Registered No litigation declared Commercial project

ANVI BUSINESS PARK

By G K GROUP

RG-MH-21422 · RERA P52100029788 · Last updated on MahaRERA portal: 1 Mar 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 48 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 48 months from the original
8 of 11Construction stages donefurthest along: Basement (if any), 0%
3 of 8Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

ANVI BUSINESS PARK is a Commercial project by G K GROUP in Pune, Maharashtra, registered with MahaRERA as P52100029788 on 4 Jul 2021. Possession is promised by 31 Dec 2026. The completion date has moved by 48 months from the original filing. 5 of the 8 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameANVI BUSINESS PARK
  • TypeCommercial
  • Location
    • S. NO. 32/16/17 NEAR ZEAL COLLEGE
    • NARHE
    • Haveli
    • Pune
    • 411041
  • Pincode411041
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100029788
  • ReraGenie IDRG-MH-21422

Builder

  • NameG K GROUP
  • Entity typePartnership
  • PartnersSWAPNIL KISHOR GORE, SHUBHAM SHANKARRAO KUDALE

Key dates

this monthRegisteredJul 2021First promiseDec 2022Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Jul 2021
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2022)
  • Buildings1 building record
  • Documents filed66 files

Current status

62%5 of 8 units booked

Figures as on 1 Mar 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANVI BUSINESS PARKNA44088

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

ANVI BUSINESS PARK: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 1 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes95%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed4

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots4
Open Space4

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area670 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
CHANDRAKALA DADASAHEB KUTENARHEPune

Approvals and building plan

Sanctioning authorityPMRDA
Permissible FSI446.3
Proposed, not sanctioned446 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTANDALE TOWER SADASHIV PETH PUNE 411030

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR SHRINIVAS KADKOL
EngineerSANTOSH PATIL
EngineerRATHI GROUP
Chartered AccountantCA ABHIJIT KHADE AND ASSOCIATES
PartnerRole in project
G K GROUP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100018906Dec 2022 → Dec 2026

Reason as filed by the promoterWe have a is delay for completing of construction work of said project for some technical issues & pending some development and construction finishing work due to financial and technical problem.

EXT52100013192Dec 2022 → Dec 2023

Reason as filed by the promoterWe have a is delay for completion of said project for some technical issues & pending some development and construction finishing work due to covid-19. Sir, We already applied for an extension of the said project on 22.12.2022 through Application Number EXT52100013192. Thereafter under scrutiny a query was raised on 03.01.2023 with the reason for some information missing. Thenafter we have updated all tasks/activities & uploaded all the necessary documents and re-submitted said application on 11.01.2023. But, Now today, we once again received a scrutiny query for the following reason : Officia

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jun 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CERTIFICATE JAN-MAR 24 Signed.pdf1 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CERTIFICATE APR-JUN 24 Signed.pdf1 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CERTIFICATE JUL-SEPT 24 Signed.pdf1 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CERTIFICATE OCT-DEC 24 Signed.pdf1 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 CERTIFICATE FY 2023-24 Signed.pdf1 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 03 ARCHITECT FORM 1 JUL-SEP 2024.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 04 ARCHITECT FORM 1 OCT-DEC 2024.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 01 ENGINEER FORM 2 JAN-MAR 24.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 02 ENGINEER FORM 2 APR-JUN 24.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 ENGINEER FORM 2 JUL-SEP 24.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 04 ENGINEER FORM 2 OCT-DEC 24.pdf19 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ENGINEER FORM 2A FY 23-24.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT FORM 1 JAN-MAR 2024 QTR.pdf14 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT FORM 1 APR-JUN 2024 QTR.pdf14 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3rd Form 1 Architect Certificate.pdf5 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3rd Form 2 Engineer Certificate.pdf5 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Engineer Certificate FY 22-23.pdf5 Mar 2024
Disclosure of sold/ booked inventoryFile: Details of Sold Unsold Inventory.pdf5 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA.pdf5 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Annual Report CA FY 22-23.pdf5 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3rd Architect Certificate Form.pdf2 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2nd Form 2A Certificate GK Group FY 22-23.pdf25 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report.pdf25 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: GK GROUP BS PL.pdf25 Jan 2024
Deviation Report with respect to Allotment letterFile: Declaration Deviation Report_Allotment letter.pdf25 Jan 2024
Deviation Report with respect to model copy of AgreementFile: Declaration Deviation report _Agreement to sale.pdf25 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about seperate bank account maharera.pdf30 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Declaration about NA Form 2A and Form 5.pdf16 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Declaration about NA Form 2A and Form 5.pdf16 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Declaration about NA Form 2A and Form 5.pdf16 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Declaration about NA Form 2A and Form 5.pdf16 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Declaration about NA Form 2A and Form 5.pdf16 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Declaration about NA Form 2A and Form 5.pdf16 Jan 2023
Building plan approvalFile: Revised PLAN COPY 080921.pdf11 Jan 2023
Layout approvalFile: Revised PLAN COPY 080921.pdf11 Jan 2023
Copy of Layout Approval (in case of layout)File: Revised PLAN COPY 080921.pdf11 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Revised PLAN COPY 080921.pdf11 Jan 2023
Declaration about Commencement CertificateFile: 2nd Declaration about Commencement Certificate.pdf11 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Rera Certificate-100421.pdf11 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2nd Architect Certificate FORM 1.pdf11 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2nd Engineer Certificate FORM 2.pdf11 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineer Certificate QA FORM 2A.pdf11 Jan 2023
Disclosure of sold/ booked inventoryFile: 1 Disclosure of sold booked inventory.pdf11 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2nd CA Certificate FORM 3.pdf11 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Desclosure interest other maharera.pdf11 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 1st Annual Report by CA FORM 5.pdf11 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: INCOME TAX ITR BS AND PL FY 21-22.pdf11 Jan 2023
Details of encumbrances concerned to FinanceFile: details of emcumbrance.pdf3 Jan 2023
Details of encumbrances concerned to LegalFile: details of emcumbrance.pdf3 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: copy of permission letter.pdf3 Jan 2023
Declaration about Commencement CertificateFile: copy of permission letter.pdf3 Jan 2023
Proforma of Agreement for saleFile: Proforma Agreement to sale draft.pdf3 Jan 2023
Copy of the legal title reportFile: Legal Search Report.pdf22 Jun 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_GK.pdf22 Jun 2021
Proforma of Allotment letterFile: Proforma Draft Allotment Letter_GK Group.pdf22 Jun 2021
Declaration about Commencement CertificateFile: Declaration about commencemnt.pdf21 Jun 2021
Details of encumbrancesFile: details of emcumbrance.pdf19 Jun 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1st Engineer Certificate of GK Group (Anvi Business Park) (10-04-2021).pdf29 May 2021
Layout approvalFile: Building Approved Plan_GK - Layout.pdf27 May 2021
Copy of Layout Approval (in case of layout)File: Building Approved Plan_GK - Layout.pdf27 May 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Rera_GK Group.pdf27 May 2021
Proforma of Allotment letterFile: Proforma Agreement to sale draft.pdf27 May 2021
Building plan approvalFile: Building Approved Plan_GK.pdf13 May 2021
PAN CardFile: PAN CARD_GK GROUP.pdf13 May 2021
Building Plan Approval / NA Order for plotted developmentFile: Building Approved Plan_GK.pdf13 May 2021
Declaration in FORM BFile: Affidavit Declaration form B.pdf13 May 2021

How this compares with Pune

62%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 48 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ANVI BUSINESS PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NARHE13,700+ in Pune

2 kmANVI BUSINESS PARKCompleted 62Lapsed / revoked 32Other 54Dot size: filed unitsN

Filed coordinates, straight-line distance. 148 registered projects within 2 km.

Builder: G K GROUP

G K GROUP has 1 registration on MahaRERA, including ANVI BUSINESS PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ANVI BUSINESS PARK is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ANVI BUSINESS PARK?

The registered promoter entity is G K GROUP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ANVI BUSINESS PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ANVI BUSINESS PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ANVI BUSINESS PARK?

The professionals named in the filing: Architect: AR SHRINIVAS KADKOL; Engineer: SANTOSH PATIL; Engineer: RATHI GROUP; Chartered Accountant: CA ABHIJIT KHADE AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ANVI BUSINESS PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANVI BUSINESS PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANVI BUSINESS PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.