Home / Browse projects / Thane, Maharashtra / APNA GHAR PHASE III NX

Registered No litigation declared Residential / Group Housing project

APNA GHAR PHASE III NX

By Seven Eleven Construction Pvt Ltd

RG-MH-52456 · RERA P51700045229 · Last updated on MahaRERA portal: 5 May 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
0 of 44Construction stages doneacross 4 buildings; furthest along: Excavation, 0%
1Complaints at MahaRERAon this registration
Jump to the 49 documents Report an error

APNA GHAR PHASE III NX is a Residential / Group Housing project by Seven Eleven Construction Pvt Ltd in Thane, Maharashtra, registered with MahaRERA as P51700045229 on 10 May 2022. Possession is promised by 31 Mar 2027. 1 complaint is on record with the regulator.

At a glance

Project

  • NameAPNA GHAR PHASE III NX
  • TypeResidential / Group Housing
  • Location
    • VINAY NAGAR BEHIND JNAKAR COMPANY
    • VILLAGE GHODBUNDER
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700045229
  • ReraGenie IDRG-MH-52456

Builder

  • NameSeven Eleven Construction Pvt Ltd
  • Entity typeCompany
  • Managing DirectorSanjay Sakharam Surve
  • DirectorPrashant Narayan Keluskar
  • Other registrations3 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredMay 2022PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 May 2022
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings4 building records
  • Documents filed49 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A5NA230000
A6NA230000
A7NA80000
C5NA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 5 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Excavation, at 0%.

A50%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A60%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A70%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C50%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes20%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed4

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots4
Closed/Covered4
BuildingClosed/CoveredTotal
A511
A611
A711
C511

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area18,300 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI12826.43
Proposed, not sanctioned12,826 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKASTURI PARK BHAYANDER EAST

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTEJ
EngineerPROTECH CONSULTANTS
Chartered AccountantrRASHMI AGRAWAL
PartnerRole in project
Seven Eleven Construction Pvt Ltd-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000408544SWAPNA JAYA PUTHRANSEVEN ELEVEN CONSTRUCTIONS PVT. LTD.21/12/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed49

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form-I Architect Certificate.pdf5 May 2026
Form 2File: Form 2 Phase III Nx.pdf5 May 2026
Form 3File: Form III Phase-III NX (2).pdf5 May 2026
Disclosure of Sold and Booked InventoryFile: Form III Phase-III NX (2).pdf5 May 2026
Form 1File: Form 1 III NX.pdf21 Jan 2026
Form 2File: Form 3 III NX.pdf21 Jan 2026
Form 3File: Form 2 III NX.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold Inventory Man mandir.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD IIINX_1MB.pdf10 Oct 2025
Form 1File: ARCHITECT_1MB_IIINX.pdf10 Oct 2025
Form 2File: ENGINEER III NX_1MB.pdf10 Oct 2025
Form 3File: FORM 3 III NX_1_MB.pdf10 Oct 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE III NX.pdf26 Jul 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE III NX.pdf26 Jul 2025
Form 3File: FORM 3_CA_CERTIFICATE_PHASE III NX.pdf26 Jul 2025
Disclosure of Sold and Booked InventoryFile: PHASE III NX DISCLOUSER LIST.pdf26 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PHASE III NX ENGINEER CERFICATE.pdf31 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Apna ghar phase III NX.pdf4 May 2022
Copy of the legal title reportFile: 137_5 AND 137_6.pdf3 May 2022
Copy of the legal title reportFile: 137_7.pdf3 May 2022
Copy of the legal title reportFile: 137_4.pdf3 May 2022
Copy of the legal title reportFile: 137_8.pdf3 May 2022
Copy of the legal title reportFile: 141_2.pdf3 May 2022
Copy of the legal title reportFile: 141_3.pdf3 May 2022
Copy of the legal title reportFile: 142_1.pdf3 May 2022
Copy of the legal title reportFile: 142_3.pdf3 May 2022
Copy of the legal title reportFile: 142_6.pdf3 May 2022
Copy of the legal title reportFile: 142_5 AND 143_3.pdf3 May 2022
Copy of the legal title reportFile: 143_2.pdf3 May 2022
Copy of the legal title reportFile: 143_6.pdf3 May 2022
Copy of the legal title reportFile: 222_3.pdf3 May 2022
Layout approvalFile: LAYOUT.pdf29 Apr 2022
Building plan approvalFile: A5.pdf29 Apr 2022
Building plan approvalFile: A6.pdf29 Apr 2022
Building plan approvalFile: A7 AND C5.pdf29 Apr 2022
PAN CardFile: 711 const-pan card.pdf29 Apr 2022
Details of encumbrancesFile: DETAILS OF ENCUMBRANCES.pdf29 Apr 2022
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf29 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: A5.pdf29 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: A6.pdf29 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: A7 AND C5.pdf29 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: PHASE III CC.pdf29 Apr 2022
Declaration about Commencement CertificateFile: DECLARATION CC PHASE III NX.pdf29 Apr 2022
Declaration in FORM BFile: FORM B PHASE III NX.pdf29 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE PHASE III NX.pdf29 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE PHASE III NX.pdf29 Apr 2022
CERSAI detailsFile: APNA GHAR PHASE III CERSAI.pdf29 Apr 2022
Proforma of Allotment letterFile: ALLOTMENT LETTER_III_NX.pdf29 Apr 2022
Proforma of Allotment letterFile: Agreement Apna Ghar Phase-3 nx_Final.pdf29 Apr 2022

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep APNA GHAR PHASE III NX on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VILLAGE GHODBUNDER7,600+ in Thane

2 kmAPNA GHAR PHASE III NXCompleted 85Lapsed / revoked 62Other 71Dot size: filed unitsN

Filed coordinates, straight-line distance. 218 registered projects within 2 km.

Builder: Seven Eleven Construction Pvt Ltd

Seven Eleven Construction Pvt Ltd has 4 registrations on MahaRERA, including APNA GHAR PHASE II NX and APNA GHAR PHASE III NX. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if APNA GHAR PHASE III NX is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of APNA GHAR PHASE III NX?

The registered promoter entity is Seven Eleven Construction Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in APNA GHAR PHASE III NX?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against APNA GHAR PHASE III NX?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for APNA GHAR PHASE III NX?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at APNA GHAR PHASE III NX?

The professionals named in the filing: Architect: TEJ; Engineer: PROTECH CONSULTANTS; Chartered Accountant: rRASHMI AGRAWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in APNA GHAR PHASE III NX?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About APNA GHAR PHASE III NX. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save APNA GHAR PHASE III NX to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.