | Oct 2021 | Late, Oct 2024 |
| AshianaNirmay Phase II | Bhiwadi | 96 | Completed | May 2021 | May 2021 |
| Ashiana Shubham Phase II | Sengundram Village Govindapuram Hamlet Maraimalai Nagar Municipal Limit Chengalpet Taluk Kancheepuram District Tamil Nadu | 144 | Completed | Mar 2021 | Mar 2021 |
| Ashiana Sehar | Jamshedpur | 239 | Completed | Jan 2021 | Jan 2021 |
| Anmol Phase I | revenue estate of Village-Dhunela Sector 33 Tehsil- Sohna Distt Gurugram Haryana | 300 | Completed | Oct 2020 | Oct 2020 |
| Anmol Phase II | revenue estate of Village-Dhunela Sector 33 Tehsil- Sohna Distt Gurugram Haryana | 280 | Completed | Apr 2020 | Apr 2020 |
| Ashiana Dwarka EWS/LIG | Jodhpur | 102 | Completed | May 2019 | May 2019 |
| AshianaTarang Phase IA | Bhiwadi | 104 | Completed | Apr 2019 | Late, Apr 2021 |
| Ashiana Shubham Phase I | Sengundram Village Govindapuram Hamlet Maraimalai Nagar Municipal Limit Chengalpet Taluk Kancheepuram District Tamil Nadu | 144 | Completed | Jun 2017 | Jun 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 7 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 95 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Ashiana Malhar Phase II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Pune13,700+ in Pune
Filed coordinates, straight-line distance. 36 registered projects within 2 km.
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
VTP BELLISSIMO PHASE 1
MAGNITE DEVELOPERS PRIVATE LIMITED
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Builder: Ashiana Housing Limited
Ashiana Housing Limited has 8 registrations on MahaRERA, including Ashiana Malhar Phase I and Commercial Block and Ashiana Amodh Phase I. Its filings disclose 32 earlier MahaRERA projects: declares 30 of 32 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Ashiana Malhar Phase II is delayed beyond 31 May 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Ashiana Malhar Phase II?
The registered promoter entity is Ashiana Housing Limited, a company as per the filing. Its CIN L70109WB1986PLC040864 and GSTIN 27AADCA9093P1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Ashiana Malhar Phase II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Ashiana Malhar Phase II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Ashiana Malhar Phase II?
The professionals named in the filing: Architect: Sanjeev Mehta; Architect: Mangesh Gotal; Engineer: Yogesh Kapoor; Engineer: MS JW consultant LLP; Engineer: Enviro Analysts & Engineers Pvt. Ltd.; Engineer: Dheeraj Agarwal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Ashiana Malhar Phase II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback