Home / Browse projects / Pune, Maharashtra / ANUTHAM PHASE II

Registered No litigation declared Others project

ANUTHAM PHASE II

By ACE CONSTRUCTIONS

RG-MH-04929 · RERA P52100020764 · Last updated on MahaRERA portal: 18 Sep 2026

Source: official MahaRERA filing

Red flags

  • 17 complaints at MahaRERA
  • Completion date moved by 37 months
  • 4 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jan 2027Possession promisedmoved 37 months from the original
18 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
13 of 188Units unsoldnot recorded sold or booked
17Complaints at MahaRERAon this registration
Jump to the 143 documents Report an error

ANUTHAM PHASE II is a Others project by ACE CONSTRUCTIONS in Pune, Maharashtra, registered with MahaRERA as P52100020764 on 8 May 2019. Possession is promised by 30 Jan 2027. The completion date has moved by 37 months from the original filing. 175 of the 188 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete. 17 complaints are on record with the regulator.

At a glance

Project

  • NameANUTHAM PHASE II
  • TypeOthers
  • Location
    • PUNE SOLAPUR ROAD
    • HADAPSAR
    • Haveli
    • Pune
    • 411028
  • Pincode411028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100020764
  • ReraGenie IDRG-MH-04929

Builder

  • NameACE CONSTRUCTIONS
  • Entity typePartnership
  • PartnersNILESH POPATLAL GADA, POPATLAL HIRJI SHAH
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredMay 2019First promiseDec 2023Revised toJan 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 May 2019
  • Promised completion30 Jan 2027
  • Revised completionRevised to 30 Jan 2027 (originally 30 Dec 2023)
  • Buildings2 building records
  • Documents filed143 files

Current status

93%175 of 188 units booked
94.4%Work done, per cost certificate

Figures as on 18 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B1NA240000
ANA252116523188

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 18 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

B182%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 18 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes100%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed192

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots192
Closed/Covered2
Open Space190
BuildingClosed/CoveredOpen SpaceTotal
B1202
A0190190

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,620 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Sep 2025

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI20087.27
Proposed, not sanctioned20,087 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSuhrud 28, Gulabnagar, Dhankavadi, Pune 411043
Estimated costRs 62.64 cr
Cost incurredRs 59.14 cr
Work done94.41%
BuildingWingEstimatedIncurred
ANARs 60.00 crRs 59.14 cr
-NARs 2.64 cr-

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectELEMENT FIVE Jaideep Deshpande
ArchitectElement 5
EngineerPURUSHOTTAM DIMBLE
EngineerAkhil Shaikh
EngineerSahil Devkar
Chartered AccountantCA Paresh P. Sabadra
Chartered AccountantRSPH & Associates
Chartered AccountantShah Khandelwal Jain and Associates
PartnerRole in project
ACE CONSTRUCTIONS-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100011854Dec 2023 → Dec 2024

Reason as filed by the promoterDue to COVID-19 pandemic, the regular flow of work is hampered on account of unavailability of labour on regular basis

EXT52100024393Dec 2023 → Jun 2025

Reason as filed by the promoterThe Project is delayed due to interruption in Construction work on regular basis due to labour shortage & shortage of sand & forsee impact of upcoming vidhansabha election of Maharashtra.

EA02062621197Dec 2023 → Sep 2026

Reason as filed by the promoter1. We have obtained full occupancy certificate from Pune Municipal Corporation dated 25/06/2025 for Building A. 2. We have to apply for correction to remove Building B1, which is not related to project “Anutham Phase II,” and thereafter proceed with the completion update. Therefore, we are applying for an extension of the project completion date until 30/09/2026. 3. The photographs showing the present status of the project are enclosed herewith.

P52100020764/WarDec 2023 → Jan 2027

Reason as filed by the promoterNA

Complaints filed with MahaRERA17

Case no.ComplainantRespondentFiled
CC005000000471185NIlesh Popatlal GadaReshma Vijay Gvhane27/06/2024
CC005000000471190NIlesh Popatlal GadaVijay Dattatray Gavhane28/06/2024
CC12400194Dr Snehal Sagar SalviACE CONSTRUCTIONS23/09/2024
CC12400313ACE CONSTRUCTIONSNeha Rajendra Hole03/10/2024
CC12400314ACE CONSTRUCTIONSGhananil Mahadeo Diwate03/10/2024
CC12600151GHANANIL MAHADEO DIWATEACE CONSTRUCTIONS09/01/2026
CC12504692SUJAY VISHWAS DESAWALEACE CONSTRUCTIONS30/12/2025
CC12504537Bhagyashree Sanjay DeshmukhACE CONSTRUCTIONS19/12/2025
CC12600303VIJAYSINGH BHIMSINGH PATILACE CONSTRUCTIONS16/01/2026
CC12601295HARISH DASHRATH SURWASEACE CONSTRUCTIONS10/03/2026
CC12601769Vaibhav Shrirang ChoramaleACE CONSTRUCTIONS27/03/2026
CC12601637PANKAJ SAMBHAJI GUJARACE CONSTRUCTIONS23/03/2026
CC12601636SUNIL RAJARAM DHATRAKACE CONSTRUCTIONS23/03/2026
CC12602297HANUMANTU VABAYYA TALARACE CONSTRUCTIONS18/04/2026
CC12602481YADAV ROSHAN BAHADUR SINGHACE CONSTRUCTIONS28/04/2026
CC12605487ARATI BALAJI JADHAVACE CONSTRUCTIONS25/08/2026
CC12604401sambhaji bhaguji modakACE CONSTRUCTIONS15/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 May 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 May 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Sep 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jan 2027

Documents filed143

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 143 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: AR june 25.pdf18 Sep 2026
Withdrawal Update Form 1File: AR june 25.pdf18 Sep 2026
Withdrawal Update Form 1File: AR june 25.pdf18 Sep 2026
Withdrawal Update Form 1File: AR june 25.pdf18 Sep 2026
Withdrawal Update Form 2File: ER june 25.pdf18 Sep 2026
Withdrawal Update Form 2File: ER june 25.pdf18 Sep 2026
Withdrawal Update Form 2File: ER june 25.pdf18 Sep 2026
Withdrawal Update Form 2File: ER june 25.pdf18 Sep 2026
Withdrawal Update Form 3File: CA june 25 final.pdf18 Sep 2026
Withdrawal Update Form 3File: CA june 25 final.pdf18 Sep 2026
Withdrawal Update Form 3File: CA june 25 final.pdf18 Sep 2026
Withdrawal Update Form 3File: CA june 25 final.pdf18 Sep 2026
Form 2A (FY 2019-2020)File: Form 2A- march 20.pdf4 Jun 2026
Form 2A (FY 2020-2021)File: Form 2A- march 21.pdf4 Jun 2026
Form 2A (FY 2021-2022)File: Form 2A- march 22.pdf4 Jun 2026
Form 2A (FY 2022-2023)File: Form 2A- march 22.pdf4 Jun 2026
Form 2A (FY 2023-2024)File: Form 2A- march 24.pdf4 Jun 2026
Form 2A (FY 2024-2025)File: Form 2A- march 25.pdf4 Jun 2026
Form 2A (FY 2025-2026)File: Form 2A- march 26.pdf4 Jun 2026
Form 2A (FY 2024-2025)File: Form 2A- march 25.pdf4 Jun 2026
Form 2A (FY 2025-2026)File: Form 2A- march 26.pdf4 Jun 2026
Form 5 (FY 2024-2025)File: Rera Audit Report -2024-25.pdf3 Jan 2026
Withdrawal Update Form 1File: AR june 25.pdf12 Dec 2025
Withdrawal Update Form 2File: ER june 25.pdf12 Dec 2025
Withdrawal Update Form 3File: CA june 25 final.pdf12 Dec 2025
Form 1File: AR JUNE 24.pdf26 Sep 2025
Form 2File: Enggi Certificate jun 24.pdf26 Sep 2025
Form 3File: CA Cert-Autham Phase II _June 24 Final.pdf26 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory jun 24.pdf26 Sep 2025
Form 1File: Architect Certificet sept 24.pdf26 Sep 2025
Form 2File: Engg Certificate 30092024 Anutham Phase II.pdf26 Sep 2025
Form 3File: Final CA Cert-Autham Phase II Sept 24.pdf26 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory- Anutham Phase II.pdf26 Sep 2025
Form 5 (FY 2023-2024)File: Form 5 -Autham Phase II 2023-24.pdf26 Sep 2025
Form 1File: AR june 25.pdf12 Sep 2025
Form 2File: ER june 25.pdf12 Sep 2025
Form 3File: CA june 25 final.pdf12 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold - anutham phase 2.pdf12 Sep 2025
Form 1File: 1-Architect Certificate-Dec-24.pdf9 Jul 2025
Form 2File: 2-Engineer Certificate-Dec-24.pdf9 Jul 2025
Form 3File: 3-CA Certificate-Dec-24 final.pdf9 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory- Anutham Phase II.pdf9 Jul 2025
Form 1File: 1-Architect Certificate-March-25.pdf9 Jul 2025
Form 2File: 2-Engineer Certificate.pdf9 Jul 2025
Form 3File: 3-Final CA Certificate-March-25.pdf9 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory- Anutham Phase.pdf9 Jul 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory- Anutham Phase II.pdf17 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificet sept 24.pdf12 Apr 2025
Certificates of CA (Form 3)File: Final CA Cert-Autham Phase II Sept 24.pdf12 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate 30092024 Anutham Phase II.pdf12 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR JUNE .pdf5 Nov 2024
Certificates of CA (Form 3)File: CA Cert-Autham Phase II _June 24 Final.pdf5 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enggi Certificate.pdf5 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory- Anutham Phase II.pdf21 Oct 2024
Declaration in FORM BFile: Form B.pdf19 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory- Anutham Phase II.pdf18 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CA Cert-Autham Phase II _March 24.pdf21 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR Cert-Autham Phase II _March 24.pdf21 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Cert-Autham Phase II _March 24.pdf21 May 2024
Certificates of CA (Form 3)File: CA Cert-Autham Phase II _March 24.pdf21 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory- Anutham Phase II.pdf23 Apr 2024
Other - TechnicalFile: Form 2A - Anutham Phase II.pdf23 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: ANUTHAM PHASE II 21-22.pdf6 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: ANUTHAM PHASE II 22-23.pdf6 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR Cer-Dec23.pdf2 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate Dec23.pdf2 Mar 2024
Certificates of CA (Form 3)File: CA Certificate-Autham Phase II -Dec 23.pdf2 Mar 2024
Details of encumbrances concerned to FinanceFile: NO DUE CERTIFICATE INDIAN BANK.pdf21 Feb 2024
Details of encumbrancesFile: NO DUE CERTIFICATE INDIAN BANK.pdf21 Feb 2024
Details of encumbrances concerned to LegalFile: NO DUE CERTIFICATE INDIAN BANK.pdf21 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclouser.pdf16 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2A 2020.pdf16 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2A 2021.pdf16 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A 2022.pdf16 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A 2023.pdf16 Nov 2023
Disclosure of sold/ booked inventoryFile: Sold Booked.pdf16 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf10 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-31 10 2023.pdf10 Nov 2023
Certificates of CA (Form 3)File: CA Certificate _digital Signed.pdf10 Nov 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory- Anutham Phase.pdf6 Oct 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
VAARAHIGOKUL NAGAR KATRAJ KONDHWA PUNE - 41104873CompletedMar 2015Late, Sep 2015

How this compares with Pune

93%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 37 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ANUTHAM PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near HADAPSAR13,700+ in Pune

2 kmANUTHAM PHASE IICompleted 31Lapsed / revoked 15Other 37Dot size: filed unitsN

Filed coordinates, straight-line distance. 83 registered projects within 2 km.

Builder: ACE CONSTRUCTIONS

ACE CONSTRUCTIONS has 2 registrations on MahaRERA, including ANUTHAM PHASE 1 and ANUTHAM PHASE II. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ANUTHAM PHASE II is delayed beyond 30 Jan 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ANUTHAM PHASE II?

The registered promoter entity is ACE CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ANUTHAM PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ANUTHAM PHASE II?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ANUTHAM PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ANUTHAM PHASE II?

The professionals named in the filing: Architect: ELEMENT FIVE Jaideep Deshpande; Architect: Element 5; Engineer: PURUSHOTTAM DIMBLE; Engineer: Akhil Shaikh; Engineer: Sahil Devkar; Chartered Accountant: CA Paresh P. Sabadra. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ANUTHAM PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANUTHAM PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANUTHAM PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.