Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ARIHANT SKYSUITES is a Others project by Keys Infra Ventures India LLP in Pune, Maharashtra, registered with MahaRERA as P52100080867 on 25 Jul 2025. Possession is promised by 31 Dec 2030. 29 of the 120 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete.
At a glance
Project
- NameARIHANT SKYSUITES
- TypeOthers
- Location
- GAT NO 169/2
- 169/3
- 169/4 P
- PUNE
- Tathwade
- Mulshi
- 411033
- Pincode411033
- RERA no.P52100080867
- ReraGenie IDRG-MH-88470
Builder
- NameKeys Infra Ventures India LLP
- Entity typePartnership
- PartnersRONAK RAJESH PARMAR, ANITA ANIL NANDOSKAR, MAHAVIR SOHANRAJ SOLANKI, MANISH PRAKASH JAIN, SACHIN NARESH MITTAL, PUNIT MAHIPAL SONIGARA, VIKAS CHAMPATRAJ SHAH
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on25 Jul 2025
- Promised completion31 Dec 2030
- Revised completionNone
- Buildings2 building records
- Documents filed72 files
Current status
Figures as on 20 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A | NA | 6 | 3 | 0 | 36 | 36 |
| WING B | NA | 17 | 14 | 66 | 18 | 84 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.
WING A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed337
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| WING A | 138 | 138 |
| WING B | 199 | 199 |
Land and ownership22
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| MOHINI MOHANRAO JADHAV | Kolhapur (M Corp.) | Kolhapur |
| NARAYAN BABURAO PAWAR | Tathwade | Pune |
| NEMICHAND MITHULAL AGARWAL | Pimpri Chinchawad (M Corp.) | Pune |
| SANTOSH LAXMAN PAWAR | Tathwade | Pune |
| DHANANJAY LAWMAN PAWAR | Tathwade | Pune |
| RUPESH GOVARDHAN MORE | Pimpri Chinchawad (M Corp.) | Pune |
| VIKAS SAMBHAJI PAWAR | Tathwade | Pune |
| MUKTA SAMBHAJI PAWAR | Tathwade | Pune |
| PARESH PRABHAKAR PAWAR | Tathwade | Pune |
| VATSALA PRABHAKAR PAWAR | Tathwade | Pune |
| DNYANESHWAR PANDURANG PAWAR | Tathwade | Pune |
| SARIKA CHANDRASHEKHAR KAND | Yelwadi | Pune |
| VANITA PRAKASH RAUT | Kiwale | Pune |
| ANITA NILESH SHEDGE | Pune (M Corp.) | Pune |
| JANABAI SIDDHARAM JEURKAR | Tathwade | Pune |
| SUBHASH SIDDHARAM JEURKAR | Thergaon | Pune |
| GURUNATH SIDDHARAM JEURKAR | Tathwade | Pune |
| ANIL SIDDHARAM JEURKAR | Tathwade | Pune |
| MALLESH SIDDHARAM JEURKAR | Tathwade | Pune |
| SANTOSH SIDDHARAM JEURKAR | Tathwade | Pune |
| NANDA AMRUT ZHALKE | Solapur (M Corp.) | Solapur |
| SHITARAM TULASHIRAM SAWANT | Dhamane | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| WING A | NA | Rs 15.75 cr | Rs 85.18 lakh |
| WING B | NA | Rs 15.75 cr | Rs 85.18 lakh |
| - | NA | Rs 3.50 cr | Rs 18.93 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | CUBIX ARCHITECTS ASSOCIATES |
| Engineer | HARSHAL PRAMOD WANI |
| Chartered Accountant | P M R D & Associates LLP |
| Chartered Accountant | Diksha Garg and Associates |
| Partner | Role in project |
|---|---|
| Keys Infra Ventures India LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 May 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 May 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 May 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 May 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2030
Documents filed72
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Keys infra ventures india LLP Form 1.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Keys infra ventures india LLP form 2.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Form 3Keys infra-signed Mar 26.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Keys Infra Ventures India LLP.pdf | 27 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 Keys Infra Dec 25.pdf | 27 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Sep 25 Keys Infra signed.pdf | 27 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Dec 25 Keys Infra signed.pdf | 27 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Sep 25 Keys Infra signed_compressed.pdf | 27 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Dec 25 Keys Infra signed_compressed.pdf | 27 Jan 2026 |
| Other - TechnicalFile: IOD.pdf | 17 Jul 2025 |
| Other - TechnicalFile: Order 50 Declaration new.pdf | 27 Jun 2025 |
| Other - TechnicalFile: No Objection Certificate.pdf | 26 Jun 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Bank Letter Format A.pdf | 16 Jun 2025 |
| Other - FinanceFile: Upload.pdf | 13 Jun 2025 |
| Other - TechnicalFile: Upload.pdf | 13 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 03_11zon.pdf | 12 Jun 2025 |
| Other - TechnicalFile: Annexure 'A' Declaration Cum Undertaking.pdf | 9 Jun 2025 |
| Proforma of Agreement for saleFile: AGREEMENT TO SALE of Flat as per RERA.pdf | 9 Jun 2025 |
| Layout approvalFile: Layout.pdf | 4 May 2025 |
| Building plan approvalFile: Plan 2.pdf | 4 May 2025 |
| Building plan approvalFile: Plan 3.pdf | 4 May 2025 |
| Building plan approvalFile: Plan 4.pdf | 4 May 2025 |
| Building plan approvalFile: Plan 5.pdf | 4 May 2025 |
| Building plan approvalFile: Plan 6.pdf | 4 May 2025 |
| Building plan approvalFile: Plan 7.pdf | 4 May 2025 |
| Building plan approvalFile: Plan 8.pdf | 4 May 2025 |
| Building plan approvalFile: Plan 9.pdf | 4 May 2025 |
| Copy of the legal title reportFile: Search Report -1.pdf | 4 May 2025 |
| Copy of the legal title reportFile: Search Report -3.pdf | 4 May 2025 |
| Copy of the legal title reportFile: Search Report -2.pdf | 4 May 2025 |
| Details of encumbrances concerned to FinanceFile: No Financial and Legal Encumbrances.pdf | 4 May 2025 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 4 May 2025 |
| Proforma of Allotment letterFile: Annexure 1 Model Form Of Allotment Letter.pdf | 4 May 2025 |
| Declaration in FORM BFile: Form B PROMOTER.pdf | 4 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf | 4 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 4 May 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 4 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 5.pdf | 4 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 9.pdf | 4 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 8.pdf | 4 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 7.pdf | 4 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 6.pdf | 4 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 4.pdf | 4 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 3.pdf | 4 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf | 4 May 2025 |
| Other - LegalFile: Tathwade_169_2_Satbara.pdf | 4 May 2025 |
| Other - LegalFile: Tathwade_169_3_Satbara.pdf | 4 May 2025 |
| Other - LegalFile: tathwade_169_4_Satbara.pdf | 4 May 2025 |
| Other - LegalFile: No Objection Certificate.pdf | 4 May 2025 |
| Other - LegalFile: Declaration of Construction on Land Owned by Landowner.pdf | 4 May 2025 |
| Declaration about Commencement CertificateFile: Circular 32.pdf | 4 May 2025 |
| CERSAI detailsFile: Cersai Report.pdf | 4 May 2025 |
| CERSAI detailsFile: Undertaking For Cersai Report.pdf | 4 May 2025 |
| Deviation Report with respect to Allotment letterFile: No Deviation With respect to Allotment Letter.pdf | 4 May 2025 |
| Details of encumbrances concerned to LegalFile: No Financial and Legal Encumbrances.pdf | 4 May 2025 |
| Other - FinanceFile: No Objection Certificate.pdf | 4 May 2025 |
| Other - FinanceFile: Declaration for not opening Bank Account.pdf | 4 May 2025 |
| Other - TechnicalFile: Declaration for not opening Bank Account.pdf | 4 May 2025 |
| Other - TechnicalFile: Declaration of Construction on Land Owned by Landowner.pdf | 4 May 2025 |
| Other - TechnicalFile: No Objection Certificate.pdf | 4 May 2025 |
| Deviation Report with respect to model copy of AgreementFile: No Deviation with respect to Agreement to Sale.pdf | 4 May 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Bharat Solanki.pdf | 4 May 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Manish P Jain.pdf | 4 May 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Sachin N Mittal.pdf | 4 May 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Mahavir S Solanki.pdf | 4 May 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Punit M Sonigara.pdf | 4 May 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Ronak R Parmar.pdf | 4 May 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Anita A Nandoskar.pdf | 4 May 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Vikas C Shah.pdf | 4 May 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B Bank Letter.pdf | 4 May 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured and unsecured finance.pdf | 4 May 2025 |
| PAN CardFile: Key Infra Pan Card.pdf | 21 Feb 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 72 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep ARIHANT SKYSUITES on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PUNE13,700+ in Pune
Construction of 24 LIG, 768 MIG and commercial
Pune Housing & Area Development Board
Kohinoor Avantara
Intofinity Promoters Private Limited
AISHWARYAM INSIGNIA
VIKSAK VINODE INFRATECH LLP
KOHINOOR UPTOWN AVENUE
MOONSTONE REALINFRA PRIVATE LIMITED
LUSH RESIDENCES
LUSH RESIDENCES LLP
RENUKA PANCHATATTVA
Renuka Realty Private Limited
Builder: Keys Infra Ventures India LLP
Keys Infra Ventures India LLP has 1 registration on MahaRERA, including ARIHANT SKYSUITES. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if ARIHANT SKYSUITES is delayed beyond 31 Dec 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ARIHANT SKYSUITES?
The registered promoter entity is Keys Infra Ventures India LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ARIHANT SKYSUITES?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ARIHANT SKYSUITES?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ARIHANT SKYSUITES?
The professionals named in the filing: Architect: CUBIX ARCHITECTS ASSOCIATES; Engineer: HARSHAL PRAMOD WANI; Chartered Accountant: P M R D & Associates LLP; Chartered Accountant: Diksha Garg and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ARIHANT SKYSUITES?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback