ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / ARIHANT ANMOL PHASE III

Completed No litigation declared Residential / Group Housing project

ARIHANT ANMOL PHASE III

By ARIHANT VATIKA REALTY PRIVATE LIMITED

RG-MH-28710 · RERA P51700027339 · Last updated on MahaRERA portal: 15 Sep 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2026Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 85%
33 of 119Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 103 documents Report an error

ARIHANT ANMOL PHASE III is a Residential / Group Housing project by ARIHANT VATIKA REALTY PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700027339 on 4 Dec 2020. The registration is recorded completed; possession was promised by 30 Jun 2026. 86 of the 119 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameARIHANT ANMOL PHASE III
  • TypeResidential / Group Housing
  • Location
    • JOUVELI
    • AMBARNATH
    • Badlapur (M Cl)
    • Thane
    • 421503
  • Pincode421503
  • RERA no.P51700027339
  • ReraGenie IDRG-MH-28710

Builder

  • NameARIHANT VATIKA REALTY PRIVATE LIMITED
  • Entity typeCompany
  • DirectorASHOKKUMAR BHANWARLAL CHHAJER
  • Other registrations8 more →
  • Completed7 of 9
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2020PromisedJun 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on4 Dec 2020
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed103 files

Current status

72%86 of 119 units booked

Figures as on 15 Sep 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DNA16151190119

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 85%.

D: 87% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.77%

Progress on shared amenities15

As on 15 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed53

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots53
Closed/Covered19
Open Space34

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,850 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Jun 2025

Approvals and building plan

Sanctioning authorityKULGAON BADLAPUR MUNICIPAL COUNCIL
Permissible FSI3924.02
Proposed, not sanctioned2,616 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSECTOR-17 VASHI MAHARASHTRA

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYOGITA BHANDARKAR
EngineerKALEEM SAYYAD
Chartered AccountantANJANI KUMAR GOYAL
Chartered AccountantCA Anjani Goyal & Co
Chartered AccountantK C JAIN KALA & CO
PartnerRole in project
ARIHANT VATIKA REALTY PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Oct 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Sep 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed103

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Anmol Ph III_OC Verification Mail.pdf15 Sep 2025
Occupational CertificateFile: OC.pdf16 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Anmol Ph III_310325.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Anmol Ph III_310325.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Anmol Ph III_310325.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE SIGNED.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Anmol Phase III.pdf19 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Anmol Phase III.pdf19 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Anmol Phase III.pdf19 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLSOURE SIGNED.pdf19 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Anmol Phase III_Signed.pdf11 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Anmol Ph III.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE_SIGNED.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I - ANMOL PHASE III_SIGNED.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anmol Phase -3_SIGNED.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A ANMOL III FY 22-23.pdf23 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A ANMOL III FY 23-24.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Anmol III.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARIHANT ANMOL III.PDF20 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure SIGNED.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30062024 Anmol -III V1 SIGNED.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Anmol III - Dec 23 SIGNED.pdf28 May 2024
Disclosure of sold/ booked inventoryFile: Anmol III - Mar 24 SIGNED.pdf28 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Anmol Phase 3 31122023 revised SIGN.pdf10 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Anmol Phase III 31032024 revised SIGN.pdf10 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Anmol Phase 3 31122023.PDF8 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Anmol Phase III 31032024.PDF8 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Anmol Phase 3 31122023.pdf8 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Anmol Phase III 31032024.pdf8 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 31032024 Anmol 3 SIGN.pdf23 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anmol Phase -3.pdf13 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 1 (13).pdf3 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I ANMOL PHASE III 30 SEPTEMBER 2023.PDF19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 RERA Anmol Ph III Sept 2023.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: Arihant Anmol Phase 3.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Arihant Anmol Phase-III.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anmol 3_11zon.pdf21 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARIHANT ANMOL PHASE III - FORM 1 - ARCHITECT CERTIFICATE 30TH JUNE 2023 .PDF19 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 RERA Anmol 3 June 2023.pdf19 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I -ARIHANT ANMOL PHASE III 31 MARCH 2023.PDF21 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Anmol phase 3 _31032023.PDF21 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: anmol iii_11zon.pdf20 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anmol iii 211221.pdf21 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anmol iii 300622.pdf21 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anmol iii 300922.pdf21 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anmol iii 310321.pdf21 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anmol iii 310322.pdf21 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anmol iii 311221.pdf21 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anmol iii 311221.pdf21 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anmol iii 311222.pdf21 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: anmol phase 3 form 2 21 December 2021.PDF20 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: anmol phase 3 form 2 30 september 2022.PDF20 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: anmol phase 3 form 2 31 DECEMBER 2021.PDF20 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: anmol phase 3 form 2 31 DECEMBER 2022.PDF20 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: anmol phase 3 form 2 31 march 2021.PDF20 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: anmol phase 3 form 2 31 MARCH 2022.PDF20 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: anmol phase 3 form2 30 june 2022.PDF20 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ANMOL PHASE III FORM 1 21 DECEMBER 2021.PDF18 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ANMOL PHASE III FORM 1 30 JUNE 2022.PDF18 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ANMOL PHASE III FORM 1 30 SEPTEMBER 2022.PDF18 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ANMOL PHASE III FORM 1 30 SEPTEMBER 2022.PDF18 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ANMOL PHASE III FORM 1 31 DECEMBER 2021.PDF18 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ANMOL PHASE III FORM 1 31 DECEMBER 2022.PDF18 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ANMOL PHASE III FORM 1 31 MARCH 2021.PDF18 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ANMOL PHASE III FORM 1 31 MARCH 2022.PDF18 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: anmol phase 3 form 2 21 December 2021.PDF18 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: anmol phase 3 form 2 30 june 2022.PDF18 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: anmol phase 3 form 2 30 september 2022.PDF18 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: anmol phase 3 form 2 31 DECEMBER 2021.PDF18 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: anmol phase 3 form 2 31 DECEMBER 2021.PDF18 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: anmol phase 3 form 2 31 DECEMBER 2022.PDF18 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: anmol phase 3 form 2 31 DECEMBER 2022.PDF18 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: anmol phase 3 form 2 31 march 2021.PDF18 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: anmol phase 3 form 2 31 MARCH 2022.PDF18 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Arihant_Anmol_Phase3_Form 5_2020-21.pdf17 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM5 RERA ANMOL3 2022.PDF17 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2022.pdf19 Dec 2022
Layout approvalFile: 1.pdf21 Sep 2021
Building plan approvalFile: 2.pdf21 Sep 2021
Building plan approvalFile: 3.pdf21 Sep 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
ARIHANT ANMOL PHASE IJOUVELI BADLAPUR EAST434CompletedOct 2016Oct 2016

How this compares with Thane

72%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ARIHANT ANMOL PHASE III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AMBARNATH7,600+ in Thane

Builder: ARIHANT VATIKA REALTY PRIVATE LIMITED

ARIHANT VATIKA REALTY PRIVATE LIMITED has 9 registrations on MahaRERA, including ARIHANT ANAIKA PHASE I and ARIHANT ANMOL PHASE II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if ARIHANT ANMOL PHASE III is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ARIHANT ANMOL PHASE III?

The registered promoter entity is ARIHANT VATIKA REALTY PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ARIHANT ANMOL PHASE III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ARIHANT ANMOL PHASE III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ARIHANT ANMOL PHASE III?

The professionals named in the filing: Architect: YOGITA BHANDARKAR; Engineer: KALEEM SAYYAD; Chartered Accountant: ANJANI KUMAR GOYAL; Chartered Accountant: CA Anjani Goyal & Co; Chartered Accountant: K C JAIN KALA & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARIHANT ANMOL PHASE III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARIHANT ANMOL PHASE III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARIHANT ANMOL PHASE III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.