Home / Browse projects / Pune, Maharashtra / ANSHUL CASA K BUILDING
ANSHUL CASA K BUILDING
By ANSHUL SIDDHI PROMOTERS AND BUILDERS LLP
RG-MH-19181 · RERA P52100078239 · Last updated on MahaRERA portal: 21 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ANSHUL CASA K BUILDING is a Residential / Group Housing project by ANSHUL SIDDHI PROMOTERS AND BUILDERS LLP in Pune, Maharashtra, registered with MahaRERA as P52100078239 on 29 Nov 2024. Possession is promised by 30 Apr 2031. 16 of the 42 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.
At a glance
Project
- NameANSHUL CASA K BUILDING
- TypeResidential / Group Housing
- Location
- KASPATE WASTI
- WAKAD
- Mulshi
- Pune
- 411057
- Pincode411057
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100078239
- ReraGenie IDRG-MH-19181
Builder
- NameANSHUL SIDDHI PROMOTERS AND BUILDERS LLP
- Entity typePartnership
- PartnersDEEPAK VILASRAO JAGTAP, RAMESH PANDURANG UNDE
- Declared earlier projects4 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 Nov 2024
- Promised completion30 Apr 2031
- Revised completionNone
- Buildings1 building record
- Documents filed70 files
Current status
Figures as on 21 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ANSHUL CASA K BUILDING | NA | 8 | 8 | 42 | 0 | 42 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 21 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Plinth, at 80%.
ANSHUL CASA K BUILDING: 16% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 21 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | Yes | 50% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed178
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership12
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| ABHIJEET MANIKRAO JAGDHANE | Pune (M Corp.) | Pune |
| TUSHAR SUDHAKAR SORTE | Pimpri Chinchawad (M Corp.) | Pune |
| SACHIN SUDHAKAR SORTE | Pimpri Chinchawad (M Corp.) | Pune |
| SAMBHAJI HANUMANT THORVE | Pune (M Corp.) | Pune |
| AJAY GAJANAN GHOGARDARE | Pune (M Corp.) | Pune |
| SUBHASH VISHNU JOSHI | Pune (M Corp.) | Pune |
| B VYANKATRAMANI | Pune (M Corp.) | Pune |
| SHANKARAN MAHADEVAN | Pune (M Corp.) | Pune |
| T NARAYAN MALLYA | Pune (M Corp.) | Pune |
| SADASHIV RAMA BANJAN | Pune (M Corp.) | Pune |
| PADMA SUBHASH MUTHA | Pune (M Corp.) | Pune |
| PADMA BHARAT PARMAR | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| ANSHUL CASA K BUILDING | NA | Rs 14.00 cr | Rs 2.06 cr |
| - | NA | Rs 95.00 lakh | - |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | FOURTH DIMENSION ARCHITECTS PVT LTD |
| Engineer | VILAS ANANDRAO KUDALE Anandrao Kudale |
| Chartered Accountant | Nitesh M Shah & Co |
| Partner | Role in project |
|---|---|
| ANSHUL SIDDHI PROMOTERS AND BUILDERS LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 11 Jun 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Oct 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Jun 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Apr 2031
Documents filed70
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: AC_CasaK_Sept25.pdf | 21 May 2026 |
| Withdrawal Update Form 1File: AC_CasaK_Dec25.pdf | 21 May 2026 |
| Withdrawal Update Form 2File: EC_CasaK_Sept25_DJ.pdf | 21 May 2026 |
| Withdrawal Update Form 2File: EC_CasaK_Dec25_DJ.pdf | 21 May 2026 |
| Withdrawal Update Form 3File: CA_CasaK_June25.pdf | 21 May 2026 |
| Withdrawal Update Form 3File: CA_CasaK_Dec25R.pdf | 21 May 2026 |
| Withdrawal Update Form 1File: AC_CasaK_June25_page-0001.pdf | 6 Feb 2026 |
| Withdrawal Update Form 2File: EC_Casa K_June25.pdf | 6 Feb 2026 |
| Withdrawal Update Form 3File: CA_CasaK_June25.pdf | 6 Feb 2026 |
| Form 1File: AC_CasaK_Dec2024.pdf | 16 Dec 2025 |
| Form 2File: EC_CasaK_Dec24.pdf | 16 Dec 2025 |
| Form 3File: CA_CasaK_Dec2024.pdf | 16 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: CasaK_SoldUnsold_Inventory_Dec-24.pdf | 16 Dec 2025 |
| Form 1File: AC_CasaK_March25.pdf | 16 Dec 2025 |
| Form 2File: EC_CasaK_March25.pdf | 16 Dec 2025 |
| Form 3File: CA_CasaK_March25.pdf | 16 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: CasaK_SoldUnsold_Inventory_March-25.pdf | 16 Dec 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC_CasaK_March25.pdf | 3 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_CasaK_March25.pdf | 3 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC_CasaK_March25.pdf | 3 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC_CasaK_Dec2024.pdf | 21 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_CasaK_Dec2024.pdf | 15 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC_CasaK_Dec24.pdf | 15 Feb 2025 |
| Proforma of Allotment letterFile: Model Form of Proforma Allotment Letter.pdf | 20 Nov 2024 |
| Proforma of Agreement for saleFile: Model AFS English.pdf | 20 Nov 2024 |
| Proforma of Agreement for saleFile: Model AFS English.pdf | 20 Nov 2024 |
| Proforma of Allotment letterFile: Model Form of Proforma Allotment Letter.pdf | 20 Nov 2024 |
| Layout approvalFile: FSI PLINTH AREA MARKED PLAN.pdf | 8 Oct 2024 |
| Layout approvalFile: Final Layout CASA K for Upload.pdf | 8 Oct 2024 |
| Layout approvalFile: Final Layout CASA K for Upload.pdf | 8 Oct 2024 |
| Layout approvalFile: FSI PLINTH AREA MARKED PLAN.pdf | 8 Oct 2024 |
| Copy of Layout Approval (in case of layout)File: Final Layout CASA K for Upload.pdf | 8 Oct 2024 |
| Copy of Layout Approval (in case of layout)File: FSI PLINTH AREA MARKED PLAN.pdf | 8 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Verification CASA K Building.pdf | 8 Oct 2024 |
| Copy of Layout Approval (in case of layout)File: Final Layout CASA K for Upload.pdf | 8 Oct 2024 |
| Copy of Layout Approval (in case of layout)File: FSI PLINTH AREA MARKED PLAN.pdf | 8 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Verification CASA K Building.pdf | 8 Oct 2024 |
| Declaration about Commencement CertificateFile: Format D.pdf | 12 Aug 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: APPENDIX F.pdf | 16 Jul 2024 |
| Details of encumbrances concerned to FinanceFile: No Encumbrance Declaration CASA K.pdf | 28 Jun 2024 |
| Details of encumbrances concerned to LegalFile: No Encumbrance Declaration CASA K.pdf | 28 Jun 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: cc.pdf | 27 Jun 2024 |
| CERSAI detailsFile: No Cersai Declaration CASA K.pdf | 27 Jun 2024 |
| Other - FinanceFile: Financial Encumbrance Declaration CASA K.pdf | 19 Jun 2024 |
| Copy of the legal title reportFile: Format A Legal Title Report.pdf | 11 Jun 2024 |
| Other - LegalFile: Name Change Document.pdf | 11 Jun 2024 |
| Other - LegalFile: LLP Agreement.pdf | 11 Jun 2024 |
| Other - TechnicalFile: Declaration Cum Undertaking Annexure A.pdf | 11 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: RU Disclosure of interest in other real estate organisation.pdf | 11 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DJ Disclosure of Interest in other real estate organisation.pdf | 11 Jun 2024 |
| Building plan approvalFile: casa-k-section-elevation-and-terrace-floor-plan_Compressed.pdf | 5 Jun 2024 |
| Building plan approvalFile: casa-k-parking-plan_Compressed.pdf | 5 Jun 2024 |
| Building plan approvalFile: CASA K FLOOR PLAN.pdf | 5 Jun 2024 |
| PAN CardFile: ASPB LLP PAN CARD.pdf | 5 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: CASA K FLOOR PLAN.pdf | 5 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: casa-k-parking-plan_Compressed.pdf | 5 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: casa-k-section-elevation-and-terrace-floor-plan_Compressed.pdf | 5 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_CasaK_May24.pdf | 29 May 2024 |
| Deviation Report with respect to Allotment letterFile: No Deviation Allotment Letter_page-0001.pdf | 23 May 2024 |
| Deviation Report with respect to model copy of AgreementFile: No Deviation Agreement for Sale_page-0001.pdf | 23 May 2024 |
| Declaration in FORM BFile: Form B DJ.pdf | 22 May 2024 |
| Declaration in FORM BFile: Form B Ramesh Unde.pdf | 22 May 2024 |
| Other - LegalFile: Sale Deed 1541-2013 Shilpa Sasne-ASPB_compressed_compressed.pdf | 22 May 2024 |
| Other - LegalFile: Confirmation Deed 10323-2010 Anjali Thombre-ASPB_compressed.pdf | 22 May 2024 |
| Other - LegalFile: Sale Deed 822-2011 Anjali Thombre.pdf | 22 May 2024 |
| Other - LegalFile: Sale Deed 2514-2013 Kale-ASPB_compressed_compressed.pdf | 22 May 2024 |
| Other - LegalFile: Sale Deed 5457-2013 Mangala Jagtap-ASPB_compressed_compressed.pdf | 22 May 2024 |
| Other - LegalFile: Sale Deed 8358-2012 Kailas Bhamburdekar To Anshul 226-1C-3_compressed_compressed.pdf | 22 May 2024 |
| Other - LegalFile: Sale Deed 10151-2011 Wable Sable-ASPB_compressed_compressed.pdf | 22 May 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: ASPB Seperate Bank Account Declaration.pdf | 22 May 2024 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| ANSHUL CASA H BUILDING | SURVEY NO 226 WAKAD PUNE | 32 | Completed | Oct 2025 | Feb 2023 |
| ANSHUL CASA G BUILDING | SURVEY NUMBER 226 WAKAD PUNE | 30 | Completed | Apr 2020 | Late, Nov 2020 |
| ANSHUL CASA DEF BUILDING | SURVEY NO 226 WAKAD PUNE | 92 | Completed | Apr 2016 | Late, Jul 2017 |
| ANSHUL CASA ABC BUILDING | SURVEY NO 226 WAKAD PUNE | 68 | Completed | Oct 2015 | Late, May 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 70 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep ANSHUL CASA K BUILDING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near WAKAD13,700+ in Pune
Filed coordinates, straight-line distance. 433 registered projects within 2 km.
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
VTP BELLISSIMO PHASE 1
MAGNITE DEVELOPERS PRIVATE LIMITED
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Builder: ANSHUL SIDDHI PROMOTERS AND BUILDERS LLP
ANSHUL SIDDHI PROMOTERS AND BUILDERS LLP has 1 registration on MahaRERA, including ANSHUL CASA K BUILDING. Its filings disclose 4 earlier MahaRERA projects: declares 1 of 4 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if ANSHUL CASA K BUILDING is delayed beyond 30 Apr 2031?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ANSHUL CASA K BUILDING?
The registered promoter entity is ANSHUL SIDDHI PROMOTERS AND BUILDERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ANSHUL CASA K BUILDING?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ANSHUL CASA K BUILDING?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ANSHUL CASA K BUILDING?
The professionals named in the filing: Architect: FOURTH DIMENSION ARCHITECTS PVT LTD; Engineer: VILAS ANANDRAO KUDALE Anandrao Kudale; Chartered Accountant: Nitesh M Shah & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ANSHUL CASA K BUILDING?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback