Home / Browse projects / Pune, Maharashtra / Green Fantasy Phase-I
Green Fantasy Phase-I
By Shree Mangalmurti Associates Phase-I
RG-MH-48213 · RERA P52100016541 · Last updated on MahaRERA portal: 22 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 2 complaints at MahaRERA
- Completion date moved by 57 months
- 3 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Green Fantasy Phase-I is a Others project by Shree Mangalmurti Associates Phase-I in Pune, Maharashtra, registered with MahaRERA as P52100016541 on 23 May 2018. Possession is promised by 31 Dec 2027. The completion date has moved by 57 months from the original filing. 110 of the 278 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete. 2 complaints are on record with the regulator.
At a glance
Project
- NameGreen Fantasy Phase-I
- TypeOthers
- Location
- Pune Solapur Road
- Uruli Kanchan
- Haveli
- Pune
- 412202
- Pincode412202
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100016541
- ReraGenie IDRG-MH-48213
Builder
- NameShree Mangalmurti Associates Phase-I
- Entity typePartnership
- GSTIN27ACQFS9759J1ZZ
- PartnersATIT SHRIKANT ADMULWAR, KIRAN VASANT PAWAR, ATUL SITARAM HARPALE, GAJANAN SAHEBRAO HARPALE, PRAVIN RAVINDRA KOKATE, RAHUL DATTATRAY KUNJIR, YOGESH NAMDEV CHOUDHARI, AVINASH ASHOK KUNJIR, ABA BALASAHEB CHAUDHARI, RAMCHANDRA KRISHNARAO RANDHAVE, DILIP SHIVAJI UNDRE, DEVIDAS DNYANOBA KADAM
- Other registrations1 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on23 May 2018
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 30 Mar 2023)
- Buildings2 building records
- Documents filed110 files
Current status
Figures as on 22 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing A | NA | 10 | 10 | 139 | 20 | 159 |
| Wing C | NA | 10 | 10 | 119 | 0 | 119 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 22 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 70%.
Wing A75%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 70% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 60% |
Wing C46%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 20% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 20% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 20% |
Progress on shared amenities15
As on 22 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 80% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed73
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| Wing A | 30 | 30 |
| Wing C | 43 | 43 |
Land and ownership18
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Anita Ratikant Yadav & other's | Uruli Kanchan | Pune |
| Balasaheb Gopalrao Kanchan & Other | Uruli Kanchan | Pune |
| Dattatray Bhagwan Darekar & Others | Uruli Kanchan | Pune |
| Dhanaji Gopalrao Kanchan | Uruli Kanchan | Pune |
| Govind Rambhau Tapkir | Uruli Kanchan | Pune |
| Kailas Gopal Kanchan | Uruli Kanchan | Pune |
| Laxman Vitthal Kanchan | Uruli Kanchan | Pune |
| Pandurang Vitthal Kanchan | Uruli Kanchan | Pune |
| Ramdas Vitthal Kanchan | Uruli Kanchan | Pune |
| Vilas Gopalrao Kanchan | Uruli Kanchan | Pune |
| Vilas Karbhari Kanchan | Uruli Kanchan | Pune |
| Madhu Kale | Uruli Kanchan | Pune |
| Bapuso Mukunda Kanchan | Uruli Kanchan | Pune |
| Balasaheb Darekar | Uruli Kanchan | Pune |
| Narayan Darekar | Uruli Kanchan | Pune |
| Sujata Khedkar | Uruli Kanchan | Pune |
| Sanjay Khedekar | Uruli Kanchan | Pune |
| Tulsabai Khedekar | Uruli Kanchan | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing A | NA | Rs 21.48 cr | Rs 21.48 cr |
| Wing C | NA | Rs 21.48 cr | Rs 21.48 cr |
| - | NA | Rs 3.30 cr | Rs 3.30 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Atit ADMULWAR |
| Engineer | vaibhav mane |
| Chartered Accountant | Yogesh D Mali |
| Chartered Accountant | RITESH SHAH |
| Partner | Role in project |
|---|---|
| Shree Mangalmurti Associates Phase-I | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to labour and material cost increase, booking issue, Corona Pandemic DP Reservation Issue
Reason as filed by the promoterReason for delay is due to material cost increases, booking issue & PMRDA DP Reservation issue.
Reason as filed by the promoterIn this project, the work could not be completed after 2020 due to financial constraints, resulting in the site remaining closed for a considerable period. The work has now been resumed, and we are taking all necessary steps to complete the project and obtain the Completion Certificate. The delay in the project has been primarily caused by material shortages, labor shortages, and insufficient funding.
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000177873 | Deepak Anil Verma | Jeevan Atkire | 29/11/2022 |
| CC005000000471522 | Deepak Anil Verma | Jeevan Atkire | 11/08/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 May 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 May 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 May 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 May 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed110
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 110 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Architects Certificate RERA 31-12-2025 NEW (1).pdf | 22 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Architects Certificate RERA 31-03-2026 NEW.pdf | 22 Apr 2026 |
| Withdrawal Update Form 2File: Form -2 Engineer Certificate RERA (P-I) 31-12-2025 NEW (05-01-2026) NEW.pdf | 22 Apr 2026 |
| Withdrawal Update Form 2File: Form -2 Engineer Certificate RERA (P-I) 31-03-2026 NEW (14-04-2026) NEW.pdf | 22 Apr 2026 |
| Withdrawal Update Form 3File: form 3.pdf | 22 Apr 2026 |
| Withdrawal Update Form 3File: form 3.pdf | 22 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Architects Certificate RERA 31-12-2025 NEW (1).pdf | 7 Mar 2026 |
| Withdrawal Update Form 2File: Form -2 Engineer Certificate RERA (P-I) 31-12-2025 NEW (05-01-2026) NEW.pdf | 7 Mar 2026 |
| Withdrawal Update Form 3File: form 3 (11).pdf | 7 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 Architects Certificate RERA 31-03-2024 NEW.pdf | 5 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate 310324.pdf | 5 Mar 2026 |
| Withdrawal Update Form 3File: MANGAL MURTI CA.pdf | 5 Mar 2026 |
| Form 1File: form 1 green fansty.pdf | 1 Dec 2025 |
| Form 2File: form 2 green fansty.pdf | 1 Dec 2025 |
| Form 3File: Form-3 CA grren fansty.pdf | 1 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold inventry.pdf | 1 Dec 2025 |
| Form 1File: form 1.pdf | 22 Jul 2025 |
| Form 2File: Form -2 Engineer Certificate RERA (P-I) 31-03-2025 NEW (16-07-2025).pdf | 22 Jul 2025 |
| Form 3File: ca.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold.pdf | 22 Jul 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate 310324.pdf | 30 May 2024 |
| Certificates of CA (Form 3)File: Form3 CA Certificate PH I 310324.pdf | 30 May 2024 |
| Certificates of CA (Form 3)File: Form-3 CA Certificate PH I.pdf | 23 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 31-03-2024 NEW.pdf | 9 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate RERA 31-03-2024 NEW.pdf | 11 Apr 2024 |
| Declaration in FORM BFile: Form B Developers (P-I) 10-04-2024.pdf | 10 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 31-03-2024 NEW.pdf | 10 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE FOR SOLD BOOKED UNITS (P- I) 31-03-2024.pdf | 10 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate RERA 31-12-2023 NEW.pdf | 24 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE FOR SOLD BOOKED UNITS (P- I) 31-12-2023.pdf | 24 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form -2 Engineer Certificate RERA (P-I) 31-12-2023 NEW.pdf | 19 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 31-12-2023 NEW.pdf | 19 Feb 2024 |
| Certificates of CA (Form 3)File: Form-3 CA Certificate.pdf | 19 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 30-06-2023 NEW.pdf | 29 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 30-09-2023 NEW.pdf | 29 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A (Disclosure of Interest in Other Real Estate Organizations).pdf | 22 Nov 2023 |
| CERSAI detailsFile: Cersai Charge Release Certificat VSBL.pdf | 20 Nov 2023 |
| Certificates of CA (Form 3)File: P-I.pdf | 20 Nov 2023 |
| Certificates of CA (Form 3)File: Form 3 CA Certificate RERA 30-09-2023_compressed.pdf | 11 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate RERA 31-03-2023 NEW.pdf | 30 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5 CA Certificate PH I (2022-2023).pdf | 25 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE FOR SOLD BOOKED UNITS (P- I) 15-10-2023.pdf | 14 Oct 2023 |
| Certificates of CA (Form 3)File: Form-3 CA.pdf | 14 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form -2 Engineer Certificate RERA (P-I) 31-03-2023 NEW.pdf | 13 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 30-06-2022 NEW.pdf | 13 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 30-09-2022 NEW.pdf | 13 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 31-12-2022 NEW.pdf | 13 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 31-03-2023 NEW.pdf | 13 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate RERA 10-01-2023 NEW.pdf | 24 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form -2 Engineer Certificate RERA (P-I) 31-12-2022 15-01-2023 NEW.pdf | 24 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE FOR SOLD BOOKED UNITS (P- I) 31-12-2022.pdf | 24 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: SMA Form 5 PH -I 2018-19 (1).pdf | 18 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form -2 Engineer Certificate RERA (P-I) 31-03-2021 NEW (Revised) (2).pdf | 23 Jan 2023 |
| Certificates of CA (Form 3)File: ca3.pdf | 23 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form-5 CA Certificate PH I (2019-2020).pdf | 23 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form-5 CA Certificate PH I (2020-2021).pdf | 23 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form-5 CA Certificate PH I (2021-2022).pdf | 23 Jan 2023 |
| Other - FinanceFile: VSBL Bank SMMA Loan Saction Lettar.pdf | 12 Sep 2022 |
| Other - FinanceFile: VSBL Restruction Bank SMMA Loan Saction Lettar.pdf | 12 Sep 2022 |
| Declaration about Commencement CertificateFile: Declaration about Commencement Certificate (P- I) 01-09-2021.pdf | 10 Sep 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate (P- I) 01-09-2021.pdf | 10 Sep 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 31-04-2021.pdf | 10 Sep 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form -2 Engineer Form For RERA (P-I) 01-09-2021.pdf | 10 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 31-07-2020.pdf | 10 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 31-10-2020.pdf | 10 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 31-07-2020.pdf | 10 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 31-01-2021.pdf | 10 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 31-04-2021.pdf | 10 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 31-07-2020.pdf | 10 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 31-10-2020.pdf | 10 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 31-01-2021.pdf | 10 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (P- I) 31-04-2021.pdf | 10 Sep 2021 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE FOR SOLD BOOKED UNITS (P- I) 31-03-2021.pdf | 10 Sep 2021 |
| Certificates of CA (Form 3)File: Form - 3 CA Certificate RERA 20-06-2019.pdf | 10 Sep 2021 |
| Certificates of CA (Form 3)File: Form - 3 CA Certificate RERA 15-01-2020.pdf | 10 Sep 2021 |
| Certificates of CA (Form 3)File: Form - 3 CA Certificate RERA 31-03-2020.pdf | 10 Sep 2021 |
| Certificates of CA (Form 3)File: Form - 3 CA Certificate RERA 31-03-2021.pdf | 10 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: RERA Form 2A 01-03-2020_compressed (1).pdf | 5 Mar 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate (P- I) 15-01-20_compressed.pdf | 17 Jan 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate 15-01-20_compressed.pdf | 17 Jan 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 110 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Green Fantasy Phase-I on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Uruli Kanchan13,700+ in Pune
Filed coordinates, straight-line distance. 12 registered projects within 2 km.
24 KOREGAON GREENS
OBEROI INFRA CONSULTANT LLP
Chintamani Paradise
01/04/2017
Emerald City
Suresh kanchan & other 5
KANCHAN CITY
MR. SANJAY ABASAHEB KANCHAN AND OTHER - 1
GOKUL VILLA
GOKUL VILLA
Krishnakunj Phase 2
Heera Devlopers
Builder: Shree Mangalmurti Associates Phase-I
Shree Mangalmurti Associates Phase-I has 2 registrations on MahaRERA, including Green Fantasy Phase-I and Green Fantasy Phase-III. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Green Fantasy Phase-I is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Green Fantasy Phase-I?
The registered promoter entity is Shree Mangalmurti Associates Phase-I, a partnership as per the filing. Its GSTIN 27ACQFS9759J1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Green Fantasy Phase-I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Green Fantasy Phase-I?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Green Fantasy Phase-I?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Green Fantasy Phase-I?
The professionals named in the filing: Architect: Atit ADMULWAR; Engineer: vaibhav mane; Chartered Accountant: Yogesh D Mali; Chartered Accountant: RITESH SHAH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Green Fantasy Phase-I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback