Home / Browse projects / Pune, Maharashtra / ANANTSRISHTI PHASE I

Completed No litigation declared Mixed project

ANANTSRISHTI PHASE I

By LANDSCAPE REALITY

RG-MH-12579 · RERA P52100006401 · Last updated on MahaRERA portal: 8 Apr 2023

Source: official MahaRERA filing

Red flags

  • 10 complaints at MahaRERA
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2020Possession promisedregistration recorded completed
88 of 88Construction stages doneacross 9 buildings; every applicable stage filed complete
1 of 123Units unsoldnot recorded sold or booked
10Complaints at MahaRERAon this registration
Jump to the 37 documents Report an error

ANANTSRISHTI PHASE I is a Mixed project by LANDSCAPE REALITY in Pune, Maharashtra, registered with MahaRERA as P52100006401 on 14 Aug 2017. The registration is recorded completed; possession was promised by 30 Sep 2020. The completion date has moved by 18 months from the original filing. 122 of the 123 units on this registration are recorded sold or booked, and 88 of 88 construction stages are filed complete. 10 complaints are on record with the regulator.

At a glance

Project

  • NameANANTSRISHTI PHASE I
  • TypeMixed
  • Location
    • TAKVE ROAD
    • JAMBHUL
    • Mawal
    • Pune
    • 412106
  • Pincode412106
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100006401
  • ReraGenie IDRG-MH-12579

Builder

  • NameLANDSCAPE REALITY
  • Entity typeCompany
  • DirectorPALLAVI AMIT VAIDYA
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2017First promiseMar 2019Revised toSep 2020Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Aug 2017
  • Promised completion30 Sep 2020
  • Revised completionRevised to 30 Sep 2020 (originally 31 Mar 2019)
  • Buildings8 building records
  • Documents filed37 files

Current status

99%122 of 123 units booked

Figures as on 8 Apr 2023, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
H WINGNA70000
I WINGNA70000
J WINGNA70000
Q WINGNA70000
K WINGNA90000
P WINGNA90000
C TYPE ROW HOUSENA10000
D TYPE ROW HOUSENA10000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building9

As on 8 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

88 of 88 construction stages are filed complete across 9 buildings.

H WING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
I WING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
J WING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Q WING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
K WING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
P WING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C TYPE ROW HOUSE100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D TYPE ROW HOUSE100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
NA Plot Without StructureNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 8 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes88%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes88%
Storm Water DrainsYes88%
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes75%
Solid Waste Management And DisposalYes75%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes80%
Open ParkingNoNot applicable

Parking filed240

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots240
Closed/Covered154
Open Space86
BuildingClosed/CoveredOpen SpaceTotal
H WING222547
I WING243963
J WING23528
Q WING23427
K WING23730
P WING23629
C TYPE ROW HOUSE808
D TYPE ROW HOUSE808

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area60,588 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI45859.0
Proposed, not sanctioned45,859 sq m
Buildings approved8
Buildings sanctioned8

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1444, SUKRAWAR PETH,THORALE BAJIRAO ROAD, PUNE-411002

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMilind Pokharkar & Associates
EngineerSUNIL MUTALIK
PartnerRole in project
LANDSCAPE REALITY-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100001872Mar 2019 → Mar 2020

Reason as filed by the promoterDear Sir / Madam, We, landscape Realty are developing residential and commercial project, Anantsrishti at village Jambhul, Gat no. 404 and 387, Taluka Maval, District Pune, PMRDA, Pune 412106 and we were due to complete the project on 31st March 2019. We hereby submit that since last 4-5 months we were not getting adequate labour on our site mentioned above. Due to shortage of required labour we were not able to attain expected construction within time as a result of which our project was delayed. We hereby state that we are now overcoming the difficulty and have resumed construction activity

Litigation declared3

CaseCourtStatus
515/2017Honarable civil judge senior division wadgaon mavalInjuction application rejected
CC005000000022472/2019The Maharashtra Real Estate Regulatory Authority Office at Bandra EastPosted for reply of Respondent
CC005000000022150/2019The Maharashtra Real Estate Regulatory Authority Office at Bandra EastPosted for reply of Respondent

Complaints filed with MahaRERA10

Case no.ComplainantRespondentFiled
CC005000000022150RAMESHWAR RADHESHYAM MANIYARLandscape Realty11/12/2018
CC005000000022472Ramchandra Dhondiba GawadeLandscape Realty20/01/2019
CC005000000064835Vidyadhar Jayant JoshiLandscap Realty15/11/2020
CC005000000064836RAHUL KAMALAKANT VAIDYALandscap Realty15/11/2020
CC005000000064837RAHUL KAMALAKANT VAIDYALandscap Realty15/11/2020
CC005000000064839ANAND V CHANDEKARLandscap Realty16/11/2020
CC005000000095785Mr. Shantaram Sudhakar ArvindekarLandscape Realty17/07/2021
CC005000000023124Shashikant Shridhar GawadeLandscape Realty11/06/2019
CC005000000033475DWARKADHISH DESHPANDE AND APARNA DESHPANDELANDSCAPE REALTY THROUGH AMOL DILIP TAVILDAR29/09/2019
CC005000000043797MAYURESH SHASHIKANT BHAVELANDSCAPE REALTY20/12/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Mar 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 3 Dec 2020

Documents filed37

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: ilovepdf_merged (1).pdf8 Apr 2023
Other - TechnicalFile: Quality assurance certificate.pdf8 Apr 2023
Disclosure of sold/ booked inventoryFile: Row House D - March 2023.pdf31 Mar 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society - Certificate - Plot and Row House -July 19.pdf3 Mar 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society - Certificate - Plot and Row House -July 19.pdf3 Mar 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Anantsrishti-H,I,J,Q- Society Certificate - Aug 2020 (1).pdf3 Mar 2023
Disclosure of sold/ booked inventoryFile: Disclosure_merged (1).pdf10 Jan 2023
Disclosure of sold/ booked inventoryFile: ilovepdf_merged (1).pdf21 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 01_Form I _ Phase I (1)_compressed.pdf16 Jul 2022
OtherFile: Anantsrishti-rera-complaync-may 2021-ajinkya-compressed.pdf3 Jun 2021
Certificates of CA (Form 5)File: FORM 5 AS.pdf23 Dec 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: P and K OC.pdf3 Dec 2020
Architect’s Certificate on Completion of Project (Form 4)File: 201008 - RERA Certificate - Form 4(Signed).pdf23 Nov 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC H and I.pdf5 Oct 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC J and Q.pdf5 Oct 2020
Certificates of CA (Form 5)File: AS-Form 5 2019.pdf14 Oct 2019
Certificates of CA (Form 5)File: LR_Form 5.pdf20 Feb 2019
Certificates of CA (Form 5)File: FORM 5 AS.pdf23 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch CertIFICATE PH-i.pdf29 Mar 2018
Layout approvalFile: compressed_Approved Layout.pdf23 Mar 2018
Copy of Layout Approval (in case of layout)File: compressed_Approved Layout.pdf23 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: compressed_180322-CC.pdf23 Mar 2018
Building plan approval or NA orderFile: IOD PLAN.pdf29 Jul 2017
Layout approvalFile: SANCTION PLAN LAYOUT.pdf29 Jul 2017
PAN CardFile: LANDSCAPE PAN CARD.pdf29 Jul 2017
Copy of the legal title reportFile: Anantsrishti Title Certificate.pdf29 Jul 2017
Details of encumbrancesFile: details of encumbrances-1.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: SANCTION PLAN LAYOUT.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD PLAN.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Anantsrishti Commencment certificate.pdf29 Jul 2017
Declaration in FORM BFile: B Form.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE PART 1.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE PART 2.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Anantsrishti Engineer's Certificate.pdf29 Jul 2017
Certificates of CA (Form 3)File: CA CERTIFICATE ANANTSRISHTI.pdf29 Jul 2017
Proforma of Allotment letterFile: LR Allotement Letter.pdf29 Jul 2017
Proforma of Allotment letterFile: Anantsrishti draft.pdf29 Jul 2017

How this compares with Pune

99%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 18 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ANANTSRISHTI PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near JAMBHUL13,700+ in Pune

2 kmANANTSRISHTI PHASE ICompleted 12Lapsed / revoked 16Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 30 registered projects within 2 km.

Builder: LANDSCAPE REALITY

LANDSCAPE REALITY has 3 registrations on MahaRERA, including ANANTSRISHTI PHASE I and ANANTSRISHTI PHASE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ANANTSRISHTI PHASE I is delayed beyond 30 Sep 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ANANTSRISHTI PHASE I?

The registered promoter entity is LANDSCAPE REALITY, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ANANTSRISHTI PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ANANTSRISHTI PHASE I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ANANTSRISHTI PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ANANTSRISHTI PHASE I?

The professionals named in the filing: Architect: Milind Pokharkar & Associates; Engineer: SUNIL MUTALIK. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ANANTSRISHTI PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANANTSRISHTI PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANANTSRISHTI PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.