Home / Browse projects / Thane, Maharashtra / ARIHANT ANMOL PHASE III
ARIHANT ANMOL PHASE III
By ARIHANT VATIKA REALTY PRIVATE LIMITED
RG-MH-28710 · RERA P51700027339 · Last updated on MahaRERA portal: 15 Sep 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ARIHANT ANMOL PHASE III is a Residential / Group Housing project by ARIHANT VATIKA REALTY PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700027339 on 4 Dec 2020. The registration is recorded completed; possession was promised by 30 Jun 2026. 86 of the 119 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.
At a glance
Project
- NameARIHANT ANMOL PHASE III
- TypeResidential / Group Housing
- Location
- JOUVELI
- AMBARNATH
- Badlapur (M Cl)
- Thane
- 421503
- Pincode421503
- RERA no.P51700027339
- ReraGenie IDRG-MH-28710
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on4 Dec 2020
- Promised completion30 Jun 2026
- Revised completionNone
- Buildings1 building record
- Documents filed103 files
Current status
Figures as on 15 Sep 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| D | NA | 16 | 15 | 119 | 0 | 119 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 15 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 85%.
D: 87% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 85% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 77% |
Progress on shared amenities15
As on 15 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed53
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | YOGITA BHANDARKAR |
| Engineer | KALEEM SAYYAD |
| Chartered Accountant | ANJANI KUMAR GOYAL |
| Chartered Accountant | CA Anjani Goyal & Co |
| Chartered Accountant | K C JAIN KALA & CO |
| Partner | Role in project |
|---|---|
| ARIHANT VATIKA REALTY PRIVATE LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 19 Oct 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Sep 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Sep 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed103
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: Anmol Ph III_OC Verification Mail.pdf | 15 Sep 2025 |
| Occupational CertificateFile: OC.pdf | 16 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Anmol Ph III_310325.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Anmol Ph III_310325.pdf | 18 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Anmol Ph III_310325.pdf | 18 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE SIGNED.pdf | 18 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Anmol Phase III.pdf | 19 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Anmol Phase III.pdf | 19 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Anmol Phase III.pdf | 19 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLSOURE SIGNED.pdf | 19 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Anmol Phase III_Signed.pdf | 11 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Anmol Ph III.pdf | 21 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE_SIGNED.pdf | 21 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I - ANMOL PHASE III_SIGNED.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anmol Phase -3_SIGNED.pdf | 19 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A ANMOL III FY 22-23.pdf | 23 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A ANMOL III FY 23-24.pdf | 23 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Anmol III.pdf | 22 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARIHANT ANMOL III.PDF | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure SIGNED.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30062024 Anmol -III V1 SIGNED.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Anmol III - Dec 23 SIGNED.pdf | 28 May 2024 |
| Disclosure of sold/ booked inventoryFile: Anmol III - Mar 24 SIGNED.pdf | 28 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Anmol Phase 3 31122023 revised SIGN.pdf | 10 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Anmol Phase III 31032024 revised SIGN.pdf | 10 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Anmol Phase 3 31122023.PDF | 8 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Anmol Phase III 31032024.PDF | 8 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Anmol Phase 3 31122023.pdf | 8 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Anmol Phase III 31032024.pdf | 8 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 31032024 Anmol 3 SIGN.pdf | 23 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anmol Phase -3.pdf | 13 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 1 (13).pdf | 3 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I ANMOL PHASE III 30 SEPTEMBER 2023.PDF | 19 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 RERA Anmol Ph III Sept 2023.pdf | 19 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Arihant Anmol Phase 3.pdf | 19 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Arihant Anmol Phase-III.pdf | 19 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anmol 3_11zon.pdf | 21 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARIHANT ANMOL PHASE III - FORM 1 - ARCHITECT CERTIFICATE 30TH JUNE 2023 .PDF | 19 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 RERA Anmol 3 June 2023.pdf | 19 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I -ARIHANT ANMOL PHASE III 31 MARCH 2023.PDF | 21 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Anmol phase 3 _31032023.PDF | 21 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: anmol iii_11zon.pdf | 20 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anmol iii 211221.pdf | 21 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anmol iii 300622.pdf | 21 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anmol iii 300922.pdf | 21 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anmol iii 310321.pdf | 21 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anmol iii 310322.pdf | 21 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anmol iii 311221.pdf | 21 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anmol iii 311221.pdf | 21 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anmol iii 311222.pdf | 21 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: anmol phase 3 form 2 21 December 2021.PDF | 20 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: anmol phase 3 form 2 30 september 2022.PDF | 20 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: anmol phase 3 form 2 31 DECEMBER 2021.PDF | 20 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: anmol phase 3 form 2 31 DECEMBER 2022.PDF | 20 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: anmol phase 3 form 2 31 march 2021.PDF | 20 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: anmol phase 3 form 2 31 MARCH 2022.PDF | 20 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: anmol phase 3 form2 30 june 2022.PDF | 20 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ANMOL PHASE III FORM 1 21 DECEMBER 2021.PDF | 18 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ANMOL PHASE III FORM 1 30 JUNE 2022.PDF | 18 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ANMOL PHASE III FORM 1 30 SEPTEMBER 2022.PDF | 18 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ANMOL PHASE III FORM 1 30 SEPTEMBER 2022.PDF | 18 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ANMOL PHASE III FORM 1 31 DECEMBER 2021.PDF | 18 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ANMOL PHASE III FORM 1 31 DECEMBER 2022.PDF | 18 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ANMOL PHASE III FORM 1 31 MARCH 2021.PDF | 18 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ANMOL PHASE III FORM 1 31 MARCH 2022.PDF | 18 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: anmol phase 3 form 2 21 December 2021.PDF | 18 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: anmol phase 3 form 2 30 june 2022.PDF | 18 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: anmol phase 3 form 2 30 september 2022.PDF | 18 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: anmol phase 3 form 2 31 DECEMBER 2021.PDF | 18 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: anmol phase 3 form 2 31 DECEMBER 2021.PDF | 18 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: anmol phase 3 form 2 31 DECEMBER 2022.PDF | 18 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: anmol phase 3 form 2 31 DECEMBER 2022.PDF | 18 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: anmol phase 3 form 2 31 march 2021.PDF | 18 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: anmol phase 3 form 2 31 MARCH 2022.PDF | 18 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Arihant_Anmol_Phase3_Form 5_2020-21.pdf | 17 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM5 RERA ANMOL3 2022.PDF | 17 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2022.pdf | 19 Dec 2022 |
| Layout approvalFile: 1.pdf | 21 Sep 2021 |
| Building plan approvalFile: 2.pdf | 21 Sep 2021 |
| Building plan approvalFile: 3.pdf | 21 Sep 2021 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| ARIHANT ANMOL PHASE I | JOUVELI BADLAPUR EAST | 434 | Completed | Oct 2016 | Oct 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 8 other registrations, which the RERA portal never shows together
- All 103 filed documents as one ZIP, foldered, with a manifest
Keep ARIHANT ANMOL PHASE III on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near AMBARNATH7,600+ in Thane
PRADHAN MANTRI AWAS YOJANA - URBAN
KULGAON BADLAPUR MUNICIPAL COUNCIL
Mohan Alcoves I
MOHAN LIFESPACES LLP
MANOHAR VIKAS SHREEJI PARAISO PHASE - 2
DEEPLAXMI DEVELOPERS
SHREEJI MILESTONE
DEEP LAXMI ASSOCIATES
Mohan Willows III
MOHAN LIFESPACES LLP
SHREEJI SQUARE PHASE I
SHREEJI DEVELOPERS
See every Thane project, with the district possession charts
Builder: ARIHANT VATIKA REALTY PRIVATE LIMITED
ARIHANT VATIKA REALTY PRIVATE LIMITED has 9 registrations on MahaRERA, including ARIHANT ANAIKA PHASE I and ARIHANT ANMOL PHASE II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if ARIHANT ANMOL PHASE III is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ARIHANT ANMOL PHASE III?
The registered promoter entity is ARIHANT VATIKA REALTY PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ARIHANT ANMOL PHASE III?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ARIHANT ANMOL PHASE III?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ARIHANT ANMOL PHASE III?
The professionals named in the filing: Architect: YOGITA BHANDARKAR; Engineer: KALEEM SAYYAD; Chartered Accountant: ANJANI KUMAR GOYAL; Chartered Accountant: CA Anjani Goyal & Co; Chartered Accountant: K C JAIN KALA & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ARIHANT ANMOL PHASE III?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.