Home / Browse projects / Thane, Maharashtra / ARIHANT CITY PHASE-II - E BUILDING
ARIHANT CITY PHASE-II - E BUILDING
By DIMPY INFRA VENTURES PVT LTD
RG-MH-39871 · RERA P51700010350 · Last updated on MahaRERA portal: 7 Aug 2023
Source: official MahaRERA filing
Red flags
- 2 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ARIHANT CITY PHASE-II - E BUILDING is a Residential / Group Housing project by DIMPY INFRA VENTURES PVT LTD in Thane, Maharashtra, registered with MahaRERA as P51700010350 on 24 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2025. 2 complaints are on record with the regulator.
At a glance
Project
- NameARIHANT CITY PHASE-II - E BUILDING
- TypeResidential / Group Housing
- Location
- MAHARASHTRA
- BHIWANDI
- Bhiwandi (M Corp.)
- Thane
- 421302
- Pincode421302
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700010350
- ReraGenie IDRG-MH-39871
Builder
- NameDIMPY INFRA VENTURES PVT LTD
- Entity typeCompany
- Managing DirectorDANSINGH SHERSINGH MAWRI
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on24 Aug 2017
- Promised completion30 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed101 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| E BUILDING | NA | 19 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 7 Aug 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
E BUILDING: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 7 Aug 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 95% |
| Water Supply | Yes | 95% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 95% |
| Storm Water Drains | Yes | 95% |
| Landscaping & Tree Planting | Yes | 80% |
| Street Lighting | Yes | 90% |
| Community Buildings | Yes | 50% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 90% |
| Solid Waste Management And Disposal | Yes | 90% |
| Water conservation /Rain water harvesting | Yes | 95% |
| Energy managemcnt | Yes | 95% |
| Fire protection and fire safety requirements | Yes | 95% |
| Electrical meter room, sub-station, receiving station | Yes | 95% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| ARIHANT ENTERPRISES | Bhiwandi (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AKRUTI CONSULTANT |
| Partner | Role in project |
|---|---|
| DIMPY INFRA VENTURES PVT LTD | - |
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000195680 | Nitin Pujari | Dimpy Infra | 08/11/2021 |
| CC006000000375236 | Nitin Rajendra Londhe | Sanjay Vijay Padel | 02/05/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Jun 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Jun 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 1 Oct 2022
Documents filed101
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of sold/ booked inventoryFile: MahaRera Disclosure June 23 Building -E.pdf | 7 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: MahaRera Discloser E Building March 23 (1).pdf | 24 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: ENGINEER'S CERTIFICATE (E BUILDING)(MARCH 2023) (1).pdf | 12 May 2023 |
| Disclosure of sold/ booked inventoryFile: MahaReRa Discolcure Letter Dec 22 E Building (1).pdf | 21 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Maha Disclosure Sept 22 E- Building.pdf | 30 Jan 2023 |
| Certificates of CA (Form 3)File: SEP-22 CA-CERT - DIMPY.pdf | 13 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: MAR-22 CA-FORM_5 - DIMPY.pdf | 23 Nov 2022 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM-4 BUILDING COMPLETION.pdf | 4 Oct 2022 |
| Certificates of CA (Form 3)File: MAR-22 CA-CERT - DIMPY.pdf | 1 Oct 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC PHASE II EFGHIJ 29092022.pdf | 1 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: JUN-22 ARCH-CERT - DIMPY.pdf | 22 Aug 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: JUN-22 ENGG-CERT - DIMPY.pdf | 22 Aug 2022 |
| Disclosure of sold/ booked inventoryFile: JUN-22 RERA DISCLOSURE - DIMPY.pdf | 22 Aug 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A E Building.pdf | 22 Aug 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MAR-22 ENGG-CERT- DIMPY.pdf | 5 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: DEC-21 RERA DISCLOSURE - DIMPY.pdf | 25 Jun 2022 |
| Disclosure of sold/ booked inventoryFile: MAR-22 RERA DISCLOSURE - DIMPY.pdf | 25 Jun 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MAR-22 ARCH-CERT - DIMPY.pdf | 24 May 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form Engineer Certificate Phase II E Bldg March 2022.pdf | 24 May 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DEC-21 ARCH-CERT - DIMPY.pdf | 7 Mar 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DEC-21 ENGG-CERT - DIMPY.pdf | 7 Mar 2022 |
| Certificates of CA (Form 3)File: DEC-21 CA-CERT - DIMPY.pdf | 7 Mar 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: E SOCIETY RERA.pdf | 31 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SEP-21 ARCH-CERT - DIMPY.pdf | 23 Dec 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SEP-21 ENGG-CERT - DIMPY.pdf | 23 Dec 2021 |
| Disclosure of sold/ booked inventoryFile: SEP-21 RERA DISCLOSURE - DIMPY.pdf | 23 Dec 2021 |
| Certificates of CA (Form 3)File: SEP-21 CA-CERT - DIMPY.pdf | 23 Dec 2021 |
| Declaration about Commencement CertificateFile: FORMAT D DIMPY E BUILDING.pdf | 15 Dec 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: JUN-21 ARCH-CERT - DIMPY.pdf | 8 Oct 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: JUN-21 ENGG-CERT - DIMPY.pdf | 8 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: JUN-21 RERA DISCLOSURE - DIMPY.pdf | 8 Oct 2021 |
| Certificates of CA (Form 3)File: JUN-21 CA-CERT - DIMPY.pdf | 8 Oct 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MAR-21 ARCH-CERT - DIMPY.pdf | 27 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MAR-21 ENGG-CERT - DIMPY.pdf | 27 Aug 2021 |
| Certificates of CA (Form 3)File: MAR-21 CA-CERT - DIMPY.pdf | 27 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: MAR-20 CA-FORM_5 - DIMPY.pdf | 26 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: MAR-21 CA-FORM_5 - DIMPY.pdf | 26 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer Certificate E Building March 2020.pdf | 13 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Certificate E Building March 2021.pdf | 13 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: MAR-21 RERA DISCLOSURE - DIMPY.pdf | 21 May 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DEC-20 CA-CERT - DIMPY.pdf | 15 Apr 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DEC-20 ARCH-CERT - DIMPY.pdf | 15 Apr 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DEC-20 ENGG-CERT - DIMPY.pdf | 15 Apr 2021 |
| Certificates of CA (Form 3)File: DEC-20 CA-CERT - DIMPY.pdf | 15 Apr 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SEP-20 ARCH-CERT - DIMPY.pdf | 24 Mar 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SEP-20 ENGG-CERT - DIMPY.pdf | 24 Mar 2021 |
| Certificates of CA (Form 3)File: SEP-20 CA-CERT - DIMPY.pdf | 24 Mar 2021 |
| Certificates of CA (Form 3)File: MAR-20 CA-CERT - DIMPY.pdf | 18 Nov 2020 |
| Certificates of CA (Form 3)File: JUN-20 CA-CERT - DIMPY.pdf | 18 Nov 2020 |
| Certificates of CA (Form 5)File: MAR-20 CA-FORM_5 - DIMPY.pdf | 18 Nov 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MAR-20 ENGG-CERT - DIMPY.pdf | 27 Jul 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: JUN-20 ENGG-CERT - DIMPY.pdf | 25 Jul 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DEC-19 CA-CERT - DIMPY.pdf | 10 Jul 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MAR-20 ARCH-CERT - DIMPY.pdf | 10 Jul 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: JUN-20 ARCH-CERT - DIMPY.pdf | 10 Jul 2020 |
| Certificates of CA (Form 3)File: DEC-19 CA-CERT - DIMPY.pdf | 10 Jul 2020 |
| Details of Restarting of Construction work post lockdownFile: DIMPY E BUILDING.pdf | 6 Jul 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DEC-19 ENGG-CERT - DIMPY.pdf | 7 Feb 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DEC-19 ARCH-CERT - DIMPY.pdf | 17 Jan 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SEP-19 ARCH-CERT - DIMPY.pdf | 16 Jan 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SEP-19 ENGG-CERT - DIMPY.pdf | 16 Jan 2020 |
| Certificates of CA (Form 3)File: JUN-19 CA-CERT - DIMPY.pdf | 4 Dec 2019 |
| Certificates of CA (Form 3)File: SEP-19 CA-CERT - DIMPY.pdf | 4 Dec 2019 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: MAR-19 CA-FORM_5 - PHASE-II.pdf | 16 Nov 2019 |
| Proforma of Allotment letterFile: DIMPY E BUILDING PHASE-II DRAFT AGREEMENT.pdf | 10 Sep 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: JUN-19 ARCH-CERT - DIMPY.pdf | 25 Jul 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: JUN-19 ENGG-CERT - DIMPY.pdf | 25 Jul 2019 |
| Certificates of CA (Form 3)File: MAR-19 CA-CERT - DIMPY.pdf | 16 Jul 2019 |
| Layout approvalFile: PHASE-II NEW SANCTION PLAN.pdf | 24 Jun 2019 |
| Building plan approvalFile: PHASE-II NEW IOD.pdf | 24 Jun 2019 |
| Copy of Layout Approval (in case of layout)File: PHASE-II NEW SANCTION PLAN.pdf | 24 Jun 2019 |
| Building Plan Approval (IOD)File: PHASE-II NEW IOD.pdf | 24 Jun 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MAR-19 ENGG-CERT - DIMPY.pdf | 15 May 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MAR-19 ARCH-CERT - DIMPY.pdf | 15 Apr 2019 |
| Certificates of CA (Form 3)File: SEP-18 CA-CERT - DIMPY.pdf | 27 Feb 2019 |
| Certificates of CA (Form 3)File: DEC-18 CA-CERT - DIMPY.pdf | 27 Feb 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DEC-18 ARCH-CERT - DIMPY.pdf | 24 Jan 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DEC-18 ENGG-CERT - DIMPY.pdf | 24 Jan 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SEP-18 ARCH-CERT - DIMPY.pdf | 10 Oct 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SEP-18 ENGG-CERT - DIMPY.pdf | 10 Oct 2018 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| DIMPY ORIGEN | SECTOR 16 PLOT NO 20 ROADPALI KALAMBOLI PANVEL | 32 | Completed | Dec 2015 | Late, Mar 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 101 filed documents as one ZIP, foldered, with a manifest
Keep ARIHANT CITY PHASE-II - E BUILDING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BHIWANDI7,600+ in Thane
Filed coordinates, straight-line distance. 57 registered projects within 2 km.
GODREJ UPAVAN
PRAKHHYAT DWELLINGS LLP
DGT - Sector 3A - Cluster 2 - Phase 1
ADRIKA DEVELOPERS PRIVATE LIMITED
DOSTI GREATER THANE - PHASE 1
ADRIKA DEVELOPERS PRIVATE LIMITED
Dosti Greater Thane - Sector 3A - Cluster 1B -
ADRIKA DEVELOPERS PRIVATE LIMITED
USHA RESIDENCY
SHREE BUDHDEV INFRA
NARAYANI DHAM BUILDING NO 2A AND 2B
MAYA DEVELOPER
See every Thane project, with the district possession charts
Builder: DIMPY INFRA VENTURES PVT LTD
DIMPY INFRA VENTURES PVT LTD has 1 registration on MahaRERA, including ARIHANT CITY PHASE-II - E BUILDING. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if ARIHANT CITY PHASE-II - E BUILDING is delayed beyond 30 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ARIHANT CITY PHASE-II - E BUILDING?
The registered promoter entity is DIMPY INFRA VENTURES PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ARIHANT CITY PHASE-II - E BUILDING?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against ARIHANT CITY PHASE-II - E BUILDING?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for ARIHANT CITY PHASE-II - E BUILDING?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ARIHANT CITY PHASE-II - E BUILDING?
The professionals named in the filing: Architect: AKRUTI CONSULTANT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ARIHANT CITY PHASE-II - E BUILDING?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.