Home / Browse projects / Pune, Maharashtra / ANTRIKSH TOWERS 22-32

Registered No litigation declared Residential / Group Housing project

ANTRIKSH TOWERS 22-32

By AUM CITYSCAPES LLP

RG-MH-84140 · RERA P52100047488 · Last updated on MahaRERA portal: 3 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 33 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 9 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 33 months from the original
0 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
29 of 56Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 96 documents Report an error

ANTRIKSH TOWERS 22-32 is a Residential / Group Housing project by AUM CITYSCAPES LLP in Pune, Maharashtra, registered with MahaRERA as P52100047488 on 2 Nov 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 33 months from the original filing. 27 of the 56 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameANTRIKSH TOWERS 22-32
  • TypeResidential / Group Housing
  • Location
    • STATION ROAD
    • MANGALWAR PETH
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411011
  • Pincode411011
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100047488
  • ReraGenie IDRG-MH-84140

Builder

  • NameAUM CITYSCAPES LLP
  • Entity typePartnership
  • PartnersAJIT ZUMBARLAL KARNAVAT, ALPESH JASHUBHAI PATEL, SHARAD NARAYAN MOGALE
  • Other registrations1 more →
  • Declared earlier projects9 →

Key dates

this monthRegisteredNov 2022First promiseMar 2024Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Nov 2022
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Mar 2024)
  • Buildings1 building record
  • Documents filed96 files

Current status

48%27 of 56 units booked
84.8%Work done, per cost certificate

Figures as on 3 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building B-22-32NA151156056

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

Building B-22-32: 43% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 3 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes60%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes50%
Street LightingYes70%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes70%
Solid Waste Management And DisposalYes70%
Water conservation /Rain water harvestingYes70%
Energy managemcntYes50%
Fire protection and fire safety requirementsYes70%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,650 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on13 Oct 2025

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI21189.77
Proposed, not sanctioned16,936 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchViman Nagar,Pune,411014
Estimated costRs 44.76 cr
Cost incurredRs 37.96 cr
Work done84.8%
BuildingWingEstimatedIncurred
Building B-22-32NARs 44.76 crRs 37.96 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMangesh Bhandekar
EngineerKalpesh Zabak
Chartered AccountantPriyanka Chordiya
Chartered AccountantSAC & CO LLP
PartnerRole in project
AUM CITYSCAPES LLP-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100019367Mar 2024 → Mar 2025

Reason as filed by the promoterWe are nearing the completion stage as per current sanction. Now we are getting revised sanction for additional three floor very soon. Which also we are try to complete before 29.03.2025. Hence, we are applied for the extension of one year.

EXT52100025189Mar 2024 → Dec 2025

Reason as filed by the promoterConstruction of the project is ongoing but in the slow movement, as non-availability of labour in the past now we are on track to complete the project. Also there is a revision in the Development rules for Slum rehabilitation projects accordingly we are eligible for additional sanction of three floors and the permission for sanction of the same is in process, to complete the construction with additional sanction we have applied for extension application

EA25122518986Mar 2024 → Dec 2026

Reason as filed by the promoterMore than one registration is taken for a single building Construction project and to get the Completion certificate of the full Occupancy certificate project we require an extension. Construction of the project is ongoing but in the slow movement, as non-availability of labour in the past now we are on track to complete the project. Also, there is a revision in the Development rules for Slum rehabilitation projects accordingly we are eligible for additional sanction of three floors and the permission for sanction of the same is in process, to complete the construction with additional sanction

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Aug 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed96

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2022-2023)File: Form 5_ANTRIKSH TOWERS 22-32_FY 22_23.pdf3 Aug 2026
Form 5 (FY 2023-2024)File: form 5 Antriksh 22_32 31032024_compress.pdf3 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A Antariksh Tower 22 32 FY 2025 2026.pdf1 Aug 2026
Withdrawal Update Form 1File: Form 1 Antariksh Tower 22 32 as on 30062026.pdf14 Jul 2026
Withdrawal Update Form 2File: Antriksh Towers 22 32 Form 2.pdf14 Jul 2026
Withdrawal Update Form 3File: Form 3 30062026 ANTARIKSH 22 32 sign.pdf14 Jul 2026
Withdrawal Update Form 1File: FORM 1 ANTARIKSH TOWER 22_32 as on 31032026.pdf17 Apr 2026
Withdrawal Update Form 2File: Form_2 Antriksh Tower 22_32.pdf17 Apr 2026
Withdrawal Update Form 3File: Form_3 Antriksh Towers 22_32_ 31032026 sign_compressed.pdf17 Apr 2026
Withdrawal Update Form 1File: form 1 sign.pdf5 Feb 2026
Withdrawal Update Form 2File: Antriksh Towers 22 32 form 2 sign 31122025.pdf5 Feb 2026
Withdrawal Update Form 3File: Form 3 31122025 ANTARIKSH 22 32 sign.pdf5 Feb 2026
Form 2A (FY 2024-2025)File: form 2A Antriksh towers 22-32_FY24-24.pdf25 Dec 2025
Form 5 (FY 2024-2025)File: Form 5_Antriksh 22-32 FY 2024-2025 sign_compressed.pdf15 Oct 2025
Withdrawal Update Form 1File: FORM 1 ANTARIKSH TOWER 22-32 as on 30062025.pdf13 Oct 2025
Withdrawal Update Form 1File: FORM 1 ANTARIKSH TOWER 22_32 as on 30092025.pdf13 Oct 2025
Withdrawal Update Form 2File: Form 2 Antriksh Tower 22-32_sign.pdf13 Oct 2025
Withdrawal Update Form 2File: AUM CITY 22-32 FORM-2.pdf13 Oct 2025
Withdrawal Update Form 3File: Form 3 30062025 ANTARIKSH 22-32 sign_compressed.pdf13 Oct 2025
Withdrawal Update Form 3File: Form 3 30092025 ANTARIKSH 22-32_final.pdf13 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ANTARIKSH TOWER 22 32 as on 31032025.pdf12 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31032025 ANTARIKSH 22 32 sign_compressed.pdf12 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ANTARIKSH 22 32 FORM 2.pdf12 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold 31032025 2 sign.pdf12 Apr 2025
Declaration in FORM BFile: New form B Antariksh 22_32_compress.pdf1 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 ANTRIKSH TOWERS 22_32 31122024.pdf13 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Antariksh 22_32 31122024_Closing balance 0.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Antriksh 22_32.pdf13 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Antriksh 22_32 sign.pdf13 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30092024 ANTARIKSH 22_32_sign_correct page_compress.pdf23 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Antariksh towers 22_32 as on 30092024.pdf17 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30092024 ANTARIKSH 22_32_sign_compress.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ANTARIKSH 22-32 FORM 2.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold 30092024.pdf17 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 Antriksh 22_32 31032024_compress.pdf11 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold- Unsold Antriksh 22-32.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Aum Sanskruti Housing 10-07-2024.pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ANTRIKSH 22-32 30-06-2024.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Antriksh 22-32 30-06-2024_compressed.pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ANTARIKSH 22 TO 32.pdf29 May 2024
Disclosure of sold/ booked inventoryFile: ANTARIKSH 22 TO 32sold unslod Inventory 31032024.pdf28 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ANTRIKSH TOWERS 22 to32 310324.pdf27 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2a antariksh towers 22 32.pdf27 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 Antariksh 22-32 31-03-2024_compressed.pdf27 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 22-32 Format A final.pdf28 Mar 2024
Declaration in FORM BFile: Form b antariksh 22 to 32 for extension.pdf19 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 ANTARIKSH TOWERS 22 32 31122023.pdf11 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2a antariksh towers 22 to 32 fy 22 23.pdf7 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AUM CITYSCAPES LLP antariksh towers 22 32 form 2 31122023.pdf3 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold 31122023 antarisksh 22-23.pdf2 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31122023 ANTARIKSH 22 32 both signcompressed.pdf2 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold 30092023.pdf27 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ANTARIKSH TOWER 22_32 as on 31032023.pdf23 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ANTARIKSH TOWER 22_32 as on 30062023.pdf23 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ANTARIKSH TOWER 22_32 as on 30092023.pdf23 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Antriksh 22-32_compressed.pdf1 Dec 2023
Disclosure of sold/ booked inventoryFile: Antariksh Towers 22-32 disclosure sold unsold.pdf1 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30092023 antariksh 22 32 both sign.pdf1 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_ANTRIKSH TOWERS 22-32_FY 22_23.pdf31 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other real estate organisations - Sharad Narayan Mogale.pdf24 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other real estate organisations-Ajit Zumbarlal Karnawat.pdf24 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other real estate organisations-Ketan Jayantilal Veera.pdf24 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ANTARIKSH 22 32 30062023.pdf16 Aug 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold 30032023 signed final.pdf16 Aug 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold 30062023 signed.pdf16 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30032023 ANTARIKSH 2232 signed_final.pdf16 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 antriksh 2232_30062023both sign_Reduce.pdf16 Aug 2023
Other - LegalFile: Aum Cityscapes 7th LLP Agreement24032023.pdf27 Mar 2023
Declaration in FORM BFile: Form B_compressed.pdf3 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_compressed.pdf3 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2_compressed.pdf3 Oct 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEPARATE ACFormat A- Aum Cityscapes LLP-CHECK BANK Ac.pdf3 Oct 2022
Other - LegalFile: Model Draft of Agrreement to Sale.pdf17 Sep 2022
Other - LegalFile: Annexure A to Agreement to Sale Sample Format Ok.pdf17 Sep 2022
Copy of the legal title reportFile: 1 Copy of the legal title report.pdf18 Aug 2022
Layout approvalFile: HPSC0197-Layout Plan-compress.pdf1 Aug 2022
Building plan approvalFile: BUILDING PLAN FINAL_compressed.pdf1 Aug 2022
Copy of Layout Approval (in case of layout)File: HPSC0197-Layout Plan-compress.pdf1 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN FINAL_compressed.pdf1 Aug 2022
PAN CardFile: 1 PAN Card.pdf30 Jul 2022

Promoter's earlier projects9

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

9 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
THE MINTBANER19CompletedDec 2016Dec 2016
QUADRABANER4CompletedDec 2016Dec 2016
ASHIYANASHIVAJINAGAR58CompletedDec 2016Dec 2016
KESHAV SHRUSHTIRATNAGIRI73CompletedDec 2015Dec 2015
CASA IMPERIAWAKAD397CompletedJun 2014Jun 2014
SLUM REHABILITATION PROJECTBHAWANI PETH428CompletedDec 2012Dec 2012
COSMOS REGENCYBANER172CompletedMar 2012Mar 2012
CASA POLIWAKAD112CompletedDec 2011Dec 2011
LA VALE CASASR NO 20 BHAVDHAN120CompletedJan 2009Jan 2009

How this compares with Pune

48%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 33 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ANTRIKSH TOWERS 22-32 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MANGALWAR PETH13,700+ in Pune

2 kmANTRIKSH TOWERS 22-32Completed 142Lapsed / revoked 118Other 106Dot size: filed unitsN

Filed coordinates, straight-line distance. 366 registered projects within 2 km.

Builder: AUM CITYSCAPES LLP

AUM CITYSCAPES LLP has 2 registrations on MahaRERA, including ANTRIKSH TOWERS and ANTRIKSH TOWERS 22-32. Its filings disclose 9 earlier MahaRERA projects: declares 9 of 9 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ANTRIKSH TOWERS 22-32 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ANTRIKSH TOWERS 22-32?

The registered promoter entity is AUM CITYSCAPES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ANTRIKSH TOWERS 22-32?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ANTRIKSH TOWERS 22-32?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ANTRIKSH TOWERS 22-32?

The professionals named in the filing: Architect: Mangesh Bhandekar; Engineer: Kalpesh Zabak; Chartered Accountant: Priyanka Chordiya; Chartered Accountant: SAC & CO LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ANTRIKSH TOWERS 22-32?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANTRIKSH TOWERS 22-32. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANTRIKSH TOWERS 22-32 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.