Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
108 of 164Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

ANIKA PICCADILLY PHASE 3 is a Residential / Group Housing project by Arun Pitamber Sheth in Pune, Maharashtra, registered with MahaRERA as P52100078875 on 17 Jan 2025. Possession is promised by 31 Dec 2028. 56 of the 164 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameANIKA PICCADILLY PHASE 3
  • TypeResidential / Group Housing
  • Location
    • D P Road
    • Punawale
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100078875
  • ReraGenie IDRG-MH-23563

Builder

  • NameArun Pitamber Sheth
  • Entity typeIndividual
  • GSTIN27ACGPS6044Q1ZU
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Other registrations7 more →
  • Completed5 of 8
  • Declared earlier projects3 →

Key dates

this monthRegisteredJan 2025PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Jan 2025
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed62 files

Current status

34%56 of 164 units booked
36.4%Work done, per cost certificate

Figures as on 6 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CD BuildingNA24211640164

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

CD Building: 52% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes15%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed165

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots165
Closed/Covered160
Open Space5

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,000 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Jun 2025

Approvals and building plan

Sanctioning authorityPCMC
Permissible FSI15853.12
Proposed, not sanctioned15,853 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch27/1, YOGESHWARI APARTMENT,, ERANDWANA,, GANESHNAGAR,, PINCODE - 411051
Estimated costRs 55.00 cr
Cost incurredRs 20.00 cr
Work done36.36%
BuildingWingEstimatedIncurred
CD BuildingNARs 55.00 crRs 20.00 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANUPAMA ARUN SHETH
ArchitectPiankh Designing Spaces
EngineerEKNATH JAGANNATH BALIP
EngineerArun Sheth and Company
Chartered AccountantROHIT RAJEEV SHAH YUVAK AND COMPANY
Chartered AccountantRohit R Shah & Co
Chartered AccountantBorkar and Borkar
PartnerRole in project
Arun Pitamber Sheth-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Apr 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_March 26.pdf6 May 2026
Withdrawal Update Form 2File: Form 2_March 26.pdf6 May 2026
Withdrawal Update Form 3File: Form 3_March 26.pdf6 May 2026
Form 5 (FY 2024-2025)File: Form 5_Phase 3.pdf4 Mar 2026
Withdrawal Update Form 1File: Form 1_Sep 25.pdf5 Feb 2026
Withdrawal Update Form 1File: Form 1_Dec 25.pdf5 Feb 2026
Withdrawal Update Form 2File: Form 2 Sep 25.pdf5 Feb 2026
Withdrawal Update Form 2File: Form 2_Dec 25.pdf5 Feb 2026
Withdrawal Update Form 3File: Form 3_Sep 25.pdf5 Feb 2026
Withdrawal Update Form 3File: Form 3_Dec 25.pdf5 Feb 2026
Copy of the legal title reportFile: SEARCH TITLE REPORT 05-12-2024.pdf3 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ANIKA PICCADILLY PHASE 3 - 01-04-2025.pdf3 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED UNSOLD INVENTORY C WING 31-03-2025.pdf3 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED UNSOLD INVENTORY D WING 31-03-2025.pdf3 Apr 2025
Layout approvalFile: 14-33 SECTION PLAN.pdf12 Jan 2025
Layout approvalFile: 13 33 PARKING P2 P3 PARKING PODIUM SLAB 02 03.pdf12 Jan 2025
Layout approvalFile: 12 33 GROUND FLOOR PARKING P1 PARKING PODIUM SLAB 01.pdf12 Jan 2025
Layout approvalFile: 11 33 TERRACE AND GROUND FLOOR PLAN.pdf12 Jan 2025
Copy of Layout Approval (in case of layout)File: 14-33 SECTION PLAN.pdf12 Jan 2025
Copy of Layout Approval (in case of layout)File: 13 33 PARKING P2 P3 PARKING PODIUM SLAB 02 03.pdf12 Jan 2025
Copy of Layout Approval (in case of layout)File: 12 33 GROUND FLOOR PARKING P1 PARKING PODIUM SLAB 01.pdf12 Jan 2025
Copy of Layout Approval (in case of layout)File: 11 33 TERRACE AND GROUND FLOOR PLAN.pdf12 Jan 2025
Copy of the legal title reportFile: ANNEXURE II SEARCH AND TITLE 23-04-2024-Phase-2 - converted.pdf21 Dec 2024
Other - LegalFile: 7 12.pdf21 Dec 2024
Other - LegalFile: 1 ANNEXURE II FERFAR 19062020.pdf4 Dec 2024
Other - LegalFile: 1 ANNEXURE II FERFAR 19062020.pdf28 Nov 2024
Layout approvalFile: Copy of Layout Approval.pdf21 Nov 2024
Copy of the legal title reportFile: RERA Title Report.pdf21 Nov 2024
Copy of Layout Approval (in case of layout)File: Copy of Layout Approval.pdf21 Nov 2024
Other - LegalFile: Clarification Letter.pdf21 Nov 2024
Other - TechnicalFile: Clarification Letter.pdf21 Nov 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT AGREEMENT FOR SALE AP-PHASE3.pdf21 Nov 2024
Proforma of Agreement for saleFile: DRAFT AGREEMENT FOR SALE - AP PHASE 3- final 02-11-2024.pdf21 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIGNED_compressed.pdf14 Nov 2024
Other - LegalFile: 2 2373-2002 DEED OF CONFIRMATION - converted.pdf14 Nov 2024
Other - LegalFile: 1 SALE DEED 2875-2005_compressed.pdf14 Nov 2024
Other - LegalFile: 1 SALE DEED 6839-2001.PDF14 Nov 2024
Other - LegalFile: 3 SALE DEED 6157-2010 - converted.pdf14 Nov 2024
Other - LegalFile: 4 SALE DEED 10621-2011.pdf14 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf14 Nov 2024
Other - TechnicalFile: Declaration of One Plot One Registration - Anika Piccadilly Phase 3.pdf14 Nov 2024
Other - TechnicalFile: CC Confirmation.pdf14 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf14 Nov 2024
Details of encumbrances concerned to FinanceFile: 5 NO ENCUMBRANCES CONCERNED TO LEGAL.pdf13 Nov 2024
Details of encumbrances concerned to LegalFile: 5 NO ENCUMBRANCES CONCERNED TO LEGAL.pdf13 Nov 2024
Proforma of Allotment letterFile: MODEL FORM OF ALLOTMENT.pdf2 Nov 2024
Deviation Report with respect to Allotment letterFile: Deviation of Allotment Letter - Anika Piccadilly Phase 3.pdf2 Nov 2024
Building plan approvalFile: CD BUILDING 10-33.pdf31 Oct 2024
Building plan approvalFile: CD BUILDING 9-33.pdf31 Oct 2024
PAN CardFile: PAN CARD SHRI ARUN SHETH.pdf31 Oct 2024
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCES CONCERNED TO FINANCE.pdf31 Oct 2024
Declaration in FORM BFile: AFFIDAVIT CUM DECLARATION FORM B.pdf31 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE FORM 1.pdf31 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CERTIFICATE OF ENGINEER FORM 2.pdf31 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE PHASE 3.pdf31 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: CD BUILDING 9-33.pdf31 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: CD BUILDING 10-33.pdf31 Oct 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT CC FORMAT D.pdf31 Oct 2024
CERSAI detailsFile: UNDERTAKING CERSAI REPORT.pdf31 Oct 2024
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCES CONCERNED TO FINANCE.pdf31 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST IN OTHER REAL ESTATE PROJECT.pdf31 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: DISCLOSURE OF SECURED UNSECURED FINANCE AVAILED FOR PROJECT.pdf31 Oct 2024

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Anika EcclesiaAnika Ecclesia Near Hanuman Mandir Pisoli87CompletedDec 2017Oct 2017
Sanskriti phase 3Sanskriti Kaspate wasti Wakad PCMC224CompletedJun 2017Feb 2017
Anika Hieghts1361 Sadashiv peth12CompletedMar 2014Jan 2014

How this compares with Pune

34%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ANIKA PICCADILLY PHASE 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Punawale13,700+ in Pune

2 kmANIKA PICCADILLY PHASE 3Completed 10Lapsed / revoked 13Other 30Dot size: filed unitsN

Filed coordinates, straight-line distance. 53 registered projects within 2 km.

Builder: Arun Pitamber Sheth

Arun Pitamber Sheth has 8 registrations on MahaRERA, including Anika Enclave and ANIKA LAXMI NIWAS. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ANIKA PICCADILLY PHASE 3 is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ANIKA PICCADILLY PHASE 3?

The registered promoter entity is Arun Pitamber Sheth, an individual as per the filing. Its GSTIN 27ACGPS6044Q1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ANIKA PICCADILLY PHASE 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ANIKA PICCADILLY PHASE 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ANIKA PICCADILLY PHASE 3?

The professionals named in the filing: Architect: ANUPAMA ARUN SHETH; Architect: Piankh Designing Spaces; Engineer: EKNATH JAGANNATH BALIP; Engineer: Arun Sheth and Company; Chartered Accountant: ROHIT RAJEEV SHAH YUVAK AND COMPANY; Chartered Accountant: Rohit R Shah & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ANIKA PICCADILLY PHASE 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANIKA PICCADILLY PHASE 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANIKA PICCADILLY PHASE 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.