Registered No litigation declared Residential / Group Housing project

ARENA SQUARE

By EMPIRE ARENA

RG-MH-06598 · RERA P51700053120 · Last updated on MahaRERA portal: 23 Jun 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2030Possession promisedno revision filed
6 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 85%
33 of 75Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 110 documents Report an error

ARENA SQUARE is a Residential / Group Housing project by EMPIRE ARENA in Thane, Maharashtra, registered with MahaRERA as P51700053120 on 16 Oct 2023. Possession is promised by 30 Jun 2030. 42 of the 75 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameARENA SQUARE
  • TypeResidential / Group Housing
  • Location
    • SHIL
    • MUMBRA
    • Thane (M Corp.)
    • Thane
    • 400612
  • Pincode400612
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700053120
  • ReraGenie IDRG-MH-06598

Builder

  • NameEMPIRE ARENA
  • Entity typePartnership
  • PartnersNOOR MOHAMMAD DOST MOHAMMAD KHAN, MOHAMMED HUMAYUN ZAHEER AHMED SHAIKH, MOHD MOZZAM ZAHEERUDIN KHAN, MOHD DANISH NOOR MOHAMMAD KHAN, MOHAMMAD ADIL SIDDIQUE KHAN

Key dates

this monthRegisteredOct 2023PromisedJun 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Oct 2023
  • Promised completion30 Jun 2030
  • Revised completionNone
  • Buildings2 building records
  • Documents filed110 files

Current status

56%42 of 75 units booked
107.2%Work done, per cost certificate

Figures as on 23 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO ANA65173451
BUILDING NO BNA6423124

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 23 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 85%.

BUILDING NO A50%
ActivityProgress
Excavation100%
Basement (if any)85%
Podiums (if any)75%
Plinth100%
Stilt Floor100%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises1%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO B50%
ActivityProgress
Excavation100%
Basement (if any)85%
Podiums (if any)75%
Plinth100%
Stilt Floor100%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises1%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed78

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots78
Closed/Covered20
Open Space58
BuildingClosed/CoveredOpen SpaceTotal
BUILDING NO A82937
BUILDING NO B122941

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,430 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Nov 2025
LandownerVillageDistrict
SAFIYA BEGUM ABDUL AZIZ KHANMumbai CityMumbai City

Approvals and building plan

Permissible FSI41372.14
Proposed, not sanctioned5,589 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch52PC-HG8, SURME PLAZA GROUND FLOOR, OPP MILLENNIUM HOSPITAL,OLD Mumbai - Pune Rd, Kausa, Mumbra, Tha
Estimated costRs 17.05 cr
Cost incurredRs 18.27 cr
Work done107.18%
BuildingWingEstimatedIncurred
BUILDING NO ANARs 12.56 crRs 13.86 cr
BUILDING NO BNARs 4.12 crRs 4.42 cr
-NARs 36.42 lakh-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRIGHT ANGLE ARCHITECTS & INTERIOR DESIGNERS
EngineerSSCONS CONSULTING STRUCTURAL ENGINEERS
EngineerREALTECH SOLUTIONS SIMPLIFIED PVT LITD
EngineerMariyam Buildcon Pvt Ltd
Chartered AccountantBHURANI & ASSOCIATES
Chartered AccountantSHABBAR & ASSOCIATES
Chartered AccountantAS SUTERWALA & CO
PartnerRole in project
EMPIRE ARENA-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000408457Barkatullah Ali Hasan ShaikhMr. Mohd. Adil Siddique Khan13/01/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2030

Documents filed110

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 110 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate FY 2025-26 Q4.pdf23 Jun 2026
Withdrawal Update Form 2File: Engineer Certificate FY 2025-26 Q4.pdf23 Jun 2026
Withdrawal Update Form 3File: CA Certificate FY 2025-26 Q4.pdf23 Jun 2026
Withdrawal Update Form 1File: Architech Certificate FY 2025-26 Q3.pdf13 Jun 2026
Withdrawal Update Form 2File: Engineer Certificate FY 2025-26 Q3.pdf13 Jun 2026
Withdrawal Update Form 3File: CA Certificate FY 2025-26 Q3.pdf13 Jun 2026
Form 2A (FY 2023-2024)File: Quality Assurance Certificate FY 23-24.pdf9 Apr 2026
Withdrawal Update Form 1File: Architech Certificate FY 2025-26 Q2.pdf8 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate FY 2025-26 Q2.pdf8 Apr 2026
Withdrawal Update Form 3File: CA Certificate FY 2025-26 Q2.pdf8 Apr 2026
Form 1File: Architect Certificate FY 2024-25 Q4.pdf17 Mar 2026
Form 2File: Engineer Certificate FY 2024-25 Q4.pdf17 Mar 2026
Form 3File: CA Certificate FY 2024-25 - Q4.pdf17 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory FY 2024-25 Q4.pdf17 Mar 2026
Withdrawal Update Form 1File: Architect Certificate FY 2025-26 Q1.pdf17 Mar 2026
Withdrawal Update Form 2File: Engineer Certificate FY 2025-26 Q1.pdf17 Mar 2026
Withdrawal Update Form 3File: CA Certificate FY 2025-26 Q1.pdf17 Mar 2026
Form 1File: Architect Certificate FY 24-25-Q1.pdf23 Jan 2026
Form 2File: Engineer Certificate FY 24-25-Q1.pdf23 Jan 2026
Form 3File: CA Certificate FY 24-25-Q1- Revised.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory FY 24-25-Q1.pdf23 Jan 2026
Form 1File: Architect Certificate FY 24-25-Q2.pdf23 Jan 2026
Form 2File: Engineer Certificate FY 24-25-Q2.pdf23 Jan 2026
Form 3File: CA Certificate FY 24-25-Q2.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory FY 24-25-Q2.pdf23 Jan 2026
Form 1File: Architect Certificate FY 24-25-Q3.pdf23 Jan 2026
Form 2File: Engineer Certificate FY 24-25-Q3.pdf23 Jan 2026
Form 3File: CA Certificate FY 24-25-Q3.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory FY 24-25-Q3.pdf23 Jan 2026
Form 1File: Architect Certificate FY 23-24-Q3.pdf22 Jan 2026
Form 2File: Engineer Certificate FY 23-24-Q3.pdf22 Jan 2026
Form 3File: CA Certificate FY 23-24-Q3.pdf22 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory FY 23-24-Q3.pdf22 Jan 2026
Form 1File: Architect Certificate FY 23-24-Q4.pdf22 Jan 2026
Form 2File: Engineer Certificate FY 23-24-Q4.pdf22 Jan 2026
Form 3File: CA Certificate FY 23-24-Q4- Revised.pdf22 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory FY 23-24-Q4.pdf22 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 Audit Report FY 2024-25.pdf29 Nov 2025
Form 5 (FY 2023-2024)File: Form 5 Audit Report FY 2023-24.pdf29 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate FY 24-25-Q3 Upload.pdf15 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate FY 24-25-Q3 Upload.pdf15 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate FY 24-25-Q3.pdf31 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory FY 24-25-Q3.pdf31 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Audit Report - Empire Arena.pdf16 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Audit Report - Empire Arena.pdf16 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory FY 24-25-Q2.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate FY 24-25-Q2- Upload.pdf11 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate FY 24-25-Q2.pdf11 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate FY 23-24-Q4- Revised.pdf11 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate FY 24-25-Q1- Revised.pdf11 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate FY 24-25-Q2.pdf11 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate FY 24-25-Q1.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate FY 24-25-Q1.pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate FY 24-25-Q1.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory FY 24-25-Q1.pdf20 Jul 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of Secured Unsecured Finance.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate FY 24-25-Q1.pdf20 Jul 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration New.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate FY 23-24-Q3.pdf24 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate FY 23-24-Q4.pdf24 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate FY 23-24-Q4.pdf24 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate FY 23-24.pdf24 May 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory FY 23-24-Q4.pdf24 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate FY 23-24-Q4.pdf24 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate FY 23-24-Q3.pdf20 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QA Declaration FY 19-20.pdf15 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QA Declaration FY 20-21.pdf15 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QA Declaration FY 21-22.pdf15 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QA Declaration FY 22-23.pdf15 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory FY 23-24-Q3.pdf15 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate FY 23-24-Q3.pdf15 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Audit Declaration FY 17-18.pdf15 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Audit Declaration FY 18-19.pdf15 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Audit Declaration FY 19-20.pdf15 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Audit Declaration FY 20-21.pdf15 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Audit Declaration FY 21-22.pdf15 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Audit Declaration FY 22-23.pdf15 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Cert.pdf8 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Upload.pdf8 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Upload.pdf8 Sep 2023

How this compares with Thane

56%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ARENA SQUARE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MUMBRA7,600+ in Thane

2 kmARENA SQUARECompleted 32Lapsed / revoked 19Other 45Dot size: filed unitsN

Filed coordinates, straight-line distance. 96 registered projects within 2 km.

Builder: EMPIRE ARENA

EMPIRE ARENA has 1 registration on MahaRERA, including ARENA SQUARE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if ARENA SQUARE is delayed beyond 30 Jun 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ARENA SQUARE?

The registered promoter entity is EMPIRE ARENA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ARENA SQUARE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ARENA SQUARE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ARENA SQUARE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ARENA SQUARE?

The professionals named in the filing: Architect: RIGHT ANGLE ARCHITECTS & INTERIOR DESIGNERS; Engineer: SSCONS CONSULTING STRUCTURAL ENGINEERS; Engineer: REALTECH SOLUTIONS SIMPLIFIED PVT LITD; Engineer: Mariyam Buildcon Pvt Ltd; Chartered Accountant: BHURANI & ASSOCIATES; Chartered Accountant: SHABBAR & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARENA SQUARE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARENA SQUARE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARENA SQUARE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.