Registered No litigation declared Residential / Group Housing project

Anupam Apartment

By Aahan Builders Through Aniruddha Mukund Kulkarni

RG-MH-85439 · RERA P52100053061 · Last updated on MahaRERA portal: 9 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 16 months
  • 1 extension taken
  • Rs 2.12 crore secured on the land, in favour of BANK OF INDIA

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 16 months from the original
9 of 11Construction stages donefurthest along: Basement (if any), 0%
16 of 21Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 108 documents Report an error

Anupam Apartment is a Residential / Group Housing project by Aahan Builders Through Aniruddha Mukund Kulkarni in Pune, Maharashtra, registered with MahaRERA as P52100053061 on 12 Oct 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 16 months from the original filing. 5 of the 21 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameAnupam Apartment
  • TypeResidential / Group Housing
  • Location
    • Sr. No. 91
    • CTS No. 1077/9
    • Hissa No. 2
    • Plot No.32
    • Kothrud North
    • Pune
    • Kothrud
    • Haveli
    • 411038
  • Pincode411038
  • RERA no.P52100053061
  • ReraGenie IDRG-MH-85439

Builder

  • NameAahan Builders Through Aniruddha Mukund Kulkarni
  • Entity typeIndividual

Key dates

this monthRegisteredOct 2023First promiseAug 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Oct 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Aug 2025)
  • Buildings1 building record
  • Documents filed108 files

Current status

24%5 of 21 units booked
99.0%Work done, per cost certificate

Figures as on 9 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Anupam ApartmentNA7721021

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

Anupam Apartment: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes99%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes99%
Landscaping & Tree PlantingYes99%
Street LightingYes99%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes86%
Water conservation /Rain water harvestingYes98%
Energy managemcntYes86%
Fire protection and fire safety requirementsYes98%
Electrical meter room, sub-station, receiving stationYes99%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed15

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots15
Closed/Covered3
Open Space12

Land and ownership21

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area510 sq m
Land owned byThe promoter, with other names on the file
Named landowners21
Encumbrance on the landDeclared present
Charge in favour ofBANK OF INDIA
Secured amountRs 2.12 crore
CERSAI search filedYes
Declared on1 Dec 2025
LandownerVillageDistrict
Ramchandra Balwant JoshiKothrudPune
Maya Vinayak FadkeKothrudPune
Rajendra Devidas JoshiKothrudPune
Pallavi Rajendra JoshiKothrudPune
Rama Ramesh KerurKothrudPune
Priya Ramesh KerurKothrudPune
Sanjay Prabhakar GholapKothrudPune
Vrushali Mangesh KherKothrudPune
Mangesh Mukesh KherKothrudPune
Shital Hrushikesh TakwaneKothrudPune
Hrushikesh Rajendra TakwaneKothrudPune
Aniruddha Mukund KulkarniKothrudPune
Shamika Aniruddha KulkarniKothrudPune
Mukund Krushnaji KherKothrudPune
Prasad Dattatray KulkarniKothrudPune
Kailas D. KhadeKothrudPune
Nanda Kailas KhadeKothrudPune
Sunil Vitthal TupeKothrudPune
Mr. Ramchandra Balwant JoshiKothrudPune
Mr. Mukund Krushnaji KhairKothrudPune
Mangesh Mukund KherKothrudPune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI1131.83
Proposed, not sanctioned1,132 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKarve Nagar
Estimated costRs 8.74 cr
Cost incurredRs 8.66 cr
Work done99.04%
BuildingWingEstimatedIncurred
Anupam ApartmentNARs 8.00 crRs 8.00 cr
-NARs 74.28 lakhRs 65.88 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectIndiocorp Designs Private Limited
EngineerRohinee Engineers
Chartered AccountantS G Mundada & Co
Chartered AccountantP. R. Rathi & Associates
PartnerRole in project
Aahan Builders Through Aniruddha Mukund Kulkarni-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA03122518523Aug 2025 → Dec 2026

Reason as filed by the promoterOur project has experienced delays due to unforeseen natural disasters of excessive rains this year, which have impacted our construction timeline. Given these circumstances, we kindly request an extension of the RERA deadline to ensure that we can complete the project to the highest standards and in compliance with all regulations. We appreciate your understanding and cooperation in this matter. Please let us know the necessary steps to proceed with the extension request.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed108

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Anupam s.pdf9 Jul 2026
Withdrawal Update Form 2File: Anupam Form 2 31st Mar 26 s.pdf9 Jul 2026
Withdrawal Update Form 3File: Ms Aahan Builders Form -3 (1) (1) (1).pdf9 Jul 2026
Withdrawal Update Form 1File: Form 1.pdf9 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf9 Feb 2026
Withdrawal Update Form 3File: Form 3.pdf9 Feb 2026
Form 2A (FY 2023-2024)File: Anupam 23 - 24.pdf12 Dec 2025
Form 2A (FY 2024-2025)File: Anupam 24 - 25.pdf12 Dec 2025
Form 5 (FY 2023-2024)File: FY 23-24 (1).pdf12 Dec 2025
Form 5 (FY 2024-2025)File: FY 24-25 (2) (1).pdf12 Dec 2025
Form 1File: Form 1 s_compressed (1).pdf14 Nov 2025
Form 2File: Anupam 2nd Quarter Engineer Certificate.pdf14 Nov 2025
Form 3File: Anupam Form 3 Sept 25.pdf14 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold (1).pdf14 Nov 2025
Form 1File: Dec 2024 Anupam Apartment Form 1_compressed.pdf11 Oct 2025
Form 2File: ANUPAMA March 25 Form 2.pdf11 Oct 2025
Form 3File: Aahan BuildersForm 3 Dec 2024.pdf11 Oct 2025
Disclosure of Sold and Booked InventoryFile: Dec 24 Sold Unsold.pdf11 Oct 2025
Form 1File: Jun 2025 Anupm Apartment_compressed.pdf10 Oct 2025
Form 2File: ANUPAMA APARTMENT june 25 Form 2.pdf10 Oct 2025
Form 3File: Anupam CA Certificate Form 3..pdf10 Oct 2025
Disclosure of Sold and Booked InventoryFile: Jun 2024 Soil Unsold.pdf10 Oct 2025
Form 1File: Dec 2023 Form 1.pdf20 Aug 2025
Form 2File: Dec 2023 Form 2.pdf20 Aug 2025
Form 3File: Dec 2023 Form 3.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Dec 2023 A.pdf20 Aug 2025
Form 1File: March 2024 Form 1.pdf20 Aug 2025
Form 2File: March 2024 Form 2.pdf20 Aug 2025
Form 3File: March 2024 Form 3.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: March 2024 Sold Unsold.pdf20 Aug 2025
Form 1File: Jun 2024 Form 1.pdf20 Aug 2025
Form 2File: Jun 2024 Form 2.pdf20 Aug 2025
Form 3File: Jun 2024 Form 3 s.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Jun 24 Sold Unsold.pdf20 Aug 2025
Form 1File: Sep 2024 Form 1_compressed.pdf20 Aug 2025
Form 2File: Form 2 sep 24.pdf20 Aug 2025
Form 3File: Anupam Sept 2024 Form 3.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sep 24 Sold Unsold.pdf20 Aug 2025
Form 1File: March 2025 Form 1 s_compressed.pdf20 Aug 2025
Form 2File: Form 2 March 25.pdf20 Aug 2025
Form 3File: Anupam March 2025 Form 3.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: March 2025 A Sold Unsold.pdf20 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate of2 jan 2024.pdf13 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 june 2024.pdf13 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3.pdf13 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ANUPAM APARTMENT Dec 2024 (1).pdf13 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ANUPAM APARTMENT Dec 2024 (1).pdf13 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Anupam form 2(2) (1).pdf13 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: anupam old form 2.pdf13 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Engineer’s Certificate on 26 feb 2025.pdf13 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 Engineer’s Certificate on 31 des 2024 1.pdf13 May 2025
Disclosure of sold/ booked inventoryFile: dec mrch su.pdf13 May 2025
Disclosure of sold/ booked inventoryFile: signed sold unsold march 2024.pdf13 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 11zon_organized-PDF.pdf17 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aahan BuildersForm 3 on 07032025 (2).pdf17 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: signed F2 (1).pdf17 Mar 2025
Layout approvalFile: main layout_compressed (5).pdf15 Jan 2025
Building plan approvalFile: 2-3.pdf15 Jan 2025
Building plan approvalFile: 3-3.pdf15 Jan 2025
Copy of Layout Approval (in case of layout)File: main layout_compressed (5).pdf15 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf15 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 2-3.pdf15 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 3-3.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2) (8) (1).pdf10 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineer’s Certificate on Cost Incurred on Project (Form 2) (4).pdf10 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf3 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (9).pdf3 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1.pdf3 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3A_organized.pdf3 Jun 2024
Building plan approvalFile: HPSC0209_11zon.pdf22 Apr 2024
Building plan approvalFile: HPSC0209_11zon.pdf22 Apr 2024
Building plan approvalFile: HPSC0210_11zon.pdf22 Apr 2024
Building plan approvalFile: HPSC0211_11zon.pdf22 Apr 2024
Building plan approvalFile: HPSC0212_11zon.pdf22 Apr 2024
Building plan approvalFile: HPSC0213_11zon.pdf22 Apr 2024
Building plan approvalFile: HPSC0214_11zon.pdf22 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: HPSC0209_11zon.pdf22 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: HPSC0209_11zon.pdf22 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: HPSC0210_11zon.pdf22 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: HPSC0211_11zon.pdf22 Apr 2024

How this compares with Pune

24%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 16 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Anupam Apartment on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pune13,700+ in Pune

Builder: Aahan Builders Through Aniruddha Mukund Kulkarni

Aahan Builders Through Aniruddha Mukund Kulkarni has 1 registration on MahaRERA, including Anupam Apartment. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Anupam Apartment is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Anupam Apartment?

The registered promoter entity is Aahan Builders Through Aniruddha Mukund Kulkarni, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Anupam Apartment?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Anupam Apartment?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Anupam Apartment?

The professionals named in the filing: Architect: Indiocorp Designs Private Limited; Engineer: Rohinee Engineers; Chartered Accountant: S G Mundada & Co; Chartered Accountant: P. R. Rathi & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Anupam Apartment?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Anupam Apartment. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Anupam Apartment to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.