Home / Browse projects / Pune, Maharashtra / ANP - ATLANTIS -Phase I
ANP - ATLANTIS -Phase I
RG-MH-15859 · RERA P52100024229 · Last updated on MahaRERA portal: 20 Jul 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ANP - ATLANTIS -Phase I is a Residential / Group Housing project by M/S.Five Star Shelters in Pune, Maharashtra, registered with MahaRERA as P52100024229 on 27 Jan 2020. The registration is recorded completed; possession was promised by 30 Dec 2025.
At a glance
Project
- NameANP - ATLANTIS -Phase I
- TypeResidential / Group Housing
- Location
- 30 M W D P ROAD Adjoining to Jupitar Hospital Balewadi
- BALEWADI
- Baner
- Haveli
- Pune
- 411045
- Pincode411045
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100024229
- ReraGenie IDRG-MH-15859
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on27 Jan 2020
- Promised completion30 Dec 2025
- Revised completionNone
- Buildings6 building records
- Documents filed179 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building A | NA | 23 | 0 | 0 | 0 | 0 |
| Building - B | NA | 23 | 0 | 0 | 0 | 0 |
| Building -C | NA | 23 | 0 | 0 | 0 | 0 |
| Building-D | NA | 23 | 0 | 0 | 0 | 0 |
| Building-E | NA | 23 | 0 | 0 | 0 | 0 |
| Building-F | NA | 23 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building6
As on 20 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
52 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is External plumbing and external plaster, at 95%.
Building A91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building - B91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building -C91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building-D95%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 50% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building-E80%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 25% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building-F77%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 70% |
| Sanitary Fittings within the flats / premises | 10% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 75% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 95% |
| Street Lighting | Yes | 90% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 90% |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 0% |
Parking filed18
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Building A | 3 | 3 |
| Building - B | 3 | 3 |
| Building -C | 3 | 3 |
| Building-D | 3 | 3 |
| Building-E | 3 | 3 |
| Building-F | 3 | 3 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| M/S.Five Star Shelters | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 250/2015 | Jt Civil Judge S D Pune | Application for temporary injunction at Exh Five is rejected by Hon civil court and by Hon High c |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Jan 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 Mar 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Mar 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Mar 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 19 Mar 2025
Documents filed179
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 179 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 4.pdf | 20 Jul 2025 |
| Form 2File: FORM 2.pdf | 20 Jul 2025 |
| Form 3File: Form 3.pdf | 20 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Circular.pdf | 20 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 16 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 16 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Circular.pdf | 16 Jul 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION CERTIFICATE E AND F BUILDING FULL.pdf | 19 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: ATLANTIS_compressed.pdf | 28 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Atlantis 31 12 24_compressed.pdf | 23 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Atltanis 31 12 24.pdf | 23 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Atlantis 31 03 2024_compressed.pdf | 21 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - JUNE 30 06 2024.pdf | 21 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Atlantis 31 03 2024.pdf | 21 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - JUNE - Atlantis 30 06 2024.pdf | 21 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - SEP - Atlantis 30 09 2024.pdf | 21 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 3 - SEP 30 09 2024.pdf | 21 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION CERTIFICATE Buildind D Full And G Part.pdf | 14 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4 FORM2 31 03 2021.pdf | 11 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4 FORM2 31 03 2022.pdf | 11 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4 FORM2 31 03 2023.pdf | 11 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1 FORM2 30 06 2023.pdf | 11 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2 FORM2 30 09 2023.pdf | 11 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3 FORM2 31 12 2023.pdf | 11 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4 FORM2 30 03 2024.pdf | 11 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4 FORM3 31 03 2021.pdf | 11 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4 FORM3 31 03 2022.pdf | 11 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4 FORM3 31 03 2023.pdf | 11 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1 FORM3 30 06 2023.pdf | 11 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 FORM3 30 09 2023.pdf | 11 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3 FORM3 31 12 2023.pdf | 11 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4 FORM3 30 03 2024.pdf | 11 May 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PART Occupancy COMPLETION Certificate BUILDING A B C and G.pdf | 11 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 ANP ATLANTIS 01-04-2022 To 31-03-2023.pdf | 20 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ANP ATLANTIS - ARCHITECT CERTIFICATE (15-04-2023)_compressed.pdf | 5 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ANP ATLANTIS - ARCHITECT CERTIFICATE (15-07-2023)compressed.pdf | 5 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: ANP ATLANTI FORM 5 March 21.pdf | 15 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: ANP ATLANTIS FORM 5 March 22.pdf | 15 Apr 2023 |
| Proforma of Agreement for saleFile: Draft Agreement copy atlantis.pdf | 23 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A 'ANP ATLANTIS' (April 2020 To June 2020).pdf | 12 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A 'ANP ATLANTIS' (July 2020 To Sept 2020).pdf | 12 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A 'ANP ATLANTIS' (Oct 2020 To Dec 2020).pdf | 12 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A 'ANP ATLANTIS' (Jan 2021 To March 2021).pdf | 12 Aug 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ANP ATLANTIS FSS FORM2 31-03-2020.pdf | 9 Aug 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ANP ATLANTIS FSS FORM3 31-03-2020.pdf | 9 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: ANP ATLANTIS FSS FORM5 31-03-2020.pdf | 9 Aug 2021 |
| Layout approvalFile: plan 01-19-compressed.pdf | 25 Mar 2021 |
| Building plan approvalFile: plan 02-19-compressed.pdf | 25 Mar 2021 |
| Building plan approvalFile: plan 03-19.pdf | 25 Mar 2021 |
| Building plan approvalFile: plan 04-19-compressed.pdf | 25 Mar 2021 |
| Building plan approvalFile: plan 05-19.pdf | 25 Mar 2021 |
| Building plan approvalFile: plan 06-19-compressed.pdf | 25 Mar 2021 |
| Building plan approvalFile: plan 07-19.pdf | 25 Mar 2021 |
| Building plan approvalFile: plan 08-19.pdf | 25 Mar 2021 |
| Building plan approvalFile: plan 09-19.pdf | 25 Mar 2021 |
| Building plan approvalFile: plan 10-19.pdf | 25 Mar 2021 |
| Building plan approvalFile: plan 11-19.pdf | 25 Mar 2021 |
| Building plan approvalFile: plan 12-19.pdf | 25 Mar 2021 |
| Building plan approvalFile: plan 14-19.pdf | 25 Mar 2021 |
| Building plan approvalFile: plan 15-19.pdf | 25 Mar 2021 |
| Building plan approvalFile: plan 16-19.pdf | 25 Mar 2021 |
| Building plan approvalFile: plan 17-19.pdf | 25 Mar 2021 |
| Building plan approvalFile: plan 18-19.pdf | 25 Mar 2021 |
| Building plan approvalFile: plan 19-19.pdf | 25 Mar 2021 |
| Building plan approvalFile: plan 13-19.pdf | 25 Mar 2021 |
| Copy of Layout Approval (in case of layout)File: plan 01-19-compressed.pdf | 25 Mar 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: plan 02-19-compressed.pdf | 25 Mar 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: plan 03-19.pdf | 25 Mar 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: plan 04-19-compressed.pdf | 25 Mar 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: plan 05-19.pdf | 25 Mar 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: plan 06-19-compressed.pdf | 25 Mar 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: plan 07-19.pdf | 25 Mar 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: plan 08-19.pdf | 25 Mar 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: plan 09-19.pdf | 25 Mar 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: plan 10-19.pdf | 25 Mar 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: plan 11-19.pdf | 25 Mar 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: plan 12-19.pdf | 25 Mar 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: plan 14-19.pdf | 25 Mar 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: plan 15-19.pdf | 25 Mar 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: plan 16-19.pdf | 25 Mar 2021 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| ROYAL GRACE | CTS NO 2071-2072 SURVEY NO 66-B-D-4 AUNDH -KHADKI ROAD BOPODI-PUNE CITY PUNE | 23 | Completed | Jan 2013 | Jan 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 179 filed documents as one ZIP, foldered, with a manifest
Keep ANP - ATLANTIS -Phase I on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BALEWADI13,700+ in Pune
Filed coordinates, straight-line distance. 277 registered projects within 2 km.
EARTH 1 BY VTP LUXE PHASE 1
MAHALUNGE REAL ESTATE DEVELOPERS PVT. LTD.
Godrej Meadows
Mahalunge Township Developers Private Limi
Godrej Green Vistas
Mahalunge Township Developers Private Limi
Godrej Hill Retreat
Mahalunge Township Developers Private Limi
Godrej Green Cove
Mahalunge Township Developers Private Limi
NYATI EMERALD I
NYATI BUILDERS PRIVATE LIMITED
Builder: M/S.Five Star Shelters
M/S.Five Star Shelters has 3 registrations on MahaRERA, including ROYAL RADIANCE and ANP - ATLANTIS -Phase I. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if ANP - ATLANTIS -Phase I is delayed beyond 30 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ANP - ATLANTIS -Phase I?
The registered promoter entity is M/S.Five Star Shelters, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ANP - ATLANTIS -Phase I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ANP - ATLANTIS -Phase I?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in ANP - ATLANTIS -Phase I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback