Home / Browse projects / Pune, Maharashtra / Ashiana Malhar Phase I and Commercial Block
Ashiana Malhar Phase I and Commercial Block
RG-MH-23106 · RERA P52100046049 · Last updated on MahaRERA portal: 5 Oct 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Ashiana Malhar Phase I and Commercial Block is a Residential / Group Housing project by Ashiana Housing Limited in Pune, Maharashtra, registered with MahaRERA as P52100046049 on 15 Jun 2022. Possession is promised by 31 Oct 2026. 108 of the 230 units on this registration are recorded sold or booked, and 21 of 33 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameAshiana Malhar Phase I and Commercial Block
- TypeResidential / Group Housing
- Location
- NA
- Pune
- Mulshi
- 411057
- Pincode411057
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100046049
- ReraGenie IDRG-MH-23106
Builder
- NameAshiana Housing Limited
- Entity typeCompany
- CINL70109WB1986PLC040864
- GSTIN27AADCA9093P1ZX
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- Managing DirectorVishal Gupta
- DirectorsAnkur Gupta, Varun Gupta, Abhishek Dalmia, Sonal Mattoo, Piyul Mukherjee, Narayan NA Anand
- Other registrations7 more →
- Declared earlier projects32 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on15 Jun 2022
- Promised completion31 Oct 2026
- Revised completionNone
- Buildings3 building records
- Documents filed108 files
Current status
Figures as on 5 Oct 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower 4 | NA | 15 | 14 | 110 | 0 | 110 |
| Tower 5 | NA | 15 | 14 | 110 | 0 | 110 |
| Commercial Block | NA | 2 | 1 | 0 | 10 | 10 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 5 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
21 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Installation of Lifts, at 19%.
Tower 482%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Tower 582%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Commercial Block29%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 19% |
Progress on shared amenities15
As on 5 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed310
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Tower 4 | 80 | 67 | 147 |
| Tower 5 | 58 | 89 | 147 |
| Commercial Block | 0 | 16 | 16 |
Land and ownership4
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Madan Shantilal Jain | Pune (M Corp.) | Pune |
| Purushottam Mukunddas Lohia | Pune (M Corp.) | Pune |
| Vijaykumar Santoshchand Jain | Mumbai City | Mumbai City |
| M/s Hindumal Balmukund Investment Co Pvt Ltd | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Tower 4 | NA | Rs 21.52 cr | Rs 21.52 cr |
| Tower 5 | NA | Rs 21.51 cr | Rs 21.51 cr |
| - | NA | Rs 9.44 cr | Rs 9.44 cr |
| Commercial Block | NA | Rs 1.37 cr | Rs 1.37 cr |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sanjeev Mehta |
| Architect | Mangesh Gotal |
| Engineer | Dheeraj Agarwal |
| Engineer | Ramshankar Sharma |
| Engineer | Sagar Kale |
| Engineer | MS JW consultant LLP |
| Chartered Accountant | SAC & Co LLP |
| Chartered Accountant | B Chhawchharia & CO. |
| Partner | Role in project |
|---|---|
| Ashiana Housing Limited | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12400971 | Ashiana Housing Limited | Late Jacob Paul Through his LH Suseela Vergis | 02/12/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Jun 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Aug 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Aug 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 May 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Oct 2026
Documents filed108
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: AC Malhar Phase 1 Form 1.pdf | 5 Oct 2026 |
| Withdrawal Update Form 2File: Malhar Phase I Form 2 (1).pdf | 5 Oct 2026 |
| Withdrawal Update Form 3File: Form 3 Malhar Phase 1.pdf | 5 Oct 2026 |
| Form 5 (FY 2025-2026)File: Form 5 Ashiana Malhar Phase 1.pdf | 4 Oct 2026 |
| Layout approvalFile: 2024 layout plan_compressed.pdf | 18 Aug 2026 |
| Building plan approvalFile: 2021 layout_compressed.pdf | 18 Aug 2026 |
| Building plan approvalFile: 2021 parking.pdf | 17 Aug 2026 |
| Building plan approvalFile: 2021 building layout.pdf | 17 Aug 2026 |
| Building plan approvalFile: 2021 layout of buildings.pdf | 17 Aug 2026 |
| Building plan approvalFile: 2021 T5 building layout_compressed.pdf | 17 Aug 2026 |
| Layout approvalFile: 2024 layout_compressed.pdf | 17 Aug 2026 |
| Building plan approvalFile: 3-14 Parking Layout_compressed.pdf | 17 Aug 2026 |
| Layout approvalFile: Development Permission (2).pdf | 17 Aug 2026 |
| Building plan approvalFile: Commercial Block.pdf | 28 Jul 2026 |
| Building plan approvalFile: T4 T5 3_compressed.pdf | 28 Jul 2026 |
| Building plan approvalFile: T4 T5 2_compressed.pdf | 28 Jul 2026 |
| Building plan approvalFile: Section AA Elevation_compressed (1).pdf | 28 Jul 2026 |
| Building plan approvalFile: T4 T 5 4_compressed.pdf | 28 Jul 2026 |
| Building plan approvalFile: T4 T 5 1_compressed.pdf | 28 Jul 2026 |
| Building plan approvalFile: T 4 T 5_compressed.pdf | 28 Jul 2026 |
| Form 2A (FY 2024-2025)File: Form 2a Malhar Phase 1 .pdf | 21 Jul 2026 |
| Withdrawal Update Form 1File: AC Malhar Phase 1 Form 1.pdf | 20 Jul 2026 |
| Withdrawal Update Form 1File: AC Malhar Phase 1 Form 1.pdf | 20 Jul 2026 |
| Withdrawal Update Form 2File: Malhar Phase I Form 2 (1).pdf | 20 Jul 2026 |
| Withdrawal Update Form 2File: Malhar Phase I Form 2 (1).pdf | 20 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 Malhar Phase 1.pdf | 20 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 Malhar Phase 1.pdf | 20 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2a Malhar Phase 1 24-25.pdf | 20 Jul 2026 |
| Form 5 (FY 2024-2025)File: Malhar Phase 1 Form 5 24-25.pdf | 20 Jul 2026 |
| Form 2A (FY 2022-2023)File: FORM 2A - M1 - 22 - 23.pdf | 15 May 2026 |
| Form 2A (FY 2023-2024)File: FORM 2A - M1 - 23 - 24.pdf | 15 May 2026 |
| Withdrawal Update Form 1File: Form 1 - Malhar 1- Jun 25.pdf | 7 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1 - Malhar 1 - Sep 25.pdf | 7 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1 - M1 - Dec 25.pdf | 7 Feb 2026 |
| Withdrawal Update Form 2File: FORM 2 - Malhar 1 - Jun 25.pdf | 7 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 - Malhar PH-1 - Sep 25.pdf | 7 Feb 2026 |
| Withdrawal Update Form 2File: FORM 2 - M1 - Dec 25.pdf | 7 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3 - Malhar 1- Jun 25_compressed.pdf | 7 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 - Malhar 1 - Sep 25_compressed.pdf | 7 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3 - M1 - Dec 25.pdf | 7 Feb 2026 |
| Disclosure of sold/ booked inventoryFile: Malhar Phase 1 - Inventory - 31032025.pdf | 6 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Malhar Phase 1 31032025.pdf | 22 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 2 - Malhar 1 - signed-13-16.pdf | 22 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 03 Malhar 1_compressed.pdf | 22 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Malhar 1 - signed-13-16.pdf | 22 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory - Malhar 1 - 31122024.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - MALHAR 1 31122024 - signed.pdf | 18 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - Ashiana Malhar Phase I 31122024 - signed - compressed.pdf | 18 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Malhar 1 31122024.pdf | 18 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Malhar I 30092024.pdf | 21 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - MALHAR 1 30092024.pdf | 16 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - MALHAR 1 30092024_compressed.pdf | 16 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - MALHAR 1 30092024.pdf | 16 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A - Malhar I - 23.pdf | 8 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SKM_C227i24100805560.pdf | 8 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Malhar Ph-1 Annual Rera FY 2023-24.pdf | 7 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Malhar 1 - 30062024.pdf | 19 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Malhar Ph 1 - signed.pdf | 16 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Malhar 1 - signed.pdf | 16 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - Malhar 1 - signed_compressed.pdf | 16 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Malhar Ph-1.pdf | 16 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: phase I.pdf | 12 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase1.pdf | 12 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect.pdf | 19 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginner Certificate.pdf | 19 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA- Phase1.pdf | 19 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 0438_001-Eng.pdf | 18 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 30 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 30 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Malhar Phase I CA Certificate DSC.pdf | 27 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Xerox Scan_30092023113456.pdf | 30 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3_MalharI_Signed.pdf | 31 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ArchitectCertificate.pdf | 19 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EngineerCertificate.pdf | 19 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: March23Architect.pdf | 27 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2910_001_Engrrg.pdf | 27 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Form 3 - Ashiyana Malhar_Q3 DSC.pdf | 31 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Signed.pdf | 7 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Signed.pdf | 7 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Q2.pdf | 7 Jan 2023 |
Promoter's earlier projects33
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Anmol Phase III and Plaza Phase II | revenue estate of Village-Dhulena Sector 33 Tehsil-Sohna Distt Gurgaon Haryana | 300 | Ongoing | Dec 2028 | Dec 2028 |
| Ashiana Malhar | Marunji Taluka Mulshi District Pune Maharashtra | 220 | Ongoing | Oct 2026 | Oct 2026 |
| Ashiana Tarang Phase IVB | Revenue Village of Milakpur Gurjar Tehsil Tijara Bhiwadi Distt Alwar Rajasthan | 48 | Ongoing | Jun 2026 | Jun 2026 |
| Ashiana Shubham Phase IVB | Sengundram Village Govindapuram Hamlet Maraimalai Nagar Municipal Limit Chengalpet Tamil Nadu | 140 | Ongoing | Dec 2025 | Dec 2025 |
| Ashiana Tarang Phase IVA | Revenue Village of Milakpur Gurjar Tehsil Tijara Bhiwadi Distt. Alwar Rajasthan | 26 | Ongoing | Nov 2025 | Nov 2024 |
| Ashiana Amantran Phase III | village Keshopura Tehsil Sanganer Jaipur | 224 | Ongoing | Aug 2025 | Aug 2025 |
| Ashiana Amantran Phase-II | Jaipur | 56 | Ongoing | Jun 2025 | Jun 2025 |
| AshianaAmantran Phase-I | Jaipur | 224 | Ongoing | Dec 2024 | Dec 2024 |
| Ashiana Nirmay Phase IV | Bhiwadi | 151 | Ongoing | Dec 2024 | Dec 2024 |
| Ashiana Dwarka Phase IV | Jodhpur | 96 | Ongoing | Oct 2024 | Oct 2024 |
| Ashiana Daksh Phase-II | Jaipur | 192 | Ongoing | Oct 2024 | Oct 2024 |
| Ashiana Tarang-III | Bhiwadi | 96 | Completed | Jul 2024 | Jul 2024 |
| Ashiana Daksh, Phase-I | Jaipur | 341 | Completed | Jul 2024 | Jul 2024 |
| Ashiana Daksh Phase III | Village Srikishanpura Tehsil Sanganer Distt Jaipur Rajasthan | 96 | Completed | Jul 2024 | Jul 2024 |
