Red flags
- Litigation declared, 3 cases
Clear
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 11 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Arkade Vistas is a Residential / Group Housing project by Arkade Developers Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800077278 on 2 Aug 2024. Possession is promised by 31 Dec 2027. 58 of the 124 units on this registration are recorded sold or booked, and 7 of 22 construction stages are filed complete.
At a glance
Project
- NameArkade Vistas
- TypeResidential / Group Housing
- Location
- Pahadi School Road No. 2
- Off. Aarey Road
- Shreyas Colony
- Goregaon (East)
- Pahadi-Goregaon
- Borivali
- Mumbai Suburban
- 400063
- Pincode400063
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800077278
- ReraGenie IDRG-MH-18578
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on2 Aug 2024
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings2 building records
- Documents filed84 files
Current status
Figures as on 20 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing A | NA | 22 | 22 | 62 | 0 | 62 |
| Wing B | NA | 22 | 22 | 62 | 0 | 62 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 20 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 31%.
Wing A41%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 31% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 1% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 18% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing B32%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 31% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 1% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 18% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 25% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 75% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed160
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Wing A | 80 | 80 |
| Wing B | 80 | 80 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Arunachal Co-Operative Housing Society Limited | Pahadi-Goregaon | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing B | NA | Rs 38.93 cr | Rs 15.35 cr |
| Wing A | NA | Rs 34.13 cr | Rs 14.09 cr |
| - | NA | Rs 8.89 cr | Rs 55.55 lakh |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | A R Design Studio |
| Architect | P R Conultants |
| Engineer | JW Consultants LLP |
| Engineer | Jignesh Mohan Patel |
| Chartered Accountant | Amit T Jain & Co. |
| Chartered Accountant | Santosh Baswaraj Morge |
| Chartered Accountant | Mittal & Associates |
| Partner | Role in project |
|---|---|
| Arkade Developers Limited | - |
Litigation declared3
| Case | Court | Status |
|---|---|---|
| 17853 of 2023 in 695 of 2014/2023 | High Court Bombay | Ongoing |
| 17856 of 2023 in 425 of 2014/2023 | High Court Bombay | Ongoing |
| 1802 of 2015/2015 | High Court Bombay | Ongoing |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Jul 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Jul 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 Jul 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed84
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A arkade vistas mar 26.pdf | 20 May 2026 |
| Withdrawal Update Form 1File: Form 1-Arkade Vistas-Mar 26.pdf | 5 May 2026 |
| Withdrawal Update Form 2File: Form 2 Engineers certificate arkade vistas Mar 26.pdf | 5 May 2026 |
| Withdrawal Update Form 3File: Form 3 Arkade Vistas Mar 26 Final_compressed.pdf | 5 May 2026 |
| Withdrawal Update Form 1File: Form 1 VIstas Dec 25.pdf | 30 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Vistas Dec 25.pdf | 30 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Vistas Dec 25_compressed.pdf | 30 Jan 2026 |
| Form 5 (FY 2024-2025)File: Form 5 Arkade Vistas 24-25.pdf | 17 Dec 2025 |
| Withdrawal Update Form 1File: Form 1 vistas Sep 25.pdf | 29 Oct 2025 |
| Withdrawal Update Form 2File: Arkade Vistas Sept 2025 (Form 2).pdf | 29 Oct 2025 |
| Withdrawal Update Form 3File: Arkade Vistas Sep 25.pdf | 29 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 Arkade Vistas Jun 25.pdf | 6 Aug 2025 |
| Withdrawal Update Form 2File: Form 2 Vistas 1 Jun 25 - Old.pdf | 6 Aug 2025 |
| Withdrawal Update Form 3File: Arkade Vistas - Final.pdf | 6 Aug 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Arkade Vistas Form 3 Mar 25_compressed.pdf | 21 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Arkade Vistas Mar 25.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Vistas March 2025.pdf | 14 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold and unsold Vistas Mar 25.pdf | 11 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form_2A_Vistas Mar 25.pdf | 11 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Arkade Vistas Dec 24.pdf | 12 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Vistas Dec 24.pdf | 29 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vistas Dec 24_compressed.pdf | 29 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Vistas Inventory Declaration dec 24.pdf | 14 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Vistas Sep 24.pdf | 7 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Arkade Vistas form 3 [September 2024]_compressed.pdf | 22 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Vistas Sep 24.pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Vistas Sep 24.pdf | 14 Oct 2024 |
| Other - FinanceFile: Format B arkade Vistas.pdf | 30 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Vistas_R_compressed (1).pdf | 29 Jul 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured and unsecured finance-vistas_r.pdf | 25 Jul 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A-Vistas_R.pdf | 25 Jul 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B-Vistas_r.pdf | 25 Jul 2024 |
| Declaration about Commencement CertificateFile: Declaration for Commencement Certificate (Format D).pdf | 18 Jul 2024 |
| Proforma of Agreement for saleFile: Proforma of Agreement for sale.pdf | 18 Jul 2024 |
| Layout approvalFile: 2428032Amendletter signed vistas.pdf | 4 Jul 2024 |
| Building plan approvalFile: Drawing vistas1.pdf | 4 Jul 2024 |
| Building plan approvalFile: Drawing vistas2.pdf | 4 Jul 2024 |
| Building plan approvalFile: Drawing vistas3.pdf | 4 Jul 2024 |
| Building plan approvalFile: Drawing vistas4.pdf | 4 Jul 2024 |
| Building plan approvalFile: Drawing vistas5.pdf | 4 Jul 2024 |
| Building plan approvalFile: Drawing vistas6.pdf | 4 Jul 2024 |
| Building plan approvalFile: Drawing vistas7.pdf | 4 Jul 2024 |
| Building plan approvalFile: Drawing vistas8.pdf | 4 Jul 2024 |
| Building plan approvalFile: Drawing vistas9.pdf | 4 Jul 2024 |
| Building plan approvalFile: Drawing vistas10.pdf | 4 Jul 2024 |
| Building plan approvalFile: Drawing vistas11.pdf | 4 Jul 2024 |
| Building plan approvalFile: Drawing vistas12.pdf | 4 Jul 2024 |
| Building plan approvalFile: Drawing vistas13.pdf | 4 Jul 2024 |
| PAN CardFile: ADL Pan Card.pdf | 4 Jul 2024 |
| Copy of the legal title reportFile: Arkade Vistas And Views RERA Title Report_11zon.pdf | 4 Jul 2024 |
| Details of encumbrances concerned to FinanceFile: Vistas financial encumbrance declaration.pdf | 4 Jul 2024 |
| Details of encumbrances concerned to FinanceFile: Vistas legal encumbrances declaration.pdf | 4 Jul 2024 |
| Details of encumbrances concerned to LegalFile: Vistas financial encumbrance declaration.pdf | 4 Jul 2024 |
| Details of encumbrances concerned to LegalFile: Vistas legal encumbrances declaration.pdf | 4 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: 2428032Amendletter signed vistas.pdf | 4 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Drawing vistas1.pdf | 4 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Drawing vistas2.pdf | 4 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Drawing vistas3.pdf | 4 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Drawing vistas4.pdf | 4 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Drawing vistas5.pdf | 4 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Drawing vistas6.pdf | 4 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Drawing vistas7.pdf | 4 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Drawing vistas8.pdf | 4 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Drawing vistas9.pdf | 4 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Drawing vistas10.pdf | 4 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Drawing vistas11.pdf | 4 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Drawing vistas12.pdf | 4 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Drawing vistas13.pdf | 4 Jul 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 19499 _FirstCC_signed-Vista CC.pdf | 4 Jul 2024 |
| Declaration in FORM BFile: Form B vistas Promoter.pdf | 4 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate ARD Arkade Vistas.pdf | 4 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Arkade Vistas Form 2.pdf | 4 Jul 2024 |
| CERSAI detailsFile: Cersai Declaration-Arkade Vistas signed.pdf | 4 Jul 2024 |
| CERSAI detailsFile: CERSAI_Vistas_Search_Report_200312257622_For_Asset_Based_Search_02_07_2024_12_40_10_328_Vi | 4 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest -Arpit Jain.pdf | 4 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of intererst -Amit jain.pdf | 4 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 240503 Hiren Tanna.pdf | 4 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other Real Estate Org_Abhishek Dev.pdf | 4 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Ketu Jain.pdf | 4 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Neha Huddar Disclosure.pdf | 4 Jul 2024 |
Promoter's earlier projects11
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| ARKADE CROWNP51800045342 | Eksar, Mumbai Suburban | - | May 2022 | Completed | Dec 2025 | Jun 2024 |
| Arkade SereneP51800029961 | Sunder Nagar Malad West, Mumbai Suburban | - | Jul 2021 | Completed | Jun 2024 | Feb 2023 |
| ARKADE EARTH-CARNATIONP51800014422 | Kanjurmarg East, Mumbai Suburban | - | Nov 2017 | Completed | Dec 2023 | Apr 2021 |
| ARKADE EARTH-ASPENP51800006579 | Kanjurmarg East, Mumbai Suburban | - | Aug 2017 | Completed | Dec 2023 | Apr 2021 |
| ARKADE EARTH- BLUEBELLP51800011586 | Kanjurmarg East, Mumbai Suburban | - | Aug 2017 | Completed | Dec 2023 | Apr 2021 |
| ARKADE EARTH - FERNP51800004750 | Kanjurmarg East, Mumbai Suburban | - | Aug 2017 | Completed | Dec 2023 | Feb 2020 |
| Darshan | Darshan Vile Parle East Mumbai 57 | 10 | - | Completed | Jun 2023 | Nov 2022 |
| ARKADE EARTH-DAFFODILP51800004440 | Kanjurmarg East, Mumbai Suburban | - | Aug 2017 | Completed | Dec 2022 | Feb 2020 |
| ARKADE EARTH - HAZELP51800022666 | KANJURMARG EAST, Mumbai Suburban | - | Oct 2019 | Completed | Dec 2022 | Apr 2022 |
| ARKADE EARTH - GARDENIAP51800010074 | Kanjurmarg East, Mumbai Suburban | - | Aug 2017 | Completed | Dec 2022 | Feb 2020 |
| ARKADE EARTH - EBONYP51800008953 | Kanjurmarg East, Mumbai Suburban | - | Aug 2017 | Completed | Dec 2022 | Feb 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 8 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 84 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Arkade Vistas on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Goregaon (East)6,700+ in Mumbai Suburban
Elysian Tower C, D, E
Oberoi Realty Limited
Elysian Tower B
Oberoi Realty Limited
Elysian Tower A
Oberoi Realty Limited
Sheetal Sangam
DGS Township Pvt Ltd
SEJAL SQUARE
ALCHEMI DEVELOPERS PRIVATE LIMITED
Mehta Marquina 1978
Shreeram Builders
See every Mumbai Suburban project, with the district possession charts
Builder: Arkade Developers Limited
ARKADE DEVELOPERS LIMITED has 9 registrations on MahaRERA, including ARKADE PEARL 1 and Arkade Eden. Its filings disclose 19 earlier MahaRERA projects: declares 19 of 19 past projects completed on time. Litigation is declared on 7 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Arkade Vistas is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Arkade Vistas?
The registered promoter entity is Arkade Developers Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Arkade Vistas?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Arkade Vistas?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Arkade Vistas?
The professionals named in the filing: Architect: A R Design Studio; Architect: P R Conultants; Engineer: JW Consultants LLP; Engineer: Jignesh Mohan Patel; Chartered Accountant: Amit T Jain & Co.; Chartered Accountant: Santosh Baswaraj Morge. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Arkade Vistas?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback