ARIHANT ANMOL PHASE II
By ARIHANT VATIKA REALTY PRIVATE LIMITED
RG-MH-24563 · RERA P51700003112 · Last updated on MahaRERA portal: 12 Apr 2023
Source: official MahaRERA filing
Red flags
- 4 complaints at MahaRERA
- Completion date moved by 18 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ARIHANT ANMOL PHASE II is a Residential / Group Housing project by ARIHANT VATIKA REALTY PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700003112 on 4 Aug 2017. The registration is recorded completed; possession was promised by 30 Mar 2022. The completion date has moved by 18 months from the original filing. 4 complaints are on record with the regulator.
At a glance
Project
- NameARIHANT ANMOL PHASE II
- TypeResidential / Group Housing
- Location
- Badlapur
- Badlapur (M Cl)
- Ambarnath
- Thane
- 421503
- Pincode421503
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700003112
- ReraGenie IDRG-MH-24563
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on4 Aug 2017
- Promised completion30 Mar 2022
- Revised completionRevised to 30 Mar 2022 (originally 30 Sep 2020)
- Buildings3 building records
- Documents filed35 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| B1 | NA | 13 | 0 | 0 | 0 | 0 |
| B2 | NA | 13 | 0 | 0 | 0 | 0 |
| B3 | NA | 12 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 12 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
30 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.
B191%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B291%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B391%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 12 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 95% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 80% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 95% |
| Electrical meter room, sub-station, receiving station | Yes | 80% |
| Aggregate area of recreational Open Space | Yes | 80% |
| Open Parking | No | Not applicable |
Parking filed85
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| B1 | 29 | 29 |
| B2 | 27 | 27 |
| B3 | 29 | 29 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | KIRAN K AWHALE |
| Engineer | Jitendra Gehlot |
| Partner | Role in project |
|---|---|
| ARIHANT VATIKA REALTY PRIVATE LIMITED | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe construction of the said project has been completed on 15th September, 2020 and we have received the Completion certificate issued by Mr. Satish Kanade, Architect dated 15th September, 2020 in this regard i.e. within the period stipulated in the registration certificate issued by the Maharashtra Real Estate Regulatory Authority and the same is attached herewith as Annexure III. Accordingly we have applied for the Occupancy Certificate of the said project vide our letter dated 15th September, 2020 with the above mention completion certificate issued by Mr. Satish Kanade, Architect. Accordin
Litigation declared1
| Case | Court | Status |
|---|---|---|
| SPECIAL CIVIL SUIT NO-360 OF 2012/2012 | CIVIL COURT SENIOR DIVISION KALYAN | NOTICE UNREADY |
Complaints filed with MahaRERA4
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000078599 | GANESH KRISHNAN | ARIHANT VATIKA REALTY PRIVATE LIMITED | 23/03/2019 |
| CC006000000195439 | Neelofer Abhijeet Pattebahadur | ARIHANT VATIKA REALTY PRIVATE LIMITED | 31/12/2020 |
| CC006000000251888 | HENRY DOUGLAS ANTHONY | Arihant Vatika Realty Pvt. Ltd. | 17/07/2022 |
| SM12600287 | Bhakti Achrekar | ARIHANT VATIKA REALTY PRIVATE LIMITED | 27/04/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Jan 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 Jan 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Jan 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 1 Oct 2020
Documents filed35
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Other - TechnicalFile: Clarification.pdf | 12 Apr 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society registration certificate-2.pdf | 17 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Arihant Anmol Phase II.pdf | 22 Feb 2022 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4_Anmol Phase II_131020.pdf | 13 Oct 2020 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate_Anmol II_300920.pdf | 1 Oct 2020 |
| OtherFile: Intimation to mahaRERA_Lockdown_Vatika.pdf | 1 Apr 2020 |
| OtherFile: final fire NOC - B block-7-2-2020.pdf | 7 Feb 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5_Anmol II_2018-19.PDF | 5 Dec 2019 |
| Proforma of Allotment letterFile: RERA Agreement Anmol Phase II.pdf | 13 Nov 2018 |
| Building plan approvalFile: B1, B2, B3 Ground Floor.pdf | 20 Jan 2018 |
| Building plan approvalFile: Bldg B1, B2, B3 even floor.pdf | 20 Jan 2018 |
| Building plan approvalFile: bldg B1, B2, B3 odd floor.pdf | 20 Jan 2018 |
| Building plan approvalFile: Bldg B1, B2, B3.pdf | 20 Jan 2018 |
| Layout approvalFile: layout.pdf | 20 Jan 2018 |
| Copy of Layout Approval (in case of layout)File: layout.pdf | 20 Jan 2018 |
| Building Plan Approval (IOD)File: B1, B2, B3 Ground Floor.pdf | 20 Jan 2018 |
| Building Plan Approval (IOD)File: Bldg B1, B2, B3 even floor.pdf | 20 Jan 2018 |
| Building Plan Approval (IOD)File: bldg B1, B2, B3 odd floor.pdf | 20 Jan 2018 |
| Building Plan Approval (IOD)File: Bldg B1, B2, B3.pdf | 20 Jan 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: cc.pdf | 20 Jan 2018 |
| Building plan approvalFile: Building Plan 3.pdf | 27 Jul 2017 |
| Building plan approvalFile: Building Plan 1.pdf | 27 Jul 2017 |
| Building plan approvalFile: Building Plan 2.pdf | 27 Jul 2017 |
| Layout approvalFile: LAYOUT.pdf | 27 Jul 2017 |
| Copy of the legal title reportFile: Title Certificate Arihant Anmol.PDF | 27 Jul 2017 |
| Details of encumbrancesFile: Arihant Vatika_Loan Declaration.PDF | 27 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: LAYOUT.pdf | 27 Jul 2017 |
| Building Plan Approval (IOD)File: Building Plan 1.pdf | 27 Jul 2017 |
| Building Plan Approval (IOD)File: Building Plan 2.pdf | 27 Jul 2017 |
| Building Plan Approval (IOD)File: Building Plan 3.pdf | 27 Jul 2017 |
| Declaration in FORM BFile: FORM B_Arihant Anmol.pdf | 27 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arihant Anmol Phase II_AC.pdf | 27 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Arihant Anmol Phase II_EC.PDF | 27 Jul 2017 |
| Certificates of CA (Form 3)File: Form 3 arihant ANMOL phase II.pdf | 27 Jul 2017 |
| Proforma of Allotment letterFile: RERA AGREEMENT - Arihant Anmol Phase - II.pdf | 27 Jul 2017 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| ARIHANT ANMOL PHASE I | JOUVELI BADLAPUR EAST | 434 | Completed | Oct 2016 | Oct 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 8 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 35 filed documents as one ZIP, foldered, with a manifest
Keep ARIHANT ANMOL PHASE II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Badlapur7,600+ in Thane
Filed coordinates, straight-line distance. 150 registered projects within 2 km.
PRADHAN MANTRI AWAS YOJANA - URBAN
KULGAON BADLAPUR MUNICIPAL COUNCIL
Mohan Alcoves I
MOHAN LIFESPACES LLP
MANOHAR VIKAS SHREEJI PARAISO PHASE - 2
DEEPLAXMI DEVELOPERS
SHREEJI MILESTONE
DEEP LAXMI ASSOCIATES
Mohan Willows III
MOHAN LIFESPACES LLP
SHREEJI SQUARE PHASE I
SHREEJI DEVELOPERS
See every Thane project, with the district possession charts
Builder: ARIHANT VATIKA REALTY PRIVATE LIMITED
ARIHANT VATIKA REALTY PRIVATE LIMITED has 9 registrations on MahaRERA, including ARIHANT ANAIKA PHASE I and ARIHANT ANMOL PHASE II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if ARIHANT ANMOL PHASE II is delayed beyond 30 Mar 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ARIHANT ANMOL PHASE II?
The registered promoter entity is ARIHANT VATIKA REALTY PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ARIHANT ANMOL PHASE II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against ARIHANT ANMOL PHASE II?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for ARIHANT ANMOL PHASE II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ARIHANT ANMOL PHASE II?
The professionals named in the filing: Architect: KIRAN K AWHALE; Engineer: Jitendra Gehlot. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ARIHANT ANMOL PHASE II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback