ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / ANTALYA NEXT

Registered No litigation declared Others project

ANTALYA NEXT

By Sanil Constructions LLP

RG-MH-05701 · RERA P52100066556 · Last updated on MahaRERA portal: 11 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedno revision filed
10 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 95%
252 of 334Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 157 documents Report an error

ANTALYA NEXT is a Others project by Sanil Constructions LLP in Pune, Maharashtra, registered with MahaRERA as P52100066556 on 11 Jun 2024. Possession is promised by 31 Mar 2028. 82 of the 334 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete.

At a glance

Project

  • NameANTALYA NEXT
  • TypeOthers
  • Location
    • Tathawade
    • Tathwade
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100066556
  • ReraGenie IDRG-MH-05701

Builder

  • NameSanil Constructions LLP
  • Entity typePartnership
  • PartnerSANDEEP RAMDAS GOYAL

Key dates

this monthRegisteredJun 2024PromisedMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Jun 2024
  • Promised completion31 Mar 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed157 files

Current status

25%82 of 334 units booked
32.7%Work done, per cost certificate

Figures as on 11 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA222014430174
Building BNA222013624160

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 11 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 95%.

Building A57%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building B67%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed359

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots359
Closed/Covered359
BuildingClosed/CoveredTotal
Building A107107
Building B252252

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,100 sq m
Land owned byNot the promoter
Named landowners1
LandownerVillageDistrict
SUNITA NEWALEChikhaliPune

Approvals and building plan

Sanctioning authoritySANDEEP RAMDAS GOYAL
Permissible FSI37055.65
Proposed, not sanctioned37,050 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRoyal Residency, Shop No 1 to 4, 48 Aundh Road, Next to Ganesh Temple, Khadki, Pune
Estimated costRs 161.58 cr
Cost incurredRs 52.87 cr
Work done32.72%
BuildingWingEstimatedIncurred
Building ANARs 80.09 crRs 24.54 cr
Building BNARs 76.71 crRs 23.51 cr
-NARs 4.78 crRs 4.82 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSpace Craft Associates
EngineerMR K M
EngineerDnyaneshwar Sonawne
Chartered AccountantCA Harsh Julaniya
Chartered AccountantYogesh Gupta
PartnerRole in project
Sanil Constructions LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Apr 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Mar 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Mar 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2028

