Home / Browse projects / Mumbai Suburban, Maharashtra / Aristocrate

Registered No litigation declared Commercial project

Aristocrate

By Amit Sudhir Dhadda

RG-MH-19860 · RERA P51800006105 · Last updated on MahaRERA portal: 23 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 69 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 69 months from the original
2 of 11Construction stages donefurthest along: Podiums (if any), 60%
107 of 113Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 112 documents Report an error

Aristocrate is a Commercial project by Amit Sudhir Dhadda in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800006105 on 14 Aug 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 69 months from the original filing. 6 of the 113 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameAristocrate
  • TypeCommercial
  • Location
    • Mogra Road
    • Andheri
    • Mumbai Suburban
    • 400069
  • Pincode400069
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800006105
  • ReraGenie IDRG-MH-19860

Builder

  • NameAmit Sudhir Dhadda
  • Entity typeIndividual
  • Named personAmit S Dhadda

Key dates

this monthRegisteredAug 2017First promiseMar 2022Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Aug 2017
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Mar 2022)
  • Buildings1 building record
  • Documents filed112 files

Current status

5%6 of 113 units booked
19.6%Work done, per cost certificate

Figures as on 23 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AristocrateNA15140113113

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 60%.

Aristocrate: 40% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)60%
Plinth100%
Stilt Floor0%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks35%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Progress on shared amenities15

As on 23 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes30%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsYes30%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes80%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes45%
Aggregate area of recreational Open SpaceYes70%
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,901 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
Declared on19 Feb 2026
LandownerVillageDistrict
Tsquare Urbanetek Projects LLPBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMunicipal Corporation of Greater Mumbai
Permissible FSI6583.28
Proposed, not sanctioned6,583 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSai Commercial Opp Moksh Mall S V Road Borivali West Mumbai 400092
Estimated costRs 82.58 cr
Cost incurredRs 16.19 cr
Work done19.61%
BuildingWingEstimatedIncurred
AristocrateNARs 60.83 crRs 9.45 cr
-NARs 21.75 crRs 6.74 cr

Certifying professionals and partners11

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr Bhaskar Misra
ArchitectT-SQUARE ARCHITECTS AND DESIGN
ArchitectJignaesh Manilal Panchal
EngineerAbhishek Dhuri
EngineerVijay Prakash Shukla
Chartered AccountantG R. MODI AND CO
Chartered AccountantPratik Parab
Chartered AccountantNehali & Co
Chartered AccountantRSPH & Associates
Chartered AccountantP N Sabadra and Associates
Chartered AccountantCA Pratik D Jain
PartnerRole in project
Amit Sudhir Dhadda-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800019674Mar 2022 → Dec 2027

Reason as filed by the promoterWe. M/s. Aristocrat Enterprise the developers of Aristocrate located at CTS no 971 to 5 Village Mogra Andheri (E), Mumbai 40006 bearing MahaRERA Registration No P51800006105. We are writing this letter to request an extension of time for the completion of our project until 31/12/2027 duc to unforeseen regulatory and external challenges The project was originally scheduled to be complete by 30/03/2022 However duc to untorescen circumstance and regulatory changes, we were unable to compete the project within stipulated toneframe The key factors contributing to delay are as follows 1 Regulatory C

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed112

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 112 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1.pdf23 Apr 2026
Form 2File: Form 2.pdf23 Apr 2026
Form 3File: Form 3.pdf23 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf23 Apr 2026
Form 1File: Form 1.pdf22 Apr 2026
Form 2File: Form 2.pdf22 Apr 2026
Form 3File: Form 3.pdf22 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf22 Apr 2026
Form 1File: Form1_March25.pdf21 Mar 2026
Form 2File: Form2_24_04_25.pdf21 Mar 2026
Form 3File: Form3_March25.pdf21 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf21 Mar 2026
Withdrawal Update Form 1File: Form1_Dec25.pdf21 Mar 2026
Withdrawal Update Form 2File: Form2_29_01_26.pdf21 Mar 2026
Withdrawal Update Form 3File: Form3_Dec25.pdf21 Mar 2026
Form 2A (FY 2024-2025)File: Form 2A_ Vijay Shukla_30_03_2025.pdf17 Mar 2026
Withdrawal Update Form 1File: Form1_March25.pdf9 Mar 2026
Withdrawal Update Form 1File: Form1_June2025.pdf9 Mar 2026
Withdrawal Update Form 1File: Form1_Sept25.pdf9 Mar 2026
Withdrawal Update Form 1File: Form1_Dec25.pdf9 Mar 2026
Withdrawal Update Form 2File: Form2_24_04_25.pdf9 Mar 2026
Withdrawal Update Form 2File: Form2_26_07_25.pdf9 Mar 2026
Withdrawal Update Form 2File: Form2_27_10_25.pdf9 Mar 2026
Withdrawal Update Form 2File: Form2_29_01_26.pdf9 Mar 2026
Withdrawal Update Form 3File: Form3_March25.pdf9 Mar 2026
Withdrawal Update Form 3File: Form3_June25.pdf9 Mar 2026
Withdrawal Update Form 3File: Form3_Sept25.pdf9 Mar 2026
Withdrawal Update Form 3File: Form3_Dec25.pdf9 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf7 Mar 2026
Withdrawal Update Form 2File: FORM 2.pdf7 Mar 2026
Withdrawal Update Form 3File: Maha rera Ca certificate.pdf7 Mar 2026
Layout approvalFile: PLANS.pdf5 Mar 2025
Building plan approvalFile: IOD.pdf5 Mar 2025
Copy of Layout Approval (in case of layout)File: PLANS.pdf5 Mar 2025
Declaration in FORM BFile: Form B (11).pdf5 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf5 Mar 2025
Building Plan Approval (IOD)File: IOD.pdf5 Mar 2025
Disclosure of sold/ booked inventoryFile: inventory disclosure (1) (1) (1).pdf5 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificat (1).pdf3 Mar 2025
Declaration in FORM BFile: Form B.pdf1 Mar 2025
Certificates of CA (Form 3)File: CA - Certificate final.pdf26 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng certificate (1).pdf25 Feb 2025
Declaration about Commencement CertificateFile: Declaration about CC (Format D).pdf25 Feb 2025
Disclosure of sold/ booked inventoryFile: Inventory Disclosure.pdf31 Jan 2025
Certificates of CA (Form 3)File: CA form.pdf2 Jan 2025
Layout approvalFile: Plans 1-2.pdf8 Oct 2024
Layout approvalFile: Plans 3-4.pdf8 Oct 2024
Layout approvalFile: Plans 5-6.pdf8 Oct 2024
Layout approvalFile: Plans 1-2.pdf8 Oct 2024
Layout approvalFile: Plans 3-4.pdf8 Oct 2024
Layout approvalFile: Plans 5-6.pdf8 Oct 2024
Copy of Layout Approval (in case of layout)File: Plans 1-2.pdf8 Oct 2024
Copy of Layout Approval (in case of layout)File: Plans 3-4.pdf8 Oct 2024
Copy of Layout Approval (in case of layout)File: Plans 5-6.pdf8 Oct 2024
Declaration in FORM BFile: Form B.pdf8 Oct 2024
Copy of Layout Approval (in case of layout)File: Plans 1-2.pdf8 Oct 2024
Copy of Layout Approval (in case of layout)File: Plans 3-4.pdf8 Oct 2024
Copy of Layout Approval (in case of layout)File: Plans 5-6.pdf8 Oct 2024
Declaration in FORM BFile: Form B.pdf8 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf8 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf7 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf7 Aug 2024
Declaration in FORM BFile: FORM B.pdf24 May 2024
CERSAI detailsFile: cersai doc.pdf20 May 2024
Details of encumbrances concerned to FinanceFile: file pdf.pdf19 May 2024
Details of encumbrances concerned to LegalFile: file pdf.pdf19 May 2024
Declaration about Commencement CertificateFile: FORMAT D.pdf19 May 2024
Declaration about Commencement CertificateFile: FORMAT D (2).pdf19 May 2024
Declaration about Commencement CertificateFile: FORMAT D (2).pdf19 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22) .pdf19 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22) .pdf19 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 1) Engineers Certificate on Quality Assurance (Form 2A FY 2020-21).pdf19 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 1) Engineers Certificate on Quality Assurance (Form 2A FY 2020-21).pdf19 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEX A.pdf19 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22).pdf19 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22).pdf19 May 2024
Proforma of Agreement for saleFile: SALE AGREEMENT FOR RERA .pdf19 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK FORMAT A.pdf19 May 2024
Deviation Report with respect to Allotment letterFile: 1 Proforma of Allotment letter.pdf19 May 2024
Deviation Report with respect to model copy of AgreementFile: SALE AGREEMENT FOR RERA Change.pdf19 May 2024

How this compares with Mumbai Suburban

5%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 69 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Aristocrate on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Andheri6,700+ in Mumbai Suburban

2 kmAristocrateCompleted 115Lapsed / revoked 74Abeyance 1Other 136Dot size: filed unitsN

Filed coordinates, straight-line distance. 326 registered projects within 2 km.

Builder: Amit Sudhir Dhadda

Amit Sudhir Dhadda has 1 registration on MahaRERA, including Aristocrate. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Aristocrate is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Aristocrate?

The registered promoter entity is Amit Sudhir Dhadda, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Aristocrate?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Aristocrate?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Aristocrate?

The professionals named in the filing: Architect: Mr Bhaskar Misra; Architect: T-SQUARE ARCHITECTS AND DESIGN; Architect: Jignaesh Manilal Panchal; Engineer: Abhishek Dhuri; Engineer: Vijay Prakash Shukla; Chartered Accountant: G R. MODI AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Aristocrate?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Aristocrate. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Aristocrate to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.