Home / Browse projects / Udupi, Karnataka / ANANTHA SOVEREIGN

Registration approved No litigation declared Residential/Group Housing project

ANANTHA SOVEREIGN

By SOVEREIGN REALTIES

RG-KA-93842 · RERA PRM/KA/RERA/1273/318/PR/170726/008822 · Last updated on RERA Karnataka portal: 17 Jul 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2030Possession promisedno revision filed
0 of 16Construction stages donefurthest along: Earth work and other leveling..., 0%
48 of 48Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 83 documents Report an error

ANANTHA SOVEREIGN is a Residential/Group Housing project by SOVEREIGN REALTIES in Udupi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1273/318/PR/170726/008822 on 17 Jul 2026. Possession is promised by 31 Dec 2030. 0 of the 48 units on this registration are recorded sold or booked, and 0 of 16 construction stages are filed complete.

At a glance

Project

  • NameANANTHA SOVEREIGN
  • TypeResidential/Group Housing
  • Location
    • Udupi
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1273/318/PR/170726/008822
  • ReraGenie IDRG-KA-93842

Builder

  • NameSOVEREIGN REALTIES
  • Entity typePartnership Firm
  • GSTIN29AFWFS5762E1Z7
  • Authorized SignatoryKRISHNA BHAT P

Key dates

this monthRegisteredJul 2026PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on17 Jul 2026
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed83 files

Current status

0%0 of 48 units booked

Figures as on 17 Jul 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANANTHA SOVEREIGN---48048

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 17 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 16 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 0%.

Building: 0% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 17 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes-
Emergency Evacuation servicesYes-
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingNoNot applicable
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-
Common storage spacesNoNot applicable

Land and ownership3

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners3
LandownerVillageDistrict
RAGHAVENDRA R TANTRY & GEETHA R. TANTRY--
RAGHAVENDRA R TANTRY & GEETHA R. TANTRY--
RAGHAVENDRA R TANTRY & GEETHA R. TANTRY--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 9.25 cr
BuildingWingEstimatedIncurred
-NARs 9.25 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHALINI SURESH
EngineerRAVEENDRA ACHARYA
Chartered AccountantGANESH M KAMATH

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed83

As listed on the registration, under the names the promoter filed them with; the newest 80 of 83 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1273/318/PR/170726/008822 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
agreement of saleFile: Proforma AOS.pdf17 Jul 2026
mescom nocFile: mescom noc.jpeg17 Jul 2026
clarificationFile: IMG_20260717_0001.pdf17 Jul 2026
RTC, survey 32/35-
Mutation, survey 32/35-
Encumbrance Certificate, survey 32/35-
Conversion/Alienation Order, survey 32/35-
Sale/Title/Gift Deed, survey 32/35-
JDA, survey 32/35-
Khatha, survey 32/35-
RTC, survey 32/34-
Mutation, survey 32/34-
Encumbrance Certificate, survey 32/34-
Conversion/Alienation Order, survey 32/34-
Sale/Title/Gift Deed, survey 32/34-
JDA, survey 32/34-
Khatha, survey 32/34-
RTC, survey 32/33-
Mutation, survey 32/33-
Encumbrance Certificate, survey 32/33-
Conversion/Alienation Order, survey 32/33-
Sale/Title/Gift Deed, survey 32/33-
JDA, survey 32/33-
Khatha, survey 32/33-
Registration CertificateFile: firm registartion.pdf-
GST CertificateFile: GST.pdf-
Partnership DeedFile: Partnership deed.pdf-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: form 1 CA.pdf-
Certificate issued by Architect Form 2File: form 2 architect.pdf-
Certificate issued by Engineer Form 3File: FORM 3.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: litigation affidavit.pdf-
Balance Sheet 2024 - 2025File: BS AY 2026-27.pdf-
Audited Profit and Loss Statement 2024 - 2025File: PL AY 2026-27.pdf-
building licence-
approved plan-
single layout order-
stability certificate with licence and declaration-
specification-
Broucher-
relinguishment deed 1,2 & 3-
proforma AOS-
Proforma allottment letter-
form b-
affidavit 3(1)-
jda affidavit-
search report-
mescom noc-
Water noc-
UGD noc-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
estimation-
CDP plan-
Village map-
mescom noc fee receipt-
location map-
Septic tank drawing-
form 5 architect-
FORM 6-
carpet area statement-
declaration on borewell-
land cost sheet with guidance value-
1 partition deed 2000-
1 partition deed 2002-
1 supplement partition deed 2004-

How this compares with Udupi

0%of this project is bookeddistrict median 0%
22%of Udupi projects moved their completion datethis one has not
0%of Udupi registrations have lapsed or been cancelledthis one is on the register

Computed across the 260+ Udupi projects on ReraGenie, from their own filings.

Keep ANANTHA SOVEREIGN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Udupi260+ in Udupi

Builder: SOVEREIGN REALTIES

SOVEREIGN REALTIES has 1 registration on RERA Karnataka, including ANANTHA SOVEREIGN. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Udupi district page.

Frequently asked questions

What are my rights if ANANTHA SOVEREIGN is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of ANANTHA SOVEREIGN?

The registered promoter entity is SOVEREIGN REALTIES, a partnership firm as per the filing. Its GSTIN 29AFWFS5762E1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in ANANTHA SOVEREIGN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at ANANTHA SOVEREIGN?

The professionals named in the filing: Architect: SHALINI SURESH; Engineer: RAVEENDRA ACHARYA; Chartered Accountant: GANESH M KAMATH. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ANANTHA SOVEREIGN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANANTHA SOