Arkaya Phase I

By High Yield Fortune Pvt Ltd

RG-MH-73658 · RERA P52100054318 · Last updated on MahaRERA portal: 30 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 4 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2028Possession promisedmoved 24 months from the original
3 of 11Construction stages donefurthest along: Internal walls, 60%
26 of 40Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 104 documents Report an error

Arkaya Phase I is a Residential / Group Housing project by High Yield Fortune Pvt Ltd in Pune, Maharashtra, registered with MahaRERA as P52100054318 on 15 Jan 2024. Possession is promised by 31 Oct 2028. The completion date has moved by 24 months from the original filing. 14 of the 40 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameArkaya Phase I
  • TypeResidential / Group Housing
  • Location
    • Bori Bhadak
    • Boribhadak
    • Daund
    • Pune
    • 412202
  • Pincode412202
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100054318
  • ReraGenie IDRG-MH-73658

Builder

  • NameHigh Yield Fortune Pvt Ltd
  • Entity typeCompany
  • CINU45401PN2020PTC192582
  • DirectorsVishal Vilas Chavan, Jyotiprasad Vilas Chavan, Rupesh Vilas Chavan, Mugdha Rupesh Chavan
  • Other registrations2 more →
  • Past their filed date1
  • Declared earlier projects10 →

Key dates

this monthRegisteredJan 2024First promiseOct 2026Revised toOct 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Jan 2024
  • Promised completion31 Oct 2028
  • Revised completionRevised to 31 Oct 2028 (originally 31 Oct 2026)
  • Buildings1 building record
  • Documents filed104 files

Current status

35%14 of 40 units booked
2.7%Work done, per cost certificate

Figures as on 30 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building CNA4440040

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 60%.

Building C: 33% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes25%
Water SupplyYes65%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes35%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes20%

Parking filed100

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots100
Open Space100

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,531 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Sep 2024

Approvals and building plan

Sanctioning authorityPune Metropolitan Regional Development Authority, Pune
Permissible FSI1528.4
Proposed, not sanctioned1,528 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShowroom No A, B Wing, KPCT Mall, Fatima Nagar, Wanowrie, Pune, Maharashtra 411040
Estimated costRs 13.10 cr
Cost incurredRs 35.07 lakh
Work done2.68%
BuildingWingEstimatedIncurred
Building CNARs 9.99 crRs 34.95 lakh
-NARs 3.11 crRs 12,440

Certifying professionals and partners12

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectEpiq Design Pvt Ltd
ArchitectVishal Jadhav
ArchitectEpic Design Pvt ltd
EngineerHimanshu Tulpule
EngineerKishor R Nikam
EngineerKishor Nikam
EngineerBhausaheb Arote
Chartered AccountantJagdish Salunkhe
Chartered AccountantAshwin Kapoor
Chartered AccountantJSVL and CO
Chartered AccountantKunal Joshi
Chartered AccountantPritesh Munot
PartnerRole in project
High Yield Fortune Pvt Ltd-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100028142Oct 2026 → Oct 2028

Reason as filed by the promoterInitially, we had anticipated that the project would be completed and possession handed over to the allottees by 31/10/2026. However, in the meantime after further assessment, we have determined that additional time is required to ensure the successful completion of the project. And consequently, we will have to give clearer intimation to the prospective customers about the possession date. In light of this, we respectfully request an extension of the completion date for the project from 31/10/2026 to 31/10/2028. This extension will provide the necessary time to address any evolving requiremen

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2028

Documents filed104

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Arkaya p1 Form 2A Sign Stamp.pdf30 Jun 2026
Withdrawal Update Form 1File: Form-1-Arkaya Phase-Q2.pdf3 Jun 2026
Withdrawal Update Form 1File: Form-1-Arkaya Phase-Q3.pdf3 Jun 2026
Withdrawal Update Form 1File: Q4 Form 1 Arkaya.pdf3 Jun 2026
Withdrawal Update Form 2File: Form-2-Arkaya Phase-Q2.pdf3 Jun 2026
Withdrawal Update Form 2File: Form-2-Arkaya Phase-Q3.pdf3 Jun 2026
Withdrawal Update Form 2File: Q4 Form 2 Arkaya.pdf3 Jun 2026
Withdrawal Update Form 3File: Form 3 Arkaya Q2 c.pdf3 Jun 2026
Withdrawal Update Form 3File: Form 3 Arkaya Q3 c.pdf3 Jun 2026
Withdrawal Update Form 3File: Q4 Form 3 Arkaya c.pdf3 Jun 2026
Form 2A (FY 2024-2025)File: Foresta-II Form-2A(2024-25).pdf12 May 2026
Form 1File: Form 1 Architech's Certificate Q4.pdf30 Sep 2025
Form 2File: Form 2 - Q4 23-24 Engineer.pdf30 Sep 2025
Form 3File: Form 3 _Q4_FY 23-24_Final (1).pdf30 Sep 2025
Disclosure of Sold and Booked InventoryFile: Arkaya Ph-1 Disclosure Certificate (1).pdf30 Sep 2025
Form 1File: Form 1 - Q1 Certificate of Project Architect_Final.pdf30 Sep 2025
Form 2File: Form 2 - Q1 24-5 Engineer.pdf30 Sep 2025
Form 3File: Form 3 _Q1_FY 24-25_Final.pdf30 Sep 2025
Disclosure of Sold and Booked InventoryFile: Arkaya Ph-1 Disclosure Certificate Q1.pdf30 Sep 2025
Withdrawal Update Form 1File: Form 1_Q1 25-26_Arkaya Phase I.pdf30 Sep 2025
Withdrawal Update Form 2File: Form 2_Q1 25-26_Arkaya Phase I.pdf30 Sep 2025
Withdrawal Update Form 3File: Form 3_Q1 25-26_Arkaya Phase I .pdf30 Sep 2025
Form 1File: Form 1 - Q2 Certificate of Project Architect_Final.pdf1 Jul 2025
Form 2File: Form 2 - Q2 24-25 Engineer.pdf1 Jul 2025
Form 3File: Form 3 _Q2_FY 24-25_Final.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: Arkaya Ph-1 Disclosure Certificate .pdf1 Jul 2025
Form 1File: Form 1 Q3 24-25.pdf1 Jul 2025
Form 2File: Form 2 Q3 24-25.pdf1 Jul 2025
Form 3File: Form 3 Q3 24-25.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: ARKAYA PHASE I DISCLOSURE.pdf1 Jul 2025
Form 1File: Form 1 - Q2 Certificate of Project Architect.pdf1 Jul 2025
Form 2File: Form 2 Arkaya.pdf1 Jul 2025
Form 3File: Form 3_Q4 24-25_Arkaya Phase I (2).pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold units.pdf1 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Q2 Certificate of Project Architect.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q4 24-25_Arkaya Phase I (2).pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Arkaya.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold units.pdf19 Apr 2025
Declaration in FORM BFile: Form B.pdf8 Apr 2025
Disclosure of sold/ booked inventoryFile: ARKAYA PHASE I DISCLOSURE.pdf8 Apr 2025
Disclosure of sold/ booked inventoryFile: Arkaya Ph 1 Disclosure.pdf8 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf29 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_Arkaya Ph I_2023_2024.pdf29 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: Gmail - Shere.pdf28 Mar 2025
Other - TechnicalFile: Gmail - Shere.pdf28 Mar 2025
Deviation Report with respect to model copy of AgreementFile: Daviation Report updated c.pdf27 Mar 2025
Proforma of Agreement for saleFile: arkaya updated AFS agreement.pdf27 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3 24-25.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3 24-25.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3 24-25.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architech's Certificate Q4.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Q1 Certificate of Project Architect_Final.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Q2 Certificate of Project Architect_Final.pdf30 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 _Q4_FY 23-24_Final (1).pdf30 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 _Q1_FY 24-25_Final.pdf30 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 _Q2_FY 24-25_Final.pdf30 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Q4 23-24 Engineer.pdf30 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Q1 24-5 Engineer.pdf30 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Q2 24-25 Engineer.pdf30 Dec 2024
Disclosure of sold/ booked inventoryFile: Arkaya Ph-1 Disclosure Certificate .pdf5 Aug 2024
Proforma of Agreement for saleFile: AFS Updated.pdf26 Apr 2024
Deviation Report with respect to model copy of AgreementFile: Daviation Report updated c.pdf26 Apr 2024
Layout approvalFile: 1-14 Site Plan.pdf18 Jan 2024
Building plan approvalFile: 1-14 Site Plan.pdf18 Jan 2024
Building plan approvalFile: 2-14 Contour, Parking Layout, Site Section.pdf18 Jan 2024
Building plan approvalFile: 12-14 Building C - Residential.pdf18 Jan 2024
Building plan approvalFile: 13-14 Building C - Floor Plan Elevation and Sections.pdf18 Jan 2024
Copy of Layout Approval (in case of layout)File: 1-14 Site Plan.pdf18 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 1-14 Site Plan.pdf18 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 2-14 Contour, Parking Layout, Site Section.pdf18 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 12-14 Building C - Residential.pdf18 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 13-14 Building C - Floor Plan Elevation and Sections.pdf18 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_408.pdf1 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_409.pdf1 Jan 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report of Agreement Format.pdf14 Dec 2023
Deviation Report with respect to Allotment letterFile: Deviation Report of Allotment Letter.pdf5 Dec 2023
Proforma of Allotment letterFile: Allotment Letter - Signed ( Model Format) (1).pdf4 Dec 2023
Copy of the legal title reportFile: 1_updated_Gat No 8.pdf2 Dec 2023
Copy of the legal title reportFile: Updated Gat No 9.pdf2 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest - Rupesh Chavan.pdf2 Dec 2023

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise
ProjectLocationStatusPromisedDelivered
ELITE PHIIBORIANDICompletedJan 2019Jan 2019
Wai woodsGat No 618 635 636 207 warkhadi wadi Tal Wai Dist SataraCompletedFeb 2018Feb 2018
Golden AcersGat no 44 Borate Vasti Tal Daund Dist PuneCompletedAug 2016Aug 2016
EliteGat No 407 Boribhadak Tal Daund Dist PuneCompletedJul 2015Jul 2015

How this compares with Pune

35%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Arkaya Phase I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bori Bhadak13,700+ in Pune

Builder: High Yield Fortune Pvt Ltd

High Yield Fortune Pvt Ltd has 3 registrations on MahaRERA, including Foresta Phase II and Arkaya Phase I. Its filings disclose 10 earlier MahaRERA projects: declares 4 of 7 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Arkaya Phase I is delayed beyond 31 Oct 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Arkaya Phase I?

The registered promoter entity is High Yield Fortune Pvt Ltd, a company as per the filing. Its CIN U45401PN2020PTC192582 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Arkaya Phase I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Arkaya Phase I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Arkaya Phase I?

The professionals named in the filing: Architect: Epiq Design Pvt Ltd; Architect: Vishal Jadhav; Architect: Epic Design Pvt ltd; Engineer: Himanshu Tulpule; Engineer: Kishor R Nikam; Engineer: Kishor Nikam. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Arkaya Phase I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Arkaya Phase I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Arkaya Phase I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.