| Ashiana Shubham Phase IVA | Sengundram Village Govindapuram Hamlet Maraimalai Nagar Municipal Limit Chengalpet Taluk Kancheepuram District Tamil Nadu | 220 | Completed | Mar 2024 | Mar 2024 |
| Ashiana Aditya Phase-II | Jamshedpur | 200 | Completed | Jan 2024 | Jan 2024 |
| Ashiana Aditya Phase-I | Jamshedpur | 250 | Completed | Jun 2023 | Jun 2021 |
| Ashiana Dwarka Phase III | Jodhpur | 96 | Completed | May 2023 | May 2023 |
| Ashiana Dwarka Phase II | Jodhpur | 96 | Completed | May 2023 | May 2023 |
| Ashiana Sehar | Jamshedpur | 239 | Completed | Jan 2023 | Jan 2023 |
| AshianaNirmay Phase III | Bhiwadi | 192 | Completed | Dec 2022 | Dec 2022 |
| Ashiana Shubham Phase III | Sengundram Village Govindapuram Hamlet Maraimalai Nagar Municipal Limit Chengalpet Taluk Kancheepuram Chennai Tamil Nadu | 172 | Completed | Oct 2022 | Oct 2022 |
| Ashiana Tarang-II | Bhiwadi | 48 | Completed | May 2022 | May 2022 |
| Ashiana Umang Phase IV | Jaipur | 192 | Completed | Oct 2021 | Oct 2021 |
| Ashiana Umang Ph-V and Umang Plaza | Jaipur | 304 | Ongoing | Oct 2021 | Late, Oct 2024 |
| AshianaNirmay Phase II | Bhiwadi | 96 | Completed | May 2021 | May 2021 |
| Ashiana Shubham Phase II | Sengundram Village Govindapuram Hamlet Maraimalai Nagar Municipal Limit Chengalpet Taluk Kancheepuram District Tamil Nadu | 144 | Completed | Mar 2021 | Mar 2021 |
| Ashiana Sehar | Jamshedpur | 239 | Completed | Jan 2021 | Jan 2021 |
| Anmol Phase I | revenue estate of Village-Dhunela Sector 33 Tehsil- Sohna Distt Gurugram Haryana | 300 | Completed | Oct 2020 | Oct 2020 |
| Anmol Phase II | revenue estate of Village-Dhunela Sector 33 Tehsil- Sohna Distt Gurugram Haryana | 280 | Completed | Apr 2020 | Apr 2020 |
| Ashiana Dwarka EWS/LIG | Jodhpur | 102 | Completed | May 2019 | May 2019 |
| AshianaTarang Phase IA | Bhiwadi | 104 | Completed | Apr 2019 | Late, Apr 2021 |
| Ashiana Shubham Phase I | Sengundram Village Govindapuram Hamlet Maraimalai Nagar Municipal Limit Chengalpet Taluk Kancheepuram District Tamil Nadu | 144 | Completed | Jun 2017 | Jun 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 7 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 108 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Ashiana Malhar Phase I and Commercial Block on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Pune13,700+ in Pune
Filed coordinates, straight-line distance. 43 registered projects within 2 km.
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
VTP BELLISSIMO PHASE 1
MAGNITE DEVELOPERS PRIVATE LIMITED
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Builder: Ashiana Housing Limited
Ashiana Housing Limited has 8 registrations on MahaRERA, including Ashiana Malhar Phase I and Commercial Block and Ashiana Amodh Phase I. Its filings disclose 32 earlier MahaRERA projects: declares 30 of 32 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Ashiana Malhar Phase I and Commercial Block is delayed beyond 31 Oct 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Ashiana Malhar Phase I and Commercial Block?
The registered promoter entity is Ashiana Housing Limited, a company as per the filing. Its CIN L70109WB1986PLC040864 and GSTIN 27AADCA9093P1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Ashiana Malhar Phase I and Commercial Block?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Ashiana Malhar Phase I and Commercial Block?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Ashiana Malhar Phase I and Commercial Block?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Ashiana Malhar Phase I and Commercial Block?
The professionals named in the filing: Architect: Sanjeev Mehta; Architect: Mangesh Gotal; Engineer: Dheeraj Agarwal; Engineer: Ramshankar Sharma; Engineer: Sagar Kale; Engineer: MS JW consultant LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Ashiana Malhar Phase I and Commercial Block?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback