Home / Browse projects / Mumbai Suburban, Maharashtra / ARAVE

Registered No litigation declared Residential / Group Housing project

ARAVE

By JRT REALTY LLP

RG-MH-31145 · RERA P51800079479 · Last updated on MahaRERA portal: 10 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 1 extension taken
  • Rs 40.00 crore secured on the land, in favour of Aditya birla housing finance limited

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Apr 2029Possession promisedmoved 4 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 50%
23 of 23Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

ARAVE is a Residential / Group Housing project by JRT REALTY LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800079479 on 7 Mar 2025. Possession is promised by 30 Apr 2029. The completion date has moved by 4 months from the original filing. 0 of the 23 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameARAVE
  • TypeResidential / Group Housing
  • Location
    • Lallubhai Park Road
    • Vile Parle West
    • Andheri
    • Mumbai Suburban
    • 400056
  • Pincode400056
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800079479
  • ReraGenie IDRG-MH-31145

Builder

  • NameJRT REALTY LLP
  • Entity typePartnership
  • PartnersRoshani vivek Thar, Chintan Hitendra Shah, Niraj Kiran Shah, Vinit K Shah, Ila Jayesh Thar, Dhara Chintan Shah, Hitendra K Shah, Hina Jigar Desai, Bhavya Bharat Parekh

Key dates

this monthRegisteredMar 2025First promiseDec 2028Revised toApr 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Mar 2025
  • Promised completion30 Apr 2029
  • Revised completionRevised to 30 Apr 2029 (originally 31 Dec 2028)
  • Buildings1 building record
  • Documents filed89 files

Current status

0%0 of 23 units booked
57.8%Work done, per cost certificate

Figures as on 10 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ARAVENA6623023

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 50%.

ARAVE: 42% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 10 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed93

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots93
Closed/Covered93

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,613 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofAditya birla housing finance limited
Secured amountRs 40.00 crore
CERSAI search filedYes
Declared on10 Aug 2026
LandownerVillageDistrict
NAVSHILPVANI CHS LTDAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI6534.27
Proposed, not sanctioned1,528 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., M.S.C.Bldg,Sahar Rd,Koldongri,AndheriEBombay.400069
Estimated costRs 22.38 cr
Cost incurredRs 12.93 cr
Work done57.8%
BuildingWingEstimatedIncurred
ARAVENARs 19.02 crRs 12.93 cr
-NARs 3.36 cr-

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectManish Shah shah
EngineerAshish shah
EngineerInfiniti Engineers
EngineerSiddesh Gawde
Chartered AccountantSameer R shah
Chartered AccountantSanjay K sharma
Chartered AccountantNirav Vora
Chartered AccountantAnkita lunia
PartnerRole in project
JRT REALTY LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P51800079479/WarDec 2028 → Apr 2029

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Feb 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Aug 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Aug 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2029

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Commencement certificateFile: 2504268_FurtherCC_signed (1).pdf10 Aug 2026
Commencement certificateFile: FURTHERCCSIGNED.pdf10 Aug 2026
Building plan approvalFile: BUILDINGPLANAPPROVALFINAL.pdf10 Aug 2026
Building plan approvalFile: page1.pdf10 Aug 2026
Building plan approvalFile: page2.pdf10 Aug 2026
Building plan approvalFile: page3.pdf10 Aug 2026
Building plan approvalFile: PAGE4.pdf10 Aug 2026
Building plan approvalFile: PAGE5.pdf10 Aug 2026
Building plan approvalFile: PAGE6.pdf10 Aug 2026
Building plan approvalFile: PAGE7.pdf10 Aug 2026
Withdrawal Update Form 1File: Form-1.pdf10 Aug 2026
Withdrawal Update Form 2File: Form-2.pdf10 Aug 2026
Withdrawal Update Form 3File: form3final.pdf10 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A.pdf5 Aug 2026
Withdrawal Update Form 1File: Form-1 Sign.pdf15 May 2026
Withdrawal Update Form 2File: Form-2 sign.pdf15 May 2026
Withdrawal Update Form 3File: Form3Final.pdf15 May 2026
Withdrawal Update Form 1File: Form 1.pdf24 Apr 2026
Withdrawal Update Form 2File: form2 final.pdf24 Apr 2026
Withdrawal Update Form 3File: Form3final pdf.pdf24 Apr 2026
Form 2A (FY 2024-2025)File: FORM 2A_.pdf13 Jan 2026
Withdrawal Update Form 1File: Form 1 Jrt Realty.pdf6 Nov 2025
Withdrawal Update Form 2File: Form 2 Jrt Realty.pdf6 Nov 2025
Withdrawal Update Form 3File: Form 3 Jrt Realty Reduce.pdf6 Nov 2025
Form 5 (FY 2024-2025)File: Form -5.pdf28 Oct 2025
Form 1File: FORM-1.pdf23 Jul 2025
Form 2File: FORM-2.pdf23 Jul 2025
Form 3File: FORM-3.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD.pdf23 Jul 2025
Form 1File: Form 1.pdf30 May 2025
Form 2File: Form 2.pdf30 May 2025
Form 3File: Form 3.pdf30 May 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf30 May 2025
Other - FinanceFile: JRT REALTY LLP DECLARATION.pdf24 Feb 2025
Other - TechnicalFile: Annexure A order 50.pdf24 Feb 2025
Proforma of Agreement for saleFile: Agreement for sale final new F.pdf24 Feb 2025
Layout approvalFile: PAGE 3.pdf13 Feb 2025
Layout approvalFile: PAGE 4.pdf13 Feb 2025
Layout approvalFile: PAGE 5.pdf13 Feb 2025
Building plan approvalFile: PAGE 1.pdf13 Feb 2025
Building plan approvalFile: PAGE 2.pdf13 Feb 2025
PAN CardFile: PAN JRT Realty LLP.pdf13 Feb 2025
Copy of the legal title reportFile: 18 Legal Title Reportcompressed.pdf13 Feb 2025
Details of encumbrances concerned to FinanceFile: Finance Encumbrances.pdf13 Feb 2025
Details of encumbrances concerned to FinanceFile: Legal Encumbrances.pdf13 Feb 2025
Copy of Layout Approval (in case of layout)File: PAGE 3.pdf13 Feb 2025
Copy of Layout Approval (in case of layout)File: PAGE 4.pdf13 Feb 2025
Copy of Layout Approval (in case of layout)File: PAGE 5.pdf13 Feb 2025
Proforma of Allotment letterFile: Allotment Letter C.pdf13 Feb 2025
Declaration in FORM BFile: Form B.pdf13 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf13 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 f.pdf13 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf13 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf13 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: PAGE 1.pdf13 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: PAGE 2.pdf13 Feb 2025
Other - LegalFile: LLP Agreement.pdf13 Feb 2025
Other - LegalFile: SDA part 6.pdf13 Feb 2025
Other - LegalFile: SDA part 5.pdf13 Feb 2025
Other - LegalFile: SDA part 4.pdf13 Feb 2025
Other - LegalFile: SDA part 3.pdf13 Feb 2025
Other - LegalFile: SDA part 2.pdf13 Feb 2025
Other - LegalFile: SDA part 1.pdf13 Feb 2025
Other - LegalFile: DA 6.pdf13 Feb 2025
Other - LegalFile: DA 5.pdf13 Feb 2025
Other - LegalFile: DA 4.pdf13 Feb 2025
Other - LegalFile: DA 3.pdf13 Feb 2025
Other - LegalFile: DA 2.pdf13 Feb 2025
Other - LegalFile: DA 1.pdf13 Feb 2025
Other - LegalFile: Society Power.pdf13 Feb 2025
Declaration about Commencement CertificateFile: cc declaration.pdf13 Feb 2025
CERSAI detailsFile: Cersai declaration.pdf13 Feb 2025
CERSAI detailsFile: CERSAI REPORT.pdf13 Feb 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Seprate Bank account disclosure.pdf13 Feb 2025
Deviation Report with respect to Allotment letterFile: No deviation in allotment.pdf13 Feb 2025
Details of encumbrances concerned to LegalFile: Finance Encumbrances.pdf13 Feb 2025
Details of encumbrances concerned to LegalFile: Legal Encumbrances.pdf13 Feb 2025
Deviation Report with respect to model copy of AgreementFile: AFS Deviation final.pdf13 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Bhavya Parekh.pdf13 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Chintan Shah.pdf13 Feb 2025

How this compares with Mumbai Suburban

0%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 4 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ARAVE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vile Parle West6,700+ in Mumbai Suburban

2 kmARAVECompleted 172Lapsed / revoked 105Other 165Dot size: filed unitsN

Filed coordinates, straight-line distance. 442 registered projects within 2 km.

Builder: JRT REALTY LLP

JRT REALTY LLP has 1 registration on MahaRERA, including ARAVE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if ARAVE is delayed beyond 30 Apr 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ARAVE?

The registered promoter entity is JRT REALTY LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ARAVE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ARAVE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ARAVE?

The professionals named in the filing: Architect: Manish Shah shah; Engineer: Ashish shah; Engineer: Infiniti Engineers; Engineer: Siddesh Gawde; Chartered Accountant: Sameer R shah; Chartered Accountant: Sanjay K sharma. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARAVE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARAVE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARAVE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.