ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / ARIHANT AARADHYA PHASE II

Registered No litigation declared Residential / Group Housing project

ARIHANT AARADHYA PHASE II

By ARIHANT SUPERSTRUCTURES LIMITED

RG-MH-85827 · RERA P51700049981 · Last updated on MahaRERA portal: 17 Apr 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Rs 45.00 crore secured on the land, in favour of INDIA REAL ESTATE INVESTMENT FUND

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
9 of 44Construction stages doneacross 4 buildings; furthest along: Stilt Floor, 90%
305 of 412Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

ARIHANT AARADHYA PHASE II is a Residential / Group Housing project by ARIHANT SUPERSTRUCTURES LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700049981 on 6 Mar 2023. Possession is promised by 31 Dec 2030. 107 of the 412 units on this registration are recorded sold or booked, and 9 of 44 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameARIHANT AARADHYA PHASE II
  • TypeResidential / Group Housing
  • Location
    • Survey No 14/1
    • Bhiwandi
    • Bapgaon
    • Thane
    • 421302
  • Pincode421302
  • RERA no.P51700049981
  • ReraGenie IDRG-MH-85827

Builder

  • NameARIHANT SUPERSTRUCTURES LIMITED
  • Entity typeCompany
  • CINL51900MH1983PLC029643
  • GSTIN27AABCS1848L1Z2
  • DirectorsASHOKKUMAR BHANWARLAL CHHAJER, PARTH ASHOKKUMAR CHHAJER
  • Other registrations13 more →
  • Completed5 of 14

Key dates

this monthRegisteredMar 2023PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Mar 2023
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings4 building records
  • Documents filed73 files

Current status

26%107 of 412 units booked
39.0%Work done, per cost certificate

Figures as on 17 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NALDONA151482082
PATRACIANA15141100110
QUERIDANA15141100110
OSANENA15141100110

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 17 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Stilt Floor, at 90%.

NALDO46%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure66%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises14%
Sanitary Fittings within the flats / premises9%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks24%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
PATRACIA34%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth50%
Stilt Floor100%
Slabs of Super Structure73%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises22%
Sanitary Fittings within the flats / premises12%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks13%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
QUERIDA26%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth50%
Stilt Floor100%
Slabs of Super Structure33%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises3%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
OSANE34%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor70%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises12%
Sanitary Fittings within the flats / premises8%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks24%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes95%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed89

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots89
Closed/Covered89
BuildingClosed/CoveredTotal
NALDO1717
PATRACIA2424
QUERIDA2424
OSANE2424

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area29,700 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofINDIA REAL ESTATE INVESTMENT FUND
Secured amountRs 45.00 crore
CERSAI search filedYes
Declared on30 Oct 2025
LandownerVillageDistrict
Ashokkumar B. ChhajerNavi Mumbai (M Corp.)Thane

Approvals and building plan

Sanctioning authorityDISTRIC COLLECTOR THANE
Permissible FSI36523.72
Proposed, not sanctioned25,226 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd Office No 4 A wing Arihant Aura Building TTC Industrial Area Thane Belapur Road
Estimated costRs 73.07 cr
Cost incurredRs 28.53 cr
Work done39.04%
BuildingWingEstimatedIncurred
NALDONARs 17.31 crRs 7.13 cr
PATRACIANARs 17.31 crRs 7.13 cr
QUERIDANARs 17.31 crRs 7.13 cr
OSANENARs 17.31 crRs 7.13 cr
-NARs 3.85 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYogita Bhandarkar
EngineerKALEEM SAYYAD
EngineerPatel Mohd Faisal Mohd Hasan
Chartered AccountantANJANI KUMAR GOYAL
Chartered AccountantAnjani Goyal & Co.
Chartered AccountantUmmed Jain & Co.
PartnerRole in project
ARIHANT SUPERSTRUCTURES LIMITED-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12401229Sonam Shivkumar MauryaARIHANT SUPERSTRUCTURES LIMITED25/12/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 2 Form 1_Aaradhya Ph II_310326.pdf17 Apr 2026
Withdrawal Update Form 2File: Form 2_Aaradhya Ph II_250326.pdf17 Apr 2026
Withdrawal Update Form 3File: 2 Form 3_Aaradhya Ph II_250326.pdf17 Apr 2026
Withdrawal Update Form 1File: Form 1_Aaradhya Ph II_31122025.pdf21 Jan 2026
Withdrawal Update Form 2File: Form 2_Aaradhya Ph II_31122025.pdf21 Jan 2026
Withdrawal Update Form 3File: Form 3_Aaradhya Ph II_31122025.pdf21 Jan 2026
Withdrawal Update Form 1File: Form 1_AARADHYA PHASE II_30092025.pdf27 Oct 2025
Withdrawal Update Form 2File: Form 2_Aaradhya Ph II_30092025.pdf27 Oct 2025
Withdrawal Update Form 3File: Form 3_Aaradhya Ph II_30092025.pdf27 Oct 2025
Form 5 (FY 2024-2025)File: Aaradhya Phase ll.pdf17 Oct 2025
Form 2A (FY 2024-2025)File: Aaradhya Ph II.pdf4 Oct 2025
Commencement certificateFile: 1 Commencement Certificates _ NA Order for plotted development (5).pdf17 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Aaradhya Ph II_310325.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Aaradhya Ph-II_310325.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Aaradhya Phase II_310325.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE SIGNED.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - AARADHYA PHASE II.pdf19 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Aaradhya Ph 2-Signed.pdf19 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Aaradhya Ph II.pdf19 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE SIGNED.pdf19 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 Aradhya Phase 2_Signed.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I - AARADHYA PHASE II_SIGNED.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Aaradhya Ph II.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE_SIGNED.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aaradhya 2_SIGNED.pdf19 Oct 2024
Details of encumbrances concerned to FinanceFile: Aaradhya Ph II - Finance Encumbrance Cert with Index II.pdf17 Oct 2024
Declaration in FORM BFile: Aaradhya Ph II - Form B.pdf17 Oct 2024
Details of encumbrances concerned to LegalFile: Aaradhya Ph II - Finance Encumbrance Cert with Index II.pdf17 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A AARADHYA II FY 23-24.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Aaradhya II.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arihant Aaradhya Phase II.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure SIGNED.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30062024 Aaradhya 2 SIGNED.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Aaradhya Phase II 31122023.pdf19 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Aaradhya Phase II 31032024.pdf19 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_Aaradhya Phase 2_FY 22-23.pdf7 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Aaradhya Phase II 31122023.PDF3 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Aaradhya Phase II 31032024.PDF3 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Aaradhya Phase II 31122023.pdf3 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Aaradhya Phase II 31032024 SIGN.pdf3 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I AARADHYA PHASE II 30 SEPTEMBER 2023.PDF19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 RERA Aaradhya Ph II Sept 2023.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: Arihant Aaradhya Phase II.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Arihant Aaradhya Phase -2.pdf19 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A-Arihant Aaradhya Phase II.pdf9 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 RERA AARADHYA PH2 JUNE 2023.pdf20 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aaradhya phae ii.pdf20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARIHANT AARADHYA PHASE II - FORM 1 - ARCHITECT CERTIFICATE 30TH JUNE 2023 .PDF19 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AARADHYA PHASE II 31 MARCH 23.PDF19 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 RERA AARADHYA2 MARCH 2023.pdf19 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aaradhya Ph II_11zon1.pdf19 Apr 2023
Other - LegalFile: Deviation240223.pdf24 Feb 2023
Proforma of Agreement for saleFile: Agreement.pdf13 Feb 2023
Deviation Report with respect to model copy of AgreementFile: Deviation.pdf13 Feb 2023
Declaration in FORM BFile: Form B-.pdf9 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest.pdf2 Feb 2023
Layout approvalFile: 1layout.pdf28 Jan 2023
Building plan approvalFile: Bldg approval1.pdf28 Jan 2023
Details of encumbrances concerned to FinanceFile: Declaration Encumbrance Aaradhya1.pdf28 Jan 2023
Details of encumbrances concerned to LegalFile: Declaration Encumbrance Aaradhya1.pdf28 Jan 2023
Copy of Layout Approval (in case of layout)File: 1layout.pdf28 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Bldg approval1.pdf28 Jan 2023
CERSAI detailsFile: Cersai Decl.PDF28 Jan 2023
PAN CardFile: PAN Card_ASL.pdf29 Dec 2022
Copy of the legal title reportFile: Title Report, Title Flow, Search Report.PDF29 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf29 Dec 2022
Declaration about Commencement CertificateFile: Decl of CC.PDF29 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.PDF29 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2.PDF29 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.PDF29 Dec 2022
Proforma of Allotment letterFile: Allotment Letter Proforma.pdf29 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Bank Account Declaration.PDF29 Dec 2022
Deviation Report with respect to Allotment letterFile: Deviation Aaradhya Allotment L.PDF29 Dec 2022

How this compares with Thane

26%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ARIHANT AARADHYA PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhiwandi7,600+ in Thane

Builder: ARIHANT SUPERSTRUCTURES LIMITED

ARIHANT SUPERSTRUCTURES LIMITED has 14 registrations on MahaRERA, including ARIHANT ARSHIYA PHASE II and ARIHANT ARSHIYA PHASE III. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if ARIHANT AARADHYA PHASE II is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ARIHANT AARADHYA PHASE II?

The registered promoter entity is ARIHANT SUPERSTRUCTURES LIMITED, a company as per the filing. Its CIN L51900MH1983PLC029643 and GSTIN 27AABCS1848L1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ARIHANT AARADHYA PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ARIHANT AARADHYA PHASE II?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ARIHANT AARADHYA PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ARIHANT AARADHYA PHASE II?

The professionals named in the filing: Architect: Yogita Bhandarkar; Engineer: KALEEM SAYYAD; Engineer: Patel Mohd Faisal Mohd Hasan; Chartered Accountant: ANJANI KUMAR GOYAL; Chartered Accountant: Anjani Goyal & Co.; Chartered Accountant: Ummed Jain & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARIHANT AARADHYA PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARIHANT AARADHYA PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARIHANT AARADHYA PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.