Archit Jewel

By Archit Enterprises

RG-MH-37402 · RERA P51700009850 · Last updated on MahaRERA portal: 11 Dec 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 43 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
34 of 44Construction stages doneacross 4 buildings; furthest along: Slabs of Super Structure, 85%
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

Archit Jewel is a Others project by Archit Enterprises in Thane, Maharashtra, registered with MahaRERA as P51700009850 on 22 Aug 2017. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 43 months from the original filing.

At a glance

Project

  • NameArchit Jewel
  • TypeOthers
  • Location
    • Mumbra Road
    • Mumbra
    • Thane (M Corp.)
    • Thane
    • 400612
  • Pincode400612
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700009850
  • ReraGenie IDRG-MH-37402

Builder

  • NameArchit Enterprises
  • Entity typePartnership
  • PartnerGanesh Ramchandra Kine

Key dates

10 months past promisethis monthRegisteredAug 2017First promiseMay 2022Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on22 Aug 2017
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 30 May 2022)
  • Buildings4 building records
  • Documents filed73 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 1NA90000
Building No 1ANA20000
building No 2NA160000
Building No 3NA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 11 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

34 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 85%.

Building No 191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building No 1A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
building No 291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building No 365%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks45%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.45%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.45%

Progress on shared amenities15

As on 11 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed40

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots40
Closed/Covered36
Open Space4
BuildingClosed/CoveredOpen SpaceTotal
Building No 1617
Building No 1A011
building No 213114
Building No 317118

Land and ownership8

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,190 sq m
Land owned byThe promoter, with other names on the file
Named landowners8
LandownerVillageDistrict
Vijay Ramchandra KineThane (M Corp.)Thane
Shobha Nandakumar PatilThane (M Corp.)Thane
Prabhakar Ramchandra KineThane (M Corp.)Thane
Nanda Datta TareKalyanThane
Ganesh Ramchandra KineThane (M Corp.)Thane
Babybai Kesarinath BhandariBorivaliMumbai Suburban
Ashok Ramchandra KineThane (M Corp.)Thane
Anjani Balu KharkarThane (M Corp.)Thane

Approvals and building plan

Permissible FSI3468.18
Proposed, not sanctioned3,468 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAbdulla Patel High School Kismat Colony Kausa Mumbra dist Thane

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBuildform Architect
EngineerShravaniConsultant
PartnerRole in project
Archit Enterprises-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700012513May 2022 → Aug 2023

Reason as filed by the promoterWe sought an extension for project completion due to the main reason listed below: 1. Our project is badly affected by Covid impact. 2. Due to Skilled labour unavailability and labour migration issues, project is affected a lot. Even contractors are asking us to allow them more time due to labour issues. 3. Customers are also facing financial problems There are huge receivable from the customers but we are unable to receive the same, which in turn has affected our financial position as well. Customers and we both are highly affected in last 1 and half year. 4. Since last 3 years market slow-do

EXT51700025439May 2022 → Dec 2025

Reason as filed by the promoterThis application is for additional 4 Floors in Building no.3. As per earlier CC, we completed work of Building no.1A, 1, 2 and 3 and Form 4 Submitted for the same. In Earlier CC, sanction was up to 3 Floors only. We received extended / Revised CC on 07/03/2024 for additional floors from 4th to 7th in Building no.3. Meanwhile our uncle was hospitalised and we could not apply for extention. We hereby Request you, to grant extention for our Project- Archit Jewel till 31/12/2025. Thank you.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 Sep 2023

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: Form B.pdf11 Dec 2024
Disclosure of sold/ booked inventoryFile: Revised Sold Unsold Details.pdf11 Dec 2024
Other - TechnicalFile: Reply to Maharera Mail.pdf11 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration about Separate Bank Account for real estate projects.pdf6 Dec 2024
Deviation Report with respect to Allotment letterFile: Deviation Report with Respect to Allotment Letter.pdf6 Dec 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report with Respect to Agreement for Sale.pdf6 Dec 2024
Proforma of Agreement for saleFile: AGreement for Sales.pdf6 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in Other Real Estate Organization-Ganesh Kine.pdf6 Dec 2024
Disclosure for secured/unsecured finance availed for the projectFile: Declaration with respect to Security Interest and Finance Charges.pdf6 Dec 2024
Layout approvalFile: Plan And CC of Third Building.pdf3 Dec 2024
Copy of Layout Approval (in case of layout)File: Plan And CC of Third Building.pdf3 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 Architect Certificate 30-09-24.pdf3 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 Architect Certificate 30-06-24.pdf3 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 Architect Certificate 20-03-24.pdf3 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 Architect Certificate 31-12-23.pdf3 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 Architect Certificae 30-09-23.pdf3 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 Architect Certificate 30-06-23.pdf3 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 Architect Certificate 31-03-23.pdf3 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 Architect Certificate 31-12-22.pdf3 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 Architect Certificate 30-09-22.pdf3 Dec 2024
Certificates of CA (Form 3)File: FORM 3 CA Certificate 30-06-2024.pdf3 Dec 2024
Certificates of CA (Form 3)File: FORM 3 CA Certificate 30-09-2024.pdf3 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Engineer Certificate 31-12-23.pdf3 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate 30-09-24.pdf3 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate 30-06-24.pdf3 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate 20-03-24.pdf3 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate 23-09-23.pdf3 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GetUserDocumentFileContent.pdf3 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate 31-03-23.pdf3 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate 31-12-22.pdf3 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate 30-09-22.pdf3 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate 30-06-23.pdf3 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineer Quality Certificate 31-09-22.pdf3 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer Quality Certificate 31-12-22.pdf3 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer Quality Certificate 30-09-24.pdf3 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Annual Report 2022-23.pdf3 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Quality Certificate 31-03-24.pdf3 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Quality Certificate 30-06-24.pdf3 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Annual Report 2023-24.pdf3 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form4 1.pdf30 Nov 2024
Declaration about Commencement CertificateFile: CC Declaration.pdf30 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: Rera Competition Certificate - Form 4.pdf19 Nov 2024
Declaration about Commencement CertificateFile: Declaration for Commencement Certificate.pdf12 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: Competition Certificate From Architect - Form 4.pdf15 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Sanction Letter - Extention 3rd Floor to 7th Floor.pdf15 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate.pdf27 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5_compressed.pdf4 Sep 2022
Certificates of CA (Form 3)File: FORM 3 JAN 22 TO MAR 22_compressed.pdf2 Sep 2022
Certificates of CA (Form 3)File: FORM 3 APR 22 TO JUN 22_compressed.pdf2 Sep 2022
Proforma of Allotment letterFile: Revised New Allotment Letter format.pdf2 Sep 2022
Details of encumbrances concerned to LegalFile: Legal Encrumbances.pdf30 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf30 Aug 2022
Declaration about Commencement CertificateFile: Declaration about Comm Certificate.pdf30 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer Certificate 30-06-22.pdf30 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer Certificate 31-03-22_compressed.pdf30 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Quality Assurance 30-6-22_compressed.pdf30 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Quality Assurance 31-03-22_compressed.pdf30 Aug 2022
Disclosure of sold/ booked inventoryFile: Sold unsold details.pdf30 Aug 2022
CERSAI detailsFile: Cersai Report.pdf30 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FORM 5_compressed.pdf30 Aug 2022
Layout approvalFile: 4-Layout.pdf31 Jul 2017
Building plan approvalFile: 13-IOD.pdf31 Jul 2017
PAN CardFile: 1-PAN.pdf31 Jul 2017
Copy of the legal title reportFile: 2-Legal Titel.pdf31 Jul 2017
Details of encumbrancesFile: 3-Letter Of Encuberance.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: 4-Layout.pdf31 Jul 2017
Building Plan Approval (IOD)File: 13-IOD.pdf31 Jul 2017
Declaration in FORM BFile: Form B Archit.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certi_opt.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA Certificate.pdf31 Jul 2017
Proforma of Allotment letterFile: 5-AFS - ARCHIT ENTERPRISES - ARCHIT JEWEL - RERA DOC.pdf31 Jul 2017
Proforma of Allotment letterFile: 5-allotment letters.pdf31 Jul 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 43 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Archit Jewel on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mumbra7,600+ in Thane

2 kmArchit JewelCompleted 33Lapsed / revoked 19Other 35Dot size: filed unitsN

Filed coordinates, straight-line distance. 87 registered projects within 2 km.

Builder: Archit Enterprises

Archit Enterprises has 1 registration on MahaRERA, including Archit Jewel. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that Archit Jewel shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Archit Jewel is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Archit Jewel?

The registered promoter entity is Archit Enterprises, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Archit Jewel?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Archit Jewel?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Archit Jewel?

The professionals named in the filing: Architect: Buildform Architect; Engineer: ShravaniConsultant. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Archit Jewel?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Archit Jewel. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Archit Jewel to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.