Home / Browse projects / Pune, Maharashtra / ANTALYA NEXT
ANTALYA NEXT
RG-MH-05701 · RERA P52100066556 · Last updated on MahaRERA portal: 11 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ANTALYA NEXT is a Others project by Sanil Constructions LLP in Pune, Maharashtra, registered with MahaRERA as P52100066556 on 11 Jun 2024. Possession is promised by 31 Mar 2028. 82 of the 334 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete.
At a glance
Project
- NameANTALYA NEXT
- TypeOthers
- Location
- Tathawade
- Tathwade
- Mulshi
- Pune
- 411057
- Pincode411057
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100066556
- ReraGenie IDRG-MH-05701
Builder
- NameSanil Constructions LLP
- Entity typePartnership
- PartnerSANDEEP RAMDAS GOYAL
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on11 Jun 2024
- Promised completion31 Mar 2028
- Revised completionNone
- Buildings2 building records
- Documents filed157 files
Current status
Figures as on 11 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building A | NA | 22 | 20 | 144 | 30 | 174 |
| Building B | NA | 22 | 20 | 136 | 24 | 160 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 11 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 95%.
Building A57%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 65% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 35% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building B67%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 95% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 11 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed359
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Building A | 107 | 107 |
| Building B | 252 | 252 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SUNITA NEWALE | Chikhali | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Building A | NA | Rs 80.09 cr | Rs 24.54 cr |
| Building B | NA | Rs 76.71 cr | Rs 23.51 cr |
| - | NA | Rs 4.78 cr | Rs 4.82 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Space Craft Associates |
| Engineer | MR K M |
| Engineer | Dnyaneshwar Sonawne |
| Chartered Accountant | CA Harsh Julaniya |
| Chartered Accountant | Yogesh Gupta |
| Partner | Role in project |
|---|---|
| Sanil Constructions LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Apr 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Mar 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Mar 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2028
Documents filed157
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 157 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Architect Certificate Q1 FY 26-27.pdf | 11 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 Engineering Certificate Q1 FY 26-27.pdf | 11 Jul 2026 |
| Withdrawal Update Form 3File: Signed Certificate Form 3 FY 2026-27 Q1.pdf | 11 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2A FY 2025-26 Antalya Next.pdf | 29 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 Signed.pdf | 9 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate - QTR-4 2025-26.pdf | 9 Apr 2026 |
| Withdrawal Update Form 3File: CA Signed Copy of Form3.pdf | 9 Apr 2026 |
| Form 2A (FY 2024-2025)File: Signed Form 2A Certificate.pdf | 3 Apr 2026 |
| Layout approvalFile: Layout.pdf | 17 Mar 2026 |
| Building plan approvalFile: Plan 1.pdf | 17 Mar 2026 |
| Building plan approvalFile: Plan 2.pdf | 17 Mar 2026 |
| Building plan approvalFile: Plan 3.pdf | 17 Mar 2026 |
| Building plan approvalFile: Plan 4.pdf | 17 Mar 2026 |
| Building plan approvalFile: Plan 5.pdf | 17 Mar 2026 |
| Building plan approvalFile: Plan 6.PDF | 17 Mar 2026 |
| Building plan approvalFile: Plan 7.PDF | 17 Mar 2026 |
| Building plan approvalFile: Plan 8.PDF | 17 Mar 2026 |
| Building plan approvalFile: Plan 9.PDF | 17 Mar 2026 |
| Building plan approvalFile: Plan 10.PDF | 17 Mar 2026 |
| Building plan approvalFile: Plan 11.PDF | 17 Mar 2026 |
| Building plan approvalFile: Plan 12.PDF | 17 Mar 2026 |
| Building plan approvalFile: Plan 13.PDF | 17 Mar 2026 |
| Building plan approvalFile: Plan 14.PDF | 17 Mar 2026 |
| Form 5 (FY 2024-2025)File: Form 5 Sigend.pdf | 12 Mar 2026 |
| Withdrawal Update Form 1File: Architect Certificate Q3 FY25-26.pdf | 9 Feb 2026 |
| Withdrawal Update Form 2File: Sanil Engineers Certificate Q3 FY25-26.pdf | 9 Feb 2026 |
| Withdrawal Update Form 3File: CA Certificate Q3 FY 25-26.pdf | 9 Feb 2026 |
| Withdrawal Update Form 1File: Archiech Certificate.pdf | 14 Jan 2026 |
| Withdrawal Update Form 1File: Archiech Certificate.pdf | 14 Jan 2026 |
| Withdrawal Update Form 1File: Archiech Certificate.pdf | 14 Jan 2026 |
| Withdrawal Update Form 2File: Q2 FY2526 Engineers Certificate.pdf | 14 Jan 2026 |
| Withdrawal Update Form 2File: Q2 FY2526 Engineers Certificate.pdf | 14 Jan 2026 |
| Withdrawal Update Form 2File: Q2 FY2526 Engineers Certificate.pdf | 14 Jan 2026 |
| Withdrawal Update Form 3File: Q2 FY 25-26 CA Certificate signed.pdf | 14 Jan 2026 |
| Withdrawal Update Form 3File: Q2 FY 25-26 CA Certificate signed.pdf | 14 Jan 2026 |
| Withdrawal Update Form 3File: Q2 FY 25-26 CA Certificate signed.pdf | 14 Jan 2026 |
| Withdrawal Update Form 1File: Architect Certificate Q1.pdf | 8 Jan 2026 |
| Withdrawal Update Form 2File: Engineers Certificate signed u0026 Stamp Q1 FY25-26.pdf | 8 Jan 2026 |
| Withdrawal Update Form 3File: CA Certificate signed u0026 Stamp Q1 FY25-26.pdf | 8 Jan 2026 |
| Withdrawal Update Form 1File: Antalya Next Architect Certificate Q1 FY24-25.pdf | 5 Aug 2025 |
| Withdrawal Update Form 2File: Engineer Certificate For Rera Q3 FY 24-25.pdf | 5 Aug 2025 |
| Withdrawal Update Form 3File: CA Certificate.pdf | 5 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 24 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_compressed.pdf | 24 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 24 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Booked Report.pdf | 24 Apr 2025 |
| Copy of the legal title reportFile: DocScanner 8 Apr 2025 16-03-compressed.pdf | 8 Apr 2025 |
| Building plan approvalFile: 1-13_compressed (4).pdf | 6 Apr 2025 |
| Building plan approvalFile: 2-13_compressed (1).pdf | 6 Apr 2025 |
| Building plan approvalFile: 3-13_compressed.pdf | 6 Apr 2025 |
| Building plan approvalFile: 4-13_compressed.pdf | 6 Apr 2025 |
| Building plan approvalFile: 5-13_compressed.pdf | 6 Apr 2025 |
| Building plan approvalFile: 1-13_compressed (4).pdf | 6 Apr 2025 |
| Building plan approvalFile: 2-13_compressed (1).pdf | 6 Apr 2025 |
| Building plan approvalFile: 3-13_compressed.pdf | 6 Apr 2025 |
| Building plan approvalFile: 4-13_compressed.pdf | 6 Apr 2025 |
| Building plan approvalFile: 6-13_compressed (1).pdf | 6 Apr 2025 |
| Building plan approvalFile: 7-13_compressed.pdf | 6 Apr 2025 |
| Building plan approvalFile: 8-13_compressed.pdf | 6 Apr 2025 |
| Building plan approvalFile: 9-13_compressed.pdf | 6 Apr 2025 |
| Building plan approvalFile: 10-13_compressed.pdf | 6 Apr 2025 |
| Building plan approvalFile: 11-13_compressed.pdf | 6 Apr 2025 |
| Building plan approvalFile: 12-13_compressed.pdf | 6 Apr 2025 |
| Building plan approvalFile: 13-13_compressed.pdf | 6 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 4-13_compressed.pdf | 6 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 13-13_compressed.pdf | 6 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 12-13_compressed.pdf | 6 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 11-13_compressed.pdf | 6 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 10-13_compressed.pdf | 6 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 9-13_compressed.pdf | 6 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 8-13_compressed.pdf | 6 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 7-13_compressed.pdf | 6 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 6-13_compressed (1).pdf | 6 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 1-13_compressed (4).pdf | 6 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 3-13_compressed.pdf | 6 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 2-13_compressed (1).pdf | 6 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 1-13_compressed (4).pdf | 6 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 5-13_compressed.pdf | 6 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 4-13_compressed.pdf | 6 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 3-13_compressed.pdf | 6 Apr 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 157 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep ANTALYA NEXT on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Tathawade13,700+ in Pune
Filed coordinates, straight-line distance. 235 registered projects within 2 km.
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
VTP BELLISSIMO PHASE 1
MAGNITE DEVELOPERS PRIVATE LIMITED
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Builder: Sanil Constructions LLP
Sanil Constructions LLP has 1 registration on MahaRERA, including ANTALYA NEXT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if ANTALYA NEXT is delayed beyond 31 Mar 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ANTALYA NEXT?
The registered promoter entity is Sanil Constructions LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ANTALYA NEXT?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ANTALYA NEXT?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ANTALYA NEXT?
The professionals named in the filing: Architect: Space Craft Associates; Engineer: MR K M; Engineer: Dnyaneshwar Sonawne; Chartered Accountant: CA Harsh Julaniya; Chartered Accountant: Yogesh Gupta. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ANTALYA NEXT?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback