Registration lapsed No litigation declared Residential / Group Housing project

ANMOL EMERALD

By M/s Ekdant Housing

RG-MH-73497 · RERA P51700047196 · Last updated on MahaRERA portal: 17 May 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 14 months past the filed date
  • 4 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 6 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Aug 2025Possession promised14 months past this date
5 of 11Construction stages donefurthest along: Internal walls, 50%
4Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

ANMOL EMERALD is a Residential / Group Housing project by M/s Ekdant Housing in Thane, Maharashtra, registered with MahaRERA as P51700047196 on 11 Oct 2022. Possession was promised by 31 Aug 2025 and is now 14 months past that date. 4 complaints are on record with the regulator.

At a glance

Project

  • NameANMOL EMERALD
  • TypeResidential / Group Housing
  • Location
    • Near Godbole Hospital
    • Naupada
    • Thane (M Corp.)
    • Thane
    • 400602
  • Pincode400602
  • RERA no.P51700047196
  • ReraGenie IDRG-MH-73497

Builder

  • NameM/s Ekdant Housing
  • Entity typePartnership
  • PartnersAshok Vishanji Pasad, Hasmukh Surji Shah
  • Other registrations3 more →
  • Completed3 of 4
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

14 months past promisethis monthRegisteredOct 2022PromisedAug 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on11 Oct 2022
  • Promised completion31 Aug 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed65 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Anmol EmeraldNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 50%.

Anmol Emerald: 54% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed36

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots36
Closed/Covered33
Open Space3

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area617 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1810.0
Proposed, not sanctioned1,674 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNaupada Thane west

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architect10 FOLDS ARCHITECTS & CONSULTANTS
EngineerMR. RAJAN TIPNIS
Chartered AccountantKeshav P Maheshwari & Associates
Chartered AccountantMohit Kabra & Co
PartnerRole in project
M/s Ekdant Housing-

Complaints filed with MahaRERA4

Case no.ComplainantRespondentFiled
CC006000000375361arvind d phanseM/s EKDANT HOUSING22/04/2023
CC12504027Vilas TambeM/s Ekdant Housing15/11/2025
CC12504028kiran sawantM/s Ekdant Housing15/11/2025
CC12504624Hemant Sudhakar RashinkarM/s Ekdant Housing25/12/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf17 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf17 May 2024
Disclosure of sold/ booked inventoryFile: Discloser.pdf17 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3.pdf17 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect certificate for March 2024.pdf22 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer certificate for March 2024.pdf22 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 25012024.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 18012024.pdf5 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure 31122023.pdf5 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 24012024.pdf5 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 21102023.pdf2 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 5102023.pdf2 Nov 2023
Disclosure of sold/ booked inventoryFile: Disclosure 3092023.pdf2 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 30102023.pdf2 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5 5102023.pdf2 Nov 2023
Building plan approvalFile: 1 sanction plan Layout Plan- 190623_compressed.pdf12 Oct 2023
Building plan approvalFile: 2 sanction plan Ground to 8th Floor- 190623_compressed.pdf12 Oct 2023
Building plan approvalFile: 3 sanction plan Elevation- 190623_compressed.pdf12 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 1 sanction plan Layout Plan- 190623_compressed.pdf12 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 2 sanction plan Ground to 8th Floor- 190623_compressed.pdf12 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 3 sanction plan Elevation- 190623_compressed.pdf12 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure.pdf12 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 18072023_compressed.pdf12 Oct 2023
Proforma of Agreement for saleFile: Deviation Report.pdf12 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 18072023_compressed.pdf27 Sep 2023
Proforma of Agreement for saleFile: Agreement For Sale -Final amended 8th floor_compressed.pdf27 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 13072023.pdf26 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 14072023.pdf14 Jul 2023
Building plan approvalFile: sanction plan Ground to 8th Floor- 190623_compressed.pdf13 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: sanction plan Ground to 8th Floor- 190623_compressed.pdf13 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: CC 1to8th Floor 19062023_compressed.pdf13 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A 03052023.pdf20 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 (25042023)_compressed.pdf30 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 10042023 compressed.pdf23 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 10042023 compressed.pdf23 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf28 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf28 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_11zon.pdf28 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Declarataion - Hasmukh Shah.pdf28 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Declaration - Ashok Pasad.pdf28 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 04012023 Anmol Emerald.pdf22 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 05012023 Anmol Emerald.pdf22 Jan 2023
Proforma of Agreement for saleFile: 30092022 Agreement for sale_compressed.pdf22 Jan 2023
Other - LegalFile: 30092022Agreement for sale_compressed.pdf27 Sep 2022
Declaration about Commencement CertificateFile: Declaration about CC.pdf10 Sep 2022
Declaration in FORM BFile: Form - B.pdf10 Sep 2022
Layout approvalFile: Phanse Property Sanction Plan - 04072022 compressed.pdf9 Sep 2022
Copy of the legal title reportFile: Title certificate-Anmol Emerald 22072022_compressed.pdf9 Sep 2022
Details of encumbrances concerned to FinanceFile: Non Encumbrance Certificate.pdf9 Sep 2022
Details of encumbrances concerned to LegalFile: Non Encumbrance Certificate.pdf9 Sep 2022
Copy of Layout Approval (in case of layout)File: Phanse Property Sanction Plan - 04072022 compressed.pdf9 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 Rera 230922 compressed.pdf9 Sep 2022
Proforma of Allotment letterFile: Allotment Letter_compressed.pdf9 Sep 2022
Deviation Report with respect to Allotment letterFile: deviation report on Allotment.pdf9 Sep 2022
Deviation Report with respect to model copy of AgreementFile: 300922Deviation report.pdf9 Sep 2022
Building plan approvalFile: Phanse Property Sanction Plan 04072022 compressed.pdf28 Aug 2022
Building plan approvalFile: Phanse Property Sanction Plan - 04072022 compressed.pdf28 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: Phanse Property Sanction Plan 04072022 compressed.pdf28 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: Phanse Property Sanction Plan - 04072022 compressed.pdf28 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: CC - 04072022 compressed.pdf28 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf28 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf28 Aug 2022
CERSAI detailsFile: CERSAI_Search Report For Asset Based.pdf28 Aug 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Rera Bank Ac - declaration.pdf28 Aug 2022
PAN CardFile: 1 PAN Card.pdf14 Aug 2022

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
PRATIK SAHANIWASveer Savarkar Road Opp Lokmanya Society Naupada Thane W26CompletedDec 2021Dec 2021
ANMOL OASISBhaskar Colony naupada Thane W46CompletedSep 2021Sep 2021
ANMOL SAPPHIREVishnu Nagar Naupada Thane W16CompletedFeb 2019Feb 2019
ANMOL MANSIONOpposite Kadambari Society Dr Lazaras Road Charai Naka Thane West 40060120CompletedAug 2015Aug 2015
ANMOL ANNEXIEDr Sonomiya Road Dhobi Ali Charai Thane West30CompletedDec 2014Dec 2014
ANMOL RESIDENCY A WINGPOKRAN ROAD NO 1 SAMTA NAGAR THANE21CompletedApr 2013Apr 2013

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ANMOL EMERALD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Naupada7,600+ in Thane

Builder: M/s Ekdant Housing

M/s Ekdant Housing has 4 registrations on MahaRERA, including ANMOL SAPPHIRE and Pratik Sahaniwas. Its filings disclose 6 earlier MahaRERA projects: declares 6 of 6 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that ANMOL EMERALD shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if ANMOL EMERALD is delayed beyond 31 Aug 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ANMOL EMERALD?

The registered promoter entity is M/s Ekdant Housing, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ANMOL EMERALD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ANMOL EMERALD?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ANMOL EMERALD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ANMOL EMERALD?

The professionals named in the filing: Architect: 10 FOLDS ARCHITECTS & CONSULTANTS; Engineer: MR. RAJAN TIPNIS; Chartered Accountant: Keshav P Maheshwari & Associates; Chartered Accountant: Mohit Kabra & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ANMOL EMERALD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANMOL EMERALD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANMOL EMERALD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.