ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / ARUNODAY PLAZA

Registered No litigation declared Mixed project

ARUNODAY PLAZA

By SANKALP BUILDERS

RG-MH-32326 · RERA PM1330002500818 · Last updated on MahaRERA portal: 20 Jun 2026

Source: official MahaRERA filing

Red flags

  • Allotment letter deviates from the model form

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
3 of 9Construction stages donefurthest along: Internal walls, 70%
24 of 28Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 11 documents Report an error

ARUNODAY PLAZA is a Mixed project by SANKALP BUILDERS in Thane, Maharashtra, registered with MahaRERA as PM1330002500818 on 17 Sep 2025. Possession is promised by 31 Dec 2026. 4 of the 28 units on this registration are recorded sold or booked, and 3 of 9 construction stages are filed complete.

At a glance

Project

  • NameARUNODAY PLAZA
  • TypeMixed
  • Location
    • Survey No 77 Hissa No 24
    • Devrung
    • Bhiwandi
    • Thane
    • 421302
  • Pincode421302
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PM1330002500818
  • ReraGenie IDRG-MH-32326

Builder

  • NameSANKALP BUILDERS
  • Entity typePartnership
  • GSTIN27AEFFS6555P1Z6
  • PartnersSHATRUGHAN ASHOK BHOIR, BANDU ASHOK BHOIR, MANOHAR NARAYAN YASHWANTRAO, CHANDRAKANT LALA SHELAR, RAMPAL SOHANSINGH PUROHIT, SHAMAL MANGESH GAIKAR

Key dates

this monthRegisteredSep 2025PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Sep 2025
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed11 files

Current status

14%4 of 28 units booked
100.0%Work done, per cost certificate

Figures as on 20 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Arunoday PlazaNA5525328

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 9 construction stages are filed complete. The stage furthest along is Internal walls, at 70%.

Arunoday Plaza: 76% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor60%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%

Progress on shared amenities15

As on 20 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed28

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots28
Stilt / Ground28

Land and ownership15

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area800 sq m
Land owned byNot the promoter
Named landowners15
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Jul 2025
LandownerVillageDistrict
SANTOSH BALRAM KANEDevrungThane
Motiram Dharma KeneDevrungThane
Baliram Dharma Kene-Thane
Radhabai Eknath Kene-Thane
Ujawala Eknath Kene Alias Ujwala Ananta Mhatre-Thane
Jaymala Eknath Kene Alias Jaymala Sanjay Wakade-Thane
Kavita Gajanan Dalvi-Thane
Kantabai Janardan Navale-Thane
Shantaram Balaram Kene-Thane
Taibai Shalik Kene-Thane
Puja Naresh Surekar-Thane
Aarti Ratan Masane-Thane
Sonam Mukesh Patil Alias Sonam Shalik Kene-Thane
Prasad Shalik Kene-Thane
Vishakha Shalik Kene-Thane

Approvals and building plan

Sanctioning authorityAssistant Director of Town Planning Thane
Permissible FSI1472.84
Proposed, not sanctioned1,472 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJEEVARSHREE, JAMUNBAUG COMPOUND, AGRA ROAD,SHIVAJI CHOWK KAYLAN(W)421 301
Estimated costRs 1.85 cr
Cost incurredRs 1.85 cr
Work done100.0%
BuildingWingEstimatedIncurred
Arunoday PlazaNARs 1.76 crRs 1.76 cr
-NARs 9.25 lakhRs 9.25 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDHIRAJ BHARAT PATIL
EngineerADITYA RAJAN DESHMUKH
Chartered AccountantSANTOSH KUMAR PADHI
Chartered AccountantDEEPAK HIMAJI PUROHIT
PartnerRole in project
SANKALP BUILDERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalNot on the file

    The planning authority's approval of how the plots and buildings sit on the land.

  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Jul 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed11

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM -1.pdf20 Jun 2026
Withdrawal Update Form 2File: 31-03-2026 SANKALP BUILDERS .pdf20 Jun 2026
Withdrawal Update Form 3File: FORM -3.pdf20 Jun 2026
Withdrawal Update Form 1File: Form 1 (31-12-2025).pdf17 Jun 2026
Withdrawal Update Form 2File: 31-12-2025 SANKALP BUILDERS .pdf17 Jun 2026
Withdrawal Update Form 3File: SIGNED FORM 3.pdf17 Jun 2026
Withdrawal Update Form 1File: Form 1 (30-09-2025).pdf14 May 2026
Withdrawal Update Form 2File: FORM - 2 .pdf14 May 2026
Withdrawal Update Form 3File: SIGNED- FORM 3.pdf14 May 2026
Building plan approvalFile: scan0964.pdf8 Jul 2025
Declaration and undertaking (Annexure A)File: Annexure 'A' - Declaration cum Undertaking.pdf2 Jun 2025

How this compares with Thane

14%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ARUNODAY PLAZA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Devrung7,600+ in Thane

2 kmARUNODAY PLAZACompleted 12Lapsed / revoked 32Other 28Dot size: filed unitsN

Filed coordinates, straight-line distance. 72 registered projects within 2 km.

Builder: SANKALP BUILDERS

SANKALP BUILDERS has 1 registration on MahaRERA, including ARUNODAY PLAZA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if ARUNODAY PLAZA is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ARUNODAY PLAZA?

The registered promoter entity is SANKALP BUILDERS, a partnership as per the filing. Its GSTIN 27AEFFS6555P1Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ARUNODAY PLAZA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ARUNODAY PLAZA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ARUNODAY PLAZA?

The professionals named in the filing: Architect: DHIRAJ BHARAT PATIL; Engineer: ADITYA RAJAN DESHMUKH; Chartered Accountant: SANTOSH KUMAR PADHI; Chartered Accountant: DEEPAK HIMAJI PUROHIT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARUNODAY PLAZA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARUNODAY PLAZA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARUNODAY PLAZA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.