Home / Browse projects / Thane, Maharashtra / Arihant Anmol Phase V

Registered No litigation declared Residential / Group Housing project

Arihant Anmol Phase V

By ARIHANT VATIKA REALTY PRIVATE LIMITED

RG-MH-50526 · RERA P51700049294 · Last updated on MahaRERA portal: 15 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
134 of 134Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

Arihant Anmol Phase V is a Residential / Group Housing project by ARIHANT VATIKA REALTY PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700049294 on 7 Feb 2023. Possession is promised by 30 Dec 2028. 0 of the 134 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameArihant Anmol Phase V
  • TypeResidential / Group Housing
  • Location
    • Jouveli
    • Ambarnath
    • Badlapur (M Cl)
    • Thane
    • 421503
  • Pincode421503
  • RERA no.P51700049294
  • ReraGenie IDRG-MH-50526

Builder

  • NameARIHANT VATIKA REALTY PRIVATE LIMITED
  • Entity typeCompany
  • DirectorASHOKKUMAR BHANWARLAL CHHAJER
  • Other registrations8 more →
  • Completed7 of 9
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Feb 2023
  • Promised completion30 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed77 files

Current status

0%0 of 134 units booked
8.6%Work done, per cost certificate

Figures as on 15 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Arihant Anmol Phase V FNA1001340134

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

Arihant Anmol Phase V F: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed35

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots35
Closed/Covered1
Open Space34

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area26,152 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Jun 2025

Approvals and building plan

Sanctioning authorityKULGAON BADLAPUR MUNICIPAL COUNCIL
Permissible FSI12692.79
Proposed, not sanctioned7,682 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOpposite Turbhe railway station
Estimated costRs 21.54 cr
Cost incurredRs 1.84 cr
Work done8.55%
BuildingWingEstimatedIncurred
Arihant Anmol Phase V FNARs 20.37 crRs 1.84 cr
-NARs 1.17 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYOGITA BHANDARKAR
EngineerNARESH KASHINATH BHOIR
EngineerKALEEM SAYYAD
Chartered AccountantUmmed Jain & Co.
Chartered AccountantANJANI KUMAR GOYAL
Chartered AccountantCA ANJANI GOYAL & CO
PartnerRole in project
ARIHANT VATIKA REALTY PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Oct 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2028

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 15 Form 1 ANMOL PH V 310326.pdf15 Apr 2026
Withdrawal Update Form 1File: 15 Form 1 ANMOL PH V 310326.pdf15 Apr 2026
Withdrawal Update Form 2File: Form 2_Anmol Ph V_250326.pdf15 Apr 2026
Withdrawal Update Form 2File: Form 2_Anmol Ph V_250326.pdf15 Apr 2026
Withdrawal Update Form 3File: 15 Form 3_Anmol Ph V_250326.pdf15 Apr 2026
Withdrawal Update Form 3File: 15 Form 3_Anmol Ph V_250326.pdf15 Apr 2026
Withdrawal Update Form 1File: Form 1_Anmol Ph V_31122025.pdf21 Jan 2026
Withdrawal Update Form 2File: Form 2_Anmol Ph V_31122025.pdf21 Jan 2026
Withdrawal Update Form 3File: Form 3_Anmol Ph V_31122025.pdf21 Jan 2026
Withdrawal Update Form 1File: Form 1_ANMOL PHASE V_30092025.pdf27 Oct 2025
Withdrawal Update Form 2File: Form 2_Anmol Ph V_30092025.pdf27 Oct 2025
Withdrawal Update Form 3File: Form 3_Anmol Phase V_30092025.pdf27 Oct 2025
Form 5 (FY 2024-2025)File: Anmol Phase V.pdf17 Oct 2025
Form 2A (FY 2024-2025)File: Form 2A - Anmol Phase V_signed.pdf4 Oct 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Anmol Ph V_310325.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Anmol Ph-V_310325.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Anmol Ph V_310325_SIGNED.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE SIGNED.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Anmol Phase V.pdf19 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Anmol Phase V.pdf19 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Anmol Phase V.pdf19 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE SIGNED.pdf19 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Anmol Phase V_signed.pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Anmol Ph V.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE_SIGNED.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I - ANMOL PHASE V_SIGNED.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anmol Phase -5_SIGNED.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A ANMOL V FY 22-23.pdf23 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A ANMOL V FY 23-24.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Anmol V.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ANMOL PHASE V.PDF20 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure SIGNED.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30062024 Anmol 5 SIGNED.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Anmol V - Dec 23 SIGNED.pdf28 May 2024
Disclosure of sold/ booked inventoryFile: Anmol V - Mar 24 SIGNED.pdf28 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Anmol Phase V 31122023.PDF4 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Anmol Phase V 31122023.pdf4 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Anmol Phase V 31122023.pdf4 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 31032024 Anmol 5 SIGN.pdf23 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 1 (14).pdf3 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anmol Phase _5.pdf31 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE - ARIHANT ANMOL PHASE V 30TH DECEMBER 2023.PDF20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I ARIHANT ANMOL PHASE V.PDF19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 RERA Anmol Ph 5 Sept 2023.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: Arihant Anmol Phase 5.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Arihant Anmol Phase-V.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold or Booked Inventory-Anmol Phase V_March 2023.pdf28 Sep 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold or Booked Inventory_Anmol Phase V_June 2023.pdf28 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anmol V.pdf21 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 RERA Anmol 5 June 2023.pdf19 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARIHANT ANMOL PHASE V- 30 JUNE 2023.PDF17 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anmol V_11zon.pdf25 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ANMOL PHASE V 31 MARCH 23.PDF24 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 RERA ANMOL 5 MARCH2023.pdf19 Apr 2023
Proforma of Agreement for saleFile: Agreement.pdf4 Feb 2023
Deviation Report with respect to model copy of AgreementFile: Deviation.pdf4 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest.pdf1 Feb 2023
Building plan approvalFile: Building Plan3-5A.pdf10 Dec 2022
Copy of the legal title reportFile: Anmol V Title Report Title flow.pdf10 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Building Plan3-5A.pdf10 Dec 2022
Other - LegalFile: anmol v form b.pdf10 Dec 2022
Declaration about Commencement CertificateFile: FORMAT D.pdf24 Nov 2022
CERSAI detailsFile: Anmol V cersai.pdf24 Nov 2022
Details of encumbrances concerned to FinanceFile: Declaration Encumbrance of Anmol 17-11-2022.PDF21 Nov 2022
Details of encumbrances concerned to LegalFile: Declaration Encumbrance of Anmol 17-11-2022.PDF21 Nov 2022
Proforma of Allotment letterFile: Allotment Letter Anmol V- RERA.pdf21 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate1.pdf17 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: anmol bank DECL.pdf17 Nov 2022
Details of encumbrances concerned to FinanceFile: V encumbrance decl.pdf5 Nov 2022
Deviation Report with respect to Allotment letterFile: no Deviation in Allotment.pdf5 Nov 2022
Layout approvalFile: 1-2.pdf17 Oct 2022
PAN CardFile: PAN Card.pdf17 Oct 2022
Copy of Layout Approval (in case of layout)File: 1-2.pdf17 Oct 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf17 Oct 2022
Declaration in FORM BFile: V form b .pdf17 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ANMOL PHASE 5 - F WING.PDF17 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - ARIHANT ANMOL - PHASE 5.PDF17 Oct 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
ARIHANT ANMOL PHASE IJOUVELI BADLAPUR EAST434CompletedOct 2016Oct 2016

How this compares with Thane

0%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Arihant Anmol Phase V on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ambarnath7,600+ in Thane

Builder: ARIHANT VATIKA REALTY PRIVATE LIMITED

ARIHANT VATIKA REALTY PRIVATE LIMITED has 9 registrations on MahaRERA, including ARIHANT ANAIKA PHASE I and ARIHANT ANMOL PHASE II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Arihant Anmol Phase V is delayed beyond 30 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Arihant Anmol Phase V?

The registered promoter entity is ARIHANT VATIKA REALTY PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Arihant Anmol Phase V?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Arihant Anmol Phase V?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Arihant Anmol Phase V?

The professionals named in the filing: Architect: YOGITA BHANDARKAR; Engineer: NARESH KASHINATH BHOIR; Engineer: KALEEM SAYYAD; Chartered Accountant: Ummed Jain & Co.; Chartered Accountant: ANJANI KUMAR GOYAL; Chartered Accountant: CA ANJANI GOYAL & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Arihant Anmol Phase V?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Arihant Anmol Phase V. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Arihant Anmol Phase V to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.