Registered No litigation declared Others project

Green Fantasy Phase-I

By Shree Mangalmurti Associates Phase-I

RG-MH-48213 · RERA P52100016541 · Last updated on MahaRERA portal: 22 Apr 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 57 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 57 months from the original
10 of 22Construction stages doneacross 2 buildings; furthest along: Sanitary Fittings within the flats /..., 70%
168 of 278Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 110 documents Report an error

Green Fantasy Phase-I is a Others project by Shree Mangalmurti Associates Phase-I in Pune, Maharashtra, registered with MahaRERA as P52100016541 on 23 May 2018. Possession is promised by 31 Dec 2027. The completion date has moved by 57 months from the original filing. 110 of the 278 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameGreen Fantasy Phase-I
  • TypeOthers
  • Location
    • Pune Solapur Road
    • Uruli Kanchan
    • Haveli
    • Pune
    • 412202
  • Pincode412202
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100016541
  • ReraGenie IDRG-MH-48213

Builder

  • NameShree Mangalmurti Associates Phase-I
  • Entity typePartnership
  • GSTIN27ACQFS9759J1ZZ
  • PartnersATIT SHRIKANT ADMULWAR, KIRAN VASANT PAWAR, ATUL SITARAM HARPALE, GAJANAN SAHEBRAO HARPALE, PRAVIN RAVINDRA KOKATE, RAHUL DATTATRAY KUNJIR, YOGESH NAMDEV CHOUDHARI, AVINASH ASHOK KUNJIR, ABA BALASAHEB CHAUDHARI, RAMCHANDRA KRISHNARAO RANDHAVE, DILIP SHIVAJI UNDRE, DEVIDAS DNYANOBA KADAM
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredMay 2018First promiseMar 2023Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 May 2018
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Mar 2023)
  • Buildings2 building records
  • Documents filed110 files

Current status

40%110 of 278 units booked
100.0%Work done, per cost certificate

Figures as on 22 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA101013920159
Wing CNA10101190119

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 22 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 70%.

Wing A75%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%
Wing C46%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 22 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed73

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots73
Open Space73
BuildingOpen SpaceTotal
Wing A3030
Wing C4343

Land and ownership18

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,915 sq m
Land owned byThe promoter, with other names on the file
Named landowners18
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Jul 2025
LandownerVillageDistrict
Anita Ratikant Yadav & other'sUruli KanchanPune
Balasaheb Gopalrao Kanchan & OtherUruli KanchanPune
Dattatray Bhagwan Darekar & OthersUruli KanchanPune
Dhanaji Gopalrao KanchanUruli KanchanPune
Govind Rambhau TapkirUruli KanchanPune
Kailas Gopal KanchanUruli KanchanPune
Laxman Vitthal KanchanUruli KanchanPune
Pandurang Vitthal KanchanUruli KanchanPune
Ramdas Vitthal KanchanUruli KanchanPune
Vilas Gopalrao KanchanUruli KanchanPune
Vilas Karbhari KanchanUruli KanchanPune
Madhu KaleUruli KanchanPune
Bapuso Mukunda KanchanUruli KanchanPune
Balasaheb DarekarUruli KanchanPune
Narayan DarekarUruli KanchanPune
Sujata KhedkarUruli KanchanPune
Sanjay KhedekarUruli KanchanPune
Tulsabai KhedekarUruli KanchanPune

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority
Permissible FSI24064.97
Proposed, not sanctioned12,920 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLoni Kalbhor Pune
Estimated costRs 46.27 cr
Cost incurredRs 46.27 cr
Work done100.0%
BuildingWingEstimatedIncurred
Wing ANARs 21.48 crRs 21.48 cr
Wing CNARs 21.48 crRs 21.48 cr
-NARs 3.30 crRs 3.30 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAtit ADMULWAR
Engineervaibhav mane
Chartered AccountantYogesh D Mali
Chartered AccountantRITESH SHAH
PartnerRole in project
Shree Mangalmurti Associates Phase-I-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100015136Mar 2023 → Mar 2024

Reason as filed by the promoterDue to labour and material cost increase, booking issue, Corona Pandemic DP Reservation Issue

EXT52100019392Mar 2023 → Mar 2026

Reason as filed by the promoterReason for delay is due to material cost increases, booking issue & PMRDA DP Reservation issue.

EA09032620142Mar 2023 → Dec 2027

Reason as filed by the promoterIn this project, the work could not be completed after 2020 due to financial constraints, resulting in the site remaining closed for a considerable period. The work has now been resumed, and we are taking all necessary steps to complete the project and obtain the Completion Certificate. The delay in the project has been primarily caused by material shortages, labor shortages, and insufficient funding.

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC005000000177873Deepak Anil VermaJeevan Atkire29/11/2022
CC005000000471522Deepak Anil VermaJeevan Atkire11/08/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 May 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 May 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 May 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 May 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed110

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 110 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architects Certificate RERA 31-12-2025 NEW (1).pdf22 Apr 2026
Withdrawal Update Form 1File: Form 1 Architects Certificate RERA 31-03-2026 NEW.pdf22 Apr 2026
Withdrawal Update Form 2File: Form -2 Engineer Certificate RERA (P-I) 31-12-2025 NEW (05-01-2026) NEW.pdf22 Apr 2026
Withdrawal Update Form 2File: Form -2 Engineer Certificate RERA (P-I) 31-03-2026 NEW (14-04-2026) NEW.pdf22 Apr 2026
Withdrawal Update Form 3File: form 3.pdf22 Apr 2026
Withdrawal Update Form 3File: form 3.pdf22 Apr 2026
Withdrawal Update Form 1File: Form 1 Architects Certificate RERA 31-12-2025 NEW (1).pdf7 Mar 2026
Withdrawal Update Form 2File: Form -2 Engineer Certificate RERA (P-I) 31-12-2025 NEW (05-01-2026) NEW.pdf7 Mar 2026
Withdrawal Update Form 3File: form 3 (11).pdf7 Mar 2026
Withdrawal Update Form 1File: Form 1 Architects Certificate RERA 31-03-2024 NEW.pdf5 Mar 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate 310324.pdf5 Mar 2026
Withdrawal Update Form 3File: MANGAL MURTI CA.pdf5 Mar 2026
Form 1File: form 1 green fansty.pdf1 Dec 2025
Form 2File: form 2 green fansty.pdf1 Dec 2025
Form 3File: Form-3 CA grren fansty.pdf1 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold inventry.pdf1 Dec 2025
Form 1File: form 1.pdf22 Jul 2025
Form 2File: Form -2 Engineer Certificate RERA (P-I) 31-03-2025 NEW (16-07-2025).pdf22 Jul 2025
Form 3File: ca.pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf22 Jul 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate 310324.pdf30 May 2024
Certificates of CA (Form 3)File: Form3 CA Certificate PH I 310324.pdf30 May 2024
Certificates of CA (Form 3)File: Form-3 CA Certificate PH I.pdf23 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 31-03-2024 NEW.pdf9 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate RERA 31-03-2024 NEW.pdf11 Apr 2024
Declaration in FORM BFile: Form B Developers (P-I) 10-04-2024.pdf10 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 31-03-2024 NEW.pdf10 Apr 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE FOR SOLD BOOKED UNITS (P- I) 31-03-2024.pdf10 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate RERA 31-12-2023 NEW.pdf24 Feb 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE FOR SOLD BOOKED UNITS (P- I) 31-12-2023.pdf24 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form -2 Engineer Certificate RERA (P-I) 31-12-2023 NEW.pdf19 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 31-12-2023 NEW.pdf19 Feb 2024
Certificates of CA (Form 3)File: Form-3 CA Certificate.pdf19 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 30-06-2023 NEW.pdf29 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 30-09-2023 NEW.pdf29 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A (Disclosure of Interest in Other Real Estate Organizations).pdf22 Nov 2023
CERSAI detailsFile: Cersai Charge Release Certificat VSBL.pdf20 Nov 2023
Certificates of CA (Form 3)File: P-I.pdf20 Nov 2023
Certificates of CA (Form 3)File: Form 3 CA Certificate RERA 30-09-2023_compressed.pdf11 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate RERA 31-03-2023 NEW.pdf30 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5 CA Certificate PH I (2022-2023).pdf25 Oct 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE FOR SOLD BOOKED UNITS (P- I) 15-10-2023.pdf14 Oct 2023
Certificates of CA (Form 3)File: Form-3 CA.pdf14 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form -2 Engineer Certificate RERA (P-I) 31-03-2023 NEW.pdf13 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 30-06-2022 NEW.pdf13 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 30-09-2022 NEW.pdf13 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 31-12-2022 NEW.pdf13 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 31-03-2023 NEW.pdf13 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate RERA 10-01-2023 NEW.pdf24 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form -2 Engineer Certificate RERA (P-I) 31-12-2022 15-01-2023 NEW.pdf24 Mar 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE FOR SOLD BOOKED UNITS (P- I) 31-12-2022.pdf24 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: SMA Form 5 PH -I 2018-19 (1).pdf18 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form -2 Engineer Certificate RERA (P-I) 31-03-2021 NEW (Revised) (2).pdf23 Jan 2023
Certificates of CA (Form 3)File: ca3.pdf23 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form-5 CA Certificate PH I (2019-2020).pdf23 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form-5 CA Certificate PH I (2020-2021).pdf23 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form-5 CA Certificate PH I (2021-2022).pdf23 Jan 2023
Other - FinanceFile: VSBL Bank SMMA Loan Saction Lettar.pdf12 Sep 2022
Other - FinanceFile: VSBL Restruction Bank SMMA Loan Saction Lettar.pdf12 Sep 2022
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate (P- I) 01-09-2021.pdf10 Sep 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate (P- I) 01-09-2021.pdf10 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 31-04-2021.pdf10 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form -2 Engineer Form For RERA (P-I) 01-09-2021.pdf10 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 31-07-2020.pdf10 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 31-10-2020.pdf10 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 31-07-2020.pdf10 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 31-01-2021.pdf10 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 31-04-2021.pdf10 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 31-07-2020.pdf10 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 31-10-2020.pdf10 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 31-01-2021.pdf10 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 31-04-2021.pdf10 Sep 2021
Disclosure of sold/ booked inventoryFile: DISCLOSURE FOR SOLD BOOKED UNITS (P- I) 31-03-2021.pdf10 Sep 2021
Certificates of CA (Form 3)File: Form - 3 CA Certificate RERA 20-06-2019.pdf10 Sep 2021
Certificates of CA (Form 3)File: Form - 3 CA Certificate RERA 15-01-2020.pdf10 Sep 2021
Certificates of CA (Form 3)File: Form - 3 CA Certificate RERA 31-03-2020.pdf10 Sep 2021
Certificates of CA (Form 3)File: Form - 3 CA Certificate RERA 31-03-2021.pdf10 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: RERA Form 2A 01-03-2020_compressed (1).pdf5 Mar 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate (P- I) 15-01-20_compressed.pdf17 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate 15-01-20_compressed.pdf17 Jan 2020

How this compares with Pune

40%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 57 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Green Fantasy Phase-I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Uruli Kanchan13,700+ in Pune

2 kmGreen Fantasy Phase-ICompleted 4Lapsed / revoked 4Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 12 registered projects within 2 km.

Builder: Shree Mangalmurti Associates Phase-I

Shree Mangalmurti Associates Phase-I has 2 registrations on MahaRERA, including Green Fantasy Phase-I and Green Fantasy Phase-III. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Green Fantasy Phase-I is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Green Fantasy Phase-I?

The registered promoter entity is Shree Mangalmurti Associates Phase-I, a partnership as per the filing. Its GSTIN 27ACQFS9759J1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Green Fantasy Phase-I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Green Fantasy Phase-I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Green Fantasy Phase-I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Green Fantasy Phase-I?

The professionals named in the filing: Architect: Atit ADMULWAR; Engineer: vaibhav mane; Chartered Accountant: Yogesh D Mali; Chartered Accountant: RITESH SHAH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Green Fantasy Phase-I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Green Fantasy Phase-I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Green Fantasy Phase-I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.