ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Anshul Casa J Building

Registered No litigation declared Residential / Group Housing project

Anshul Casa J Building

By ANSHUL SIDDHI PROMOTERS & BUILDERS LLP

RG-MH-78842 · RERA P52100054311 · Last updated on MahaRERA portal: 10 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2030Possession promisedno revision filed
9 of 11Construction stages donefurthest along: Basement (if any), 0%
4 of 56Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 96 documents Report an error

Anshul Casa J Building is a Residential / Group Housing project by ANSHUL SIDDHI PROMOTERS & BUILDERS LLP in Pune, Maharashtra, registered with MahaRERA as P52100054311 on 15 Jan 2024. Possession is promised by 30 Apr 2030. 52 of the 56 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameAnshul Casa J Building
  • TypeResidential / Group Housing
  • Location
    • S.NO. 226
    • KASPATE WASTI
    • WAKAD
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100054311
  • ReraGenie IDRG-MH-78842

Builder

  • NameANSHUL SIDDHI PROMOTERS & BUILDERS LLP
  • Entity typePartnership
  • PartnersDEEPAK VILASRAO JAGTAP, RAMESH PANDURANG UNDE
  • Declared earlier projects3 →

Key dates

this monthRegisteredJan 2024PromisedApr 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Jan 2024
  • Promised completion30 Apr 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed96 files

Current status

93%52 of 56 units booked
123.7%Work done, per cost certificate

Figures as on 10 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Anshul Casa J BuildingNA7756056

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

Anshul Casa J Building: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 10 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes90%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes50%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed56

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots56
Closed/Covered31
Open Space25

Land and ownership12

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,034 sq m
Land owned byThe promoter, with other names on the file
Named landowners12
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Dec 2025
LandownerVillageDistrict
Padma Bharat ParmarPune (M Corp.)Pune
Padma Subhash MuthaPune (M Corp.)Pune
Sadashiv Rama BanjanPune (M Corp.)Pune
T Narayan MallyaPune (M Corp.)Pune
Shankaran MahadevanPune (M Corp.)Pune
B VyankatramaniPune (M Corp.)Pune
Subhash Vishnu JoshiPune (M Corp.)Pune
Ajay Gajanan GhogardePune (M Corp.)Pune
Sambhaji Hanumant ThorveParvatiPune
Sachin Sudhakar SortePimpri Chinchawad (M Corp.)Pune
Tushar Sudhakar SortePimpri Chinchawad (M Corp.)Pune
Abhijeet Manikrao JagdhanePune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI7317.83
Proposed, not sanctioned7,318 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFC ROAD PUNE - 411005
Estimated costRs 17.15 cr
Cost incurredRs 21.22 cr
Work done123.71%
BuildingWingEstimatedIncurred
Anshul Casa J BuildingNARs 15.20 crRs 19.67 cr
-NARs 1.95 crRs 1.55 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectFOURTH DIMENSION ARCHITECTS PVT LTD FOURTH DIMENSION ARCHITECTS PVT LTD
EngineerVILAS ANANDRAO KUDALE
Chartered AccountantNITESH M SHAH & CO
PartnerRole in project
ANSHUL SIDDHI PROMOTERS & BUILDERS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2030

Documents filed96

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: AC_CasaJ_March26.pdf10 Jul 2026
Withdrawal Update Form 2File: EC_CasaJ_March26_page-0001.pdf10 Jul 2026
Withdrawal Update Form 3File: CA_CasaJ_March26.pdf10 Jul 2026
Withdrawal Update Form 1File: AC_CasaJ_Sept25.pdf13 May 2026
Withdrawal Update Form 1File: AC_CasaJ_Dec25.pdf13 May 2026
Withdrawal Update Form 2File: EC_CasaJ_Sept25_DJ.pdf13 May 2026
Withdrawal Update Form 2File: EC_CasaJ_Dec25_DJ.pdf13 May 2026
Withdrawal Update Form 3File: CA_CasaJ_Sept25.pdf13 May 2026
Withdrawal Update Form 3File: CA_CasaJ_Dec25.pdf13 May 2026
Withdrawal Update Form 1File: AC_CasaJ_June25_page-0001.pdf11 Feb 2026
Withdrawal Update Form 2File: EC_CasaJ_June25.pdf11 Feb 2026
Withdrawal Update Form 3File: CA_CasaJ_June25.pdf11 Feb 2026
Form 1File: AC_CasaJ_March25.pdf24 Dec 2025
Form 2File: EC_CasaJ_March25_page-0001.pdf24 Dec 2025
Form 3File: CA_CasaJ_March25.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory_Casa J March - 25.pdf24 Dec 2025
Withdrawal Update Form 1File: AC_CasaJ_March25.pdf24 Dec 2025
Withdrawal Update Form 2File: EC_CasaJ_March25_page-0001.pdf24 Dec 2025
Withdrawal Update Form 3File: CA_CasaJ_March25.pdf24 Dec 2025
Form 1File: AC_CasaJ_March24.pdf23 Dec 2025
Form 2File: EC_CasaJ_March24.pdf23 Dec 2025
Form 3File: CA_CasaJ_March24.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory_Casa J March - 24.pdf23 Dec 2025
Form 1File: AC_CasaJ_June24.pdf23 Dec 2025
Form 2File: EC_CasaJ_June24.pdf23 Dec 2025
Form 3File: CA_CasaJ_June24.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory_Casa J June - 24.pdf23 Dec 2025
Form 1File: AC_7Anshul_Sept24.pdf23 Dec 2025
Form 2File: EC_CasaJ_Sept24.pdf23 Dec 2025
Form 3File: CA_CasaJ_Sept24.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory_Casa J Sept - 24.pdf23 Dec 2025
Form 1File: AC_CasaJ_Dec2024.pdf23 Dec 2025
Form 2File: EC_CasaJ_Dec24_N.pdf23 Dec 2025
Form 3File: CA_CasaJ_Dec2024.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory_Casa J Dec - 24.pdf23 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CAsa J Form 1_page-0002.pdf15 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_CasaJ_Dec2024.pdf15 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC_CasaJ_Dec24_.pdf15 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC_CasaJ_Sept24.pdf30 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_CasaJ_Sept24.pdf30 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC_CasaJ_Sept24.pdf29 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC_CasaJ_June24.pdf25 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_CasaJ_June24.pdf25 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC_CasaJ_June24.pdf25 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_CasaJ_March24.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC_CasaJ_March24.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC_CasaJ_March24.pdf12 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC_CasaJ_Dec23.pdf20 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC_CasaJ_Dec23.pdf20 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_CasaJ_Dec23.pdf20 Mar 2024
Copy of the legal title reportFile: Format A Search Report.pdf28 Dec 2023
Other - LegalFile: Partnership firm certificates.pdf28 Dec 2023
Proforma of Agreement for saleFile: Model AFS English.pdf2 Dec 2023
Proforma of Allotment letterFile: Model Form of Proforma Allotment Letter.pdf2 Dec 2023
Deviation Report with respect to Allotment letterFile: No Deviation Allotment Letter.pdf2 Dec 2023
Deviation Report with respect to model copy of AgreementFile: No Deviation Agreement for Sale.pdf2 Dec 2023
Other - LegalFile: DA 3808-2005 Parmar Mutha-Siddhi Karan_compressed_compressed.pdf2 Dec 2023
Other - LegalFile: POA 3809-2005 Parmar Mutha-Siddhi Karan_compressed_compressed.pdf2 Dec 2023
Other - LegalFile: Confirmation Deed 10323-2010 Anjali Thombre-ASPB_compressed.pdf2 Dec 2023
Other - LegalFile: Sale Deed 822-2011 Anjali Thombre.pdf2 Dec 2023
Other - LegalFile: DA 5074-2006 Banjan-Sambhaji Thorve_compressed_compressed.pdf2 Dec 2023
Other - LegalFile: POA 5075-2006 Banjan-Thorve_compressed.pdf2 Dec 2023
Other - LegalFile: DA 6154-2006 Thorve-Siddhi Karan_compressed.pdf2 Dec 2023
Other - LegalFile: POA 6155-2006 Thorve-Siddhi Karan_compressed.pdf2 Dec 2023
Other - LegalFile: Sale Deed 5457-2013 Mangala Jagtap-ASPB_compressed_compressed.pdf2 Dec 2023
Other - LegalFile: Sale Deed 10151-2011 Wable Sable-ASPB_compressed_compressed.pdf2 Dec 2023
Other - LegalFile: Sale Deed 2514-2013 Kale-ASPB_compressed_compressed.pdf2 Dec 2023
Other - LegalFile: Sale Deed 1541-2013 Shilpa Sasne-ASPB_compressed_compressed.pdf2 Dec 2023
Other - LegalFile: DA 2153-2006 Sorte-Jagdhane_compressed.pdf2 Dec 2023
Other - LegalFile: POA 2154-2006 Sorte Jagdhane_compressed.pdf2 Dec 2023
Other - LegalFile: DA 5191-2016 Jagdgane-ASPB_compressed_compressed_compressed_compressed (1).pdf2 Dec 2023
Other - LegalFile: POA 5192-2016- Jagdhane -ASPB_compressed.pdf2 Dec 2023
Other - LegalFile: Sale Deed 8358-2012 Kailas Bhamburdekar To Anshul 226-1C-3_compressed_compressed.pdf2 Dec 2023
Details of encumbrances concerned to FinanceFile: No Legal Encumbrance.pdf11 Oct 2023
Details of encumbrances concerned to LegalFile: No Legal Encumbrance.pdf11 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Separate Bank Account.pdf25 Aug 2023
Details of encumbrances concerned to FinanceFile: declaration of financial encumbrance.pdf11 Aug 2023
Details of encumbrances concerned to LegalFile: declaration of financial encumbrance.pdf11 Aug 2023
Layout approvalFile: Scan_0780-01 LAYOOUT PLAN_compressed.pdf17 Jul 2023
Copy of Layout Approval (in case of layout)File: Scan_0780-01 LAYOOUT PLAN_compressed.pdf17 Jul 2023

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
ANSHUL CASA G BUILDINGSURVEY NO 226 WAKAD PUNE30CompletedApr 2020Late, Nov 2020
ANSHUL CASA DEF BUILDINGSURVEY NO 226 WAKAD PUNE92CompletedApr 2016Late, Jul 2017
ANSHUL CASA ABC BUILDINGSURVEY NO 226 WAKAD PUNE68CompletedJun 2015Late, May 2016

How this compares with Pune

93%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Anshul Casa J Building on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WAKAD13,700+ in Pune

2 kmAnshul Casa J BuildingCompleted 163Lapsed / revoked 119Other 151Dot size: filed unitsN

Filed coordinates, straight-line distance. 433 registered projects within 2 km.

Builder: ANSHUL SIDDHI PROMOTERS & BUILDERS LLP

ANSHUL SIDDHI PROMOTERS & BUILDERS LLP has 1 registration on MahaRERA, including Anshul Casa J Building. Its filings disclose 3 earlier MahaRERA projects: declares 0 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Anshul Casa J Building is delayed beyond 30 Apr 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Anshul Casa J Building?

The registered promoter entity is ANSHUL SIDDHI PROMOTERS & BUILDERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Anshul Casa J Building?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Anshul Casa J Building?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Anshul Casa J Building?

The professionals named in the filing: Architect: FOURTH DIMENSION ARCHITECTS PVT LTD FOURTH DIMENSION ARCHITECTS PVT LTD; Engineer: VILAS ANANDRAO KUDALE; Chartered Accountant: NITESH M SHAH & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Anshul Casa J Building?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Anshul Casa J Building. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Anshul Casa J Building to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.