Documents filed157

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 157 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architect Certificate Q1 FY 26-27.pdf11 Jul 2026
Withdrawal Update Form 2File: Form 2 Engineering Certificate Q1 FY 26-27.pdf11 Jul 2026
Withdrawal Update Form 3File: Signed Certificate Form 3 FY 2026-27 Q1.pdf11 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A FY 2025-26 Antalya Next.pdf29 Jun 2026
Withdrawal Update Form 1File: Form 1 Signed.pdf9 Apr 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate - QTR-4 2025-26.pdf9 Apr 2026
Withdrawal Update Form 3File: CA Signed Copy of Form3.pdf9 Apr 2026
Form 2A (FY 2024-2025)File: Signed Form 2A Certificate.pdf3 Apr 2026
Layout approvalFile: Layout.pdf17 Mar 2026
Building plan approvalFile: Plan 1.pdf17 Mar 2026
Building plan approvalFile: Plan 2.pdf17 Mar 2026
Building plan approvalFile: Plan 3.pdf17 Mar 2026
Building plan approvalFile: Plan 4.pdf17 Mar 2026
Building plan approvalFile: Plan 5.pdf17 Mar 2026
Building plan approvalFile: Plan 6.PDF17 Mar 2026
Building plan approvalFile: Plan 7.PDF17 Mar 2026
Building plan approvalFile: Plan 8.PDF17 Mar 2026
Building plan approvalFile: Plan 9.PDF17 Mar 2026
Building plan approvalFile: Plan 10.PDF17 Mar 2026
Building plan approvalFile: Plan 11.PDF17 Mar 2026
Building plan approvalFile: Plan 12.PDF17 Mar 2026
Building plan approvalFile: Plan 13.PDF17 Mar 2026
Building plan approvalFile: Plan 14.PDF17 Mar 2026
Form 5 (FY 2024-2025)File: Form 5 Sigend.pdf12 Mar 2026
Withdrawal Update Form 1File: Architect Certificate Q3 FY25-26.pdf9 Feb 2026
Withdrawal Update Form 2File: Sanil Engineers Certificate Q3 FY25-26.pdf9 Feb 2026
Withdrawal Update Form 3File: CA Certificate Q3 FY 25-26.pdf9 Feb 2026
Withdrawal Update Form 1File: Archiech Certificate.pdf14 Jan 2026
Withdrawal Update Form 1File: Archiech Certificate.pdf14 Jan 2026
Withdrawal Update Form 1File: Archiech Certificate.pdf14 Jan 2026
Withdrawal Update Form 2File: Q2 FY2526 Engineers Certificate.pdf14 Jan 2026
Withdrawal Update Form 2File: Q2 FY2526 Engineers Certificate.pdf14 Jan 2026
Withdrawal Update Form 2File: Q2 FY2526 Engineers Certificate.pdf14 Jan 2026
Withdrawal Update Form 3File: Q2 FY 25-26 CA Certificate signed.pdf14 Jan 2026
Withdrawal Update Form 3File: Q2 FY 25-26 CA Certificate signed.pdf14 Jan 2026
Withdrawal Update Form 3File: Q2 FY 25-26 CA Certificate signed.pdf14 Jan 2026
Withdrawal Update Form 1File: Architect Certificate Q1.pdf8 Jan 2026
Withdrawal Update Form 2File: Engineers Certificate signed u0026 Stamp Q1 FY25-26.pdf8 Jan 2026
Withdrawal Update Form 3File: CA Certificate signed u0026 Stamp Q1 FY25-26.pdf8 Jan 2026
Withdrawal Update Form 1File: Antalya Next Architect Certificate Q1 FY24-25.pdf5 Aug 2025
Withdrawal Update Form 2File: Engineer Certificate For Rera Q3 FY 24-25.pdf5 Aug 2025
Withdrawal Update Form 3File: CA Certificate.pdf5 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_compressed.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf24 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Booked Report.pdf24 Apr 2025
Copy of the legal title reportFile: DocScanner 8 Apr 2025 16-03-compressed.pdf8 Apr 2025
Building plan approvalFile: 1-13_compressed (4).pdf6 Apr 2025
Building plan approvalFile: 2-13_compressed (1).pdf6 Apr 2025
Building plan approvalFile: 3-13_compressed.pdf6 Apr 2025
Building plan approvalFile: 4-13_compressed.pdf6 Apr 2025
Building plan approvalFile: 5-13_compressed.pdf6 Apr 2025
Building plan approvalFile: 1-13_compressed (4).pdf6 Apr 2025
Building plan approvalFile: 2-13_compressed (1).pdf6 Apr 2025
Building plan approvalFile: 3-13_compressed.pdf6 Apr 2025
Building plan approvalFile: 4-13_compressed.pdf6 Apr 2025
Building plan approvalFile: 6-13_compressed (1).pdf6 Apr 2025
Building plan approvalFile: 7-13_compressed.pdf6 Apr 2025
Building plan approvalFile: 8-13_compressed.pdf6 Apr 2025
Building plan approvalFile: 9-13_compressed.pdf6 Apr 2025
Building plan approvalFile: 10-13_compressed.pdf6 Apr 2025
Building plan approvalFile: 11-13_compressed.pdf6 Apr 2025
Building plan approvalFile: 12-13_compressed.pdf6 Apr 2025
Building plan approvalFile: 13-13_compressed.pdf6 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 4-13_compressed.pdf6 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 13-13_compressed.pdf6 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 12-13_compressed.pdf6 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 11-13_compressed.pdf6 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 10-13_compressed.pdf6 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 9-13_compressed.pdf6 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 8-13_compressed.pdf6 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 7-13_compressed.pdf6 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 6-13_compressed (1).pdf6 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 1-13_compressed (4).pdf6 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 3-13_compressed.pdf6 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 2-13_compressed (1).pdf6 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 1-13_compressed (4).pdf6 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 5-13_compressed.pdf6 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 4-13_compressed.pdf6 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 3-13_compressed.pdf6 Apr 2025

How this compares with Pune

25%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ANTALYA NEXT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Tathawade13,700+ in Pune

2 kmANTALYA NEXTCompleted 105Lapsed / revoked 35Other 95Dot size: filed unitsN

Filed coordinates, straight-line distance. 235 registered projects within 2 km.

Builder: Sanil Constructions LLP

Sanil Constructions LLP has 1 registration on MahaRERA, including ANTALYA NEXT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ANTALYA NEXT is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ANTALYA NEXT?

The registered promoter entity is Sanil Constructions LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ANTALYA NEXT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ANTALYA NEXT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ANTALYA NEXT?

The professionals named in the filing: Architect: Space Craft Associates; Engineer: MR K M; Engineer: Dnyaneshwar Sonawne; Chartered Accountant: CA Harsh Julaniya; Chartered Accountant: Yogesh Gupta. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ANTALYA NEXT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANTALYA NEXT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANTALYA NEXT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.