Home / Browse projects / Mumbai City, Maharashtra / ANVAYA
ANVAYA
RG-MH-12339 · RERA P51900003676 · Last updated on MahaRERA portal: 7 Apr 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 23 months past the filed date
- Completion date moved by 52 months
- 4 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ANVAYA is a Others project by KUMAR MATUNGA PROJECT LLP in Mumbai City, Maharashtra, registered with MahaRERA as P51900003676 on 6 Aug 2017. Possession was promised by 13 Nov 2024 and is now 23 months past that date. The completion date has moved by 52 months from the original filing. 13 of the 23 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.
At a glance
Project
- NameANVAYA
- TypeOthers
- Location
- Rajkamal Road
- Parel
- Mumbai City
- 400019
- Pincode400019
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900003676
- ReraGenie IDRG-MH-12339
Builder
- NameKUMAR MATUNGA PROJECT LLP
- Entity typePartnership
- PartnersALPA VIPUL NAGDA, NEELA PARESH DEDHIA, JAYESH SHANTILAL DEDHIA
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on6 Aug 2017
- Promised completion13 Nov 2024
- Revised completionRevised to 13 Nov 2024 (originally 30 Jul 2020)
- Buildings1 building record
- Documents filed72 files
Current status
Figures as on 7 Apr 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ANVAYA | NA | 28 | 19 | 22 | 1 | 23 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 7 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
ANVAYA: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities17
As on 7 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
| COMMUNITY BUILDING | No | Not applicable |
| OPEN PARKING | No | Not applicable |
Parking filed39
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PANDURANG N BHOBE |
| Engineer | Siddhesh Lad |
| Chartered Accountant | Swapnesh and Vinit |
| Partner | Role in project |
|---|---|
| KUMAR MATUNGA PROJECT LLP | - |
Extensions applied for4
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe said project was registered on 06/08/2017 for completion upto 31st July 2019. During the tenure of the project many unexpected hurdles arose which extended the proceedings a bit. Some of the hurdles causing the extension are: 1. Delay in approvals and permissions from regulators 2. Also due to rains, forcemajeure conditions and unexpected events- COVID19 situation occurring during the period work further got delayed 3. Unexpected Financial Conditions 4. Delay in Loan processing by customers (their banks and financials Institutions), etc For the purpose of Extension, we hereby attach resolu
Reason as filed by the promoterConstruction work is 100% complete. We have applied for Occupation Certificate and fire NoC.
Reason as filed by the promoterSome of the hurdles causing extension 1. Delay is processing for NoC from SWM Department (Divsion of MCGM) in May 2018 as department was unaware about the new online procedure. Plus the new online procedure was having some flaws and bugs causing delay in processing from our side and department side too. Without this NoC we cannot carry out construction work. 2. Renewal of NoC from SWM Department (Divsion of MCGM) for SWM is due on May 2019 however we are unable to get it till date due to online system problems. Without this NoC we cannot carry out construction work. 3. Delay due to dealing wit
Reason as filed by the promoterGetting Occupancy Certificate took time from the respective department. Already recived Full OC dated 13/11/2024.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed72
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 FY 2024-2025 13-11-24.pdf | 7 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: 04- Discloure of Sold 13-11-2024.pdf | 7 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A FY 21-22.pdf | 7 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 22-23.pdf | 7 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 23-24.pdf | 7 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 SIGNED final 24-25.pdf | 7 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 FY 2023-2024.pdf | 1 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 FY 2024-2025 Q1.pdf | 1 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 FY 2024-2025 Q2.pdf | 1 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 FY 2022-2023.pdf | 1 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 Q4 FY 23-24 (Kumar Matunga ) SG.pdf | 1 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 Q1 FY 24-25 (Kumar Matunga ) SG.pdf | 1 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 Q2 FY 24-25 (Kumar Matunga ) SG.pdf | 1 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 Q4 FY 23-24 (Kumar Matunga ) SG.pdf | 1 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 Q1 FY 24-25 (Kumar Matunga ) SG.pdf | 1 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 Q2 FY 24-25 (Kumar Matunga ) SG.pdf | 1 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 as on 13-11-2024 FY 24-25 (Kumar Matunga ) SG.pdf | 1 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 FY 2020-21.pdf | 1 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 FY 2024-2025 Final 13-11-24.pdf | 1 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 FY 2024-2025 Q2.pdf | 1 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 FY 2024-2025 Q1.pdf | 1 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 FY 2023-2024.pdf | 1 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 3 Q4 FY 23-24 (Kumar Matunga ) SG.pdf | 1 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 FY 22-23 KMPLLP.pdf | 1 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 FY 21-22 KMPLLP.pdf | 1 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 FY 19-20.pdf | 1 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 FY 2018-19.pdf | 1 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: 01-Disclosure of Sold 31-03-2024.pdf | 1 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: 02-Disclosure of Sold 30-06-2024.pdf | 1 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: 03-Disclosure of Sold 30-09-2024.pdf | 1 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5_SIGNED Anvaya.pdf | 1 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 23-24_SIGNED 23-24.pdf | 1 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 Kumar Matunga Signed Final.pdf | 2 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Disclodure of Sold 31Mar2023.pdf | 2 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Kumar Matunga Project LLP form 5.pdf | 23 Jan 2024 |
| Details of encumbrancesFile: Encumbrance finance_compressed.pdf | 1 Sep 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2019-20- 2A Quality Assurance.pdf | 1 Sep 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2020-21- 2A Quality Assurance.pdf | 1 Sep 2022 |
| CERSAI detailsFile: CERSAI Final.pdf | 1 Sep 2022 |
| Certificates of CA (Form 3)File: Form 3- Signed_compressed.pdf | 1 Sep 2022 |
| Details of encumbrances concerned to LegalFile: Declration encumbrance.pdf | 29 Aug 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 29 Aug 2022 |
| Declaration about Commencement CertificateFile: Declaration about cc.pdf | 29 Aug 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31-03-2022- Form 1 (Architect Certificate).pdf | 29 Aug 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30-05-2022- Form 1 (Architect Certificate).pdf | 29 Aug 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold.pdf | 29 Aug 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration of seprate bank account.pdf | 29 Aug 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf | 10 Aug 2022 |
| Disclosure of sold/ booked inventoryFile: (DISCLOSURE OF SOLD)- ANVAYA.pdf | 17 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5- Anvaya- 19-20_signed.pdf | 17 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5- Anvaya_SIGNED.pdf | 22 Oct 2020 |
| Certificates of CA (Form 5)File: kumar matunga project llp- form no 5.pdf | 23 Jan 2019 |
| Building plan approvalFile: 2 ANVAYA IOD Certified Copy.pdf | 29 Jul 2017 |
| Layout approvalFile: 6 Layout Approval.PDF | 29 Jul 2017 |
| Details of encumbrancesFile: 5 No Encumbrances Certificate.PDF | 29 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: 6 Layout Approval.PDF | 29 Jul 2017 |
| Building Plan Approval (IOD)File: 2 ANVAYA IOD Certified Copy.pdf | 29 Jul 2017 |
| Declaration in FORM BFile: 7 FORM B AFFIDAVIT CUM DECLARATION.pdf | 29 Jul 2017 |
| Declaration in FORM BFile: Development Agreement-KMPL compressed 1 to 60.pdf | 29 Jul 2017 |
| Declaration in FORM BFile: Development Agreement KMPL compressed 61 to 123.pdf | 29 Jul 2017 |
| Declaration in FORM BFile: Development Agreement KMPL compressed 124 to 246 1 to 60.pdf | 29 Jul 2017 |
| Declaration in FORM BFile: Development Agreement KMPL compressed 124 246 61 123.pdf | 29 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 8 FORM 1 ARCHITECTS Certificate.pdf | 29 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 9 ARCHITECTS area statement.pdf | 29 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: vishal.pdf | 29 Jul 2017 |
| Certificates of CA (Form 3)File: CA CERTI VISHAL.pdf | 29 Jul 2017 |
| Proforma of Allotment letterFile: 15 DECLARATION Allotment Letter Agreement for Sale.pdf | 29 Jul 2017 |
| Building plan approvalFile: Anvaya PLAN.pdf | 21 Jul 2017 |
| PAN CardFile: PAN - Kumar Matunga Project LLP.PDF | 21 Jul 2017 |
| Copy of the legal title reportFile: Title Certificate - ANVAYA.PDF | 21 Jul 2017 |
| Building Plan Approval (IOD)File: Anvaya PLAN.pdf | 21 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: Anvaya C C Certified Copy.PDF | 21 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai City
Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 72 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep ANVAYA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Parel780+ in Mumbai City
Filed coordinates, straight-line distance. 237 registered projects within 2 km.
CODENAME MATUNGA ORIGINS
J. P. INFRA (MUMBAI) PRIVATE LIMITED
SHANTI HEIGHTS
Vipul Shantilal Nagda HUF
Balkrishna Hills
Oriental Contractors Private Limited
VERVE MANSION
SHANTI SIDDHI INFRA LLP
PRINCECARE AMARAA
PRINCECARE AMARAA LLP
Godrej Five Gardens
Godrej Projects Development Ltd.
See every Mumbai City project, with the district possession charts
Builder: KUMAR MATUNGA PROJECT LLP
KUMAR MATUNGA PROJECT LLP has 1 registration on MahaRERA, including ANVAYA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.
Frequently asked questions
What does it mean that ANVAYA shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if ANVAYA is delayed beyond 13 Nov 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ANVAYA?
The registered promoter entity is KUMAR MATUNGA PROJECT LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ANVAYA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ANVAYA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ANVAYA?
The professionals named in the filing: Architect: PANDURANG N BHOBE; Engineer: Siddhesh Lad; Chartered Accountant: Swapnesh and Vinit. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ANVAYA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback