Completed No litigation declared Others project

AND ROSE

By ANANTNATH DEVELOPERS

RG-MH-73709 · RERA P51700019146 · Last updated on MahaRERA portal: 12 Apr 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2024Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

AND ROSE is a Others project by ANANTNATH DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700019146 on 9 Jan 2019. The registration is recorded completed; possession was promised by 30 Jun 2024.

At a glance

Project

  • NameAND ROSE
  • TypeOthers
  • Location
    • Diva Agasan Road
    • Diva East
    • Thane (M Corp.)
    • Thane
    • 400612
  • Pincode400612
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700019146
  • ReraGenie IDRG-MH-73709

Builder

  • NameANANTNATH DEVELOPERS
  • Entity typePartnership
  • PartnersKalpraj Damji Dharamshi, Ravindra Raichand Dharamshi, Hemant Nanji Chheda, Rushabh Mukesh Chheda, Hemang Raichand Dharamshi
  • Other registrations3 more →
  • Completed3 of 4
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

this monthRegisteredJan 2019PromisedJun 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Jan 2019
  • Promised completion30 Jun 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed77 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ROSENA230000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

ROSE: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 12 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed32

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots32
Closed/Covered32

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,515 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI8376.92
Proposed, not sanctioned8,377 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchground flr Ravindra natya mandir kala academy prabhadevi 400025

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSameer S Lotke & Associates
EngineerS. S. CONS
Chartered AccountantR. J. LUTHIA & ASSOCIATES
Chartered AccountantSHAPARIA MEHTA & ASSOCIATES LLP
PartnerRole in project
ANANTNATH DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Dec 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 7 Nov 2024

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Other - TechnicalFile: Rose full OC order for RERA - 100325.pdf12 Apr 2025
Architect’s Certificate on Completion of Project (Form 4)File: Revised Form 4 Rose Building_Signed 281124.pdf29 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: AND ROSE - FORM 4.pdf14 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Rose OC 1.pdf7 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form5 202223.pdf4 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Cert.pdf30 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg Cer.pdf30 Sep 2023
Certificates of CA (Form 3)File: Form 3 CA Cert.pdf30 Sep 2023
Disclosure of sold/ booked inventoryFile: Rose Booked inventory march 2023.pdf30 Jun 2023
Layout approvalFile: Highlited rose Plan.pdf26 Jun 2023
Building plan approvalFile: Rose till 1st floor.pdf26 Jun 2023
Building plan approvalFile: Rose 2nd to 20th Floor.pdf26 Jun 2023
Copy of Layout Approval (in case of layout)File: Highlited rose Plan.pdf26 Jun 2023
Building Plan Approval (IOD)File: Rose till 1st floor.pdf26 Jun 2023
Building Plan Approval (IOD)File: Rose 2nd to 20th Floor.pdf26 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-March 23.pdf25 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-March 23.pdf25 May 2023
Certificates of CA (Form 3)File: Form-3-March 23.pdf25 May 2023
Declaration about Commencement CertificateFile: declaration CC.pdf29 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: Rose CC.pdf17 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert 310319.pdf17 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert 310320.pdf17 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert 310321.pdf17 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 310322.pdf17 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 300622.pdf17 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 300922.pdf17 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 311222.pdf17 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 310319.pdf17 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 310321.pdf17 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 310320.pdf17 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cert 310322.pdf17 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cert 300622.pdf17 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cert 300922.pdf17 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cert 311222.pdf17 Feb 2023
Certificates of CA (Form 3)File: CA Certificate 310319.pdf17 Feb 2023
Certificates of CA (Form 3)File: CA Certificate 310320.pdf17 Feb 2023
Certificates of CA (Form 3)File: CA Certificate 310321.pdf17 Feb 2023
Certificates of CA (Form 3)File: CA Certificate 310322.pdf17 Feb 2023
Certificates of CA (Form 3)File: CA Certificate 300622.pdf17 Feb 2023
Certificates of CA (Form 3)File: CA Certificate 300922.pdf17 Feb 2023
Certificates of CA (Form 3)File: CA Certificate 311222.pdf17 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 rose.pdf16 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form-5.pdf16 Feb 2023
Disclosure of sold/ booked inventoryFile: rose sold unsold disclosure .pdf16 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 AND Rose.pdf14 Oct 2021
Disclosure of sold/ booked inventoryFile: sold and unsold details.pdf13 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A-Quarter ending March 21.pdf23 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5-AND Rose.pdf25 Jan 2021
Form 2AFile: Form-2A-Quarter ending dec-19.pdf11 Jan 2020
Form 2AFile: Form-2A-Quarter ending Sept-19.pdf15 Oct 2019
Annual Audit Report of Statutory CA (Form 5)File: Form 5 rose.pdf30 Sep 2019
Form 2AFile: Form 2A-june-19.pdf30 Jul 2019
Form 2AFile: Form-2A-Quarter ending March 19.pdf6 Jun 2019
Layout approvalFile: PLAN_1.PDF18 May 2019
Building plan approvalFile: Plan_5.pdf18 May 2019
Building plan approvalFile: Plan_6.pdf18 May 2019
Copy of Layout Approval (in case of layout)File: PLAN_1.PDF18 May 2019
Building Plan Approval (IOD)File: Plan_5.pdf18 May 2019
Building Plan Approval (IOD)File: Plan_6.pdf18 May 2019
Commencement Certificates / NA Order for plotted developmentFile: PCC_COPY.pdf18 May 2019
Proforma of Allotment letterFile: Blank Rose Agg.pdf18 May 2019
Form 2AFile: Form-2A.pdf2 Jan 2019
Declaration in FORM BFile: Form B.pdf27 Dec 2018
Certificates of CA (Form 3)File: ca certificate.pdf27 Dec 2018
OtherFile: Co promotor non co-operation declaration.pdf27 Dec 2018
Building plan approvalFile: ROSE-GRND AND 1ST.pdf26 Dec 2018
Building plan approvalFile: Rose-2ND TO 19TH FLOOR.pdf26 Dec 2018
Layout approvalFile: layout.pdf26 Dec 2018
PAN CardFile: Pan card Anantnath Developers.pdf26 Dec 2018
Copy of the legal title reportFile: Title part-1.pdf26 Dec 2018
Copy of the legal title reportFile: Title part-2.pdf26 Dec 2018
Details of encumbrancesFile: no encumbrancs.pdf26 Dec 2018
Copy of Layout Approval (in case of layout)File: layout.pdf26 Dec 2018
Building Plan Approval (IOD)File: ROSE-GRND AND 1ST.pdf26 Dec 2018
Building Plan Approval (IOD)File: Rose-2ND TO 19TH FLOOR.pdf26 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: CC COPY.pdf26 Dec 2018
Proforma of Allotment letterFile: agreement not finalised declaration.pdf26 Dec 2018

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
AND SUNFLOWERSurvey no 167 Hissa No. 13 B Sunflower Building Village Agasan Diva East 400612146CompletedDec 2019Dec 2018
AND LOTUSSurvey No. 149 Hissa No. 1A Lotus Building Village Agasan Diva East 400612202CompletedMar 2016Late, May 2016

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AND ROSE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Diva East7,600+ in Thane

2 kmAND ROSECompleted 6Lapsed / revoked 4Other 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 16 registered projects within 2 km.

Builder: ANANTNATH DEVELOPERS

ANANTNATH DEVELOPERS has 4 registrations on MahaRERA, including AND SUNFLOWER and AND LILY. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if AND ROSE is delayed beyond 30 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AND ROSE?

The registered promoter entity is ANANTNATH DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AND ROSE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AND ROSE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AND ROSE?

The professionals named in the filing: Architect: Sameer S Lotke & Associates; Engineer: S. S. CONS; Chartered Accountant: R. J. LUTHIA & ASSOCIATES; Chartered Accountant: SHAPARIA MEHTA & ASSOCIATES LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AND ROSE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AND ROSE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AND ROSE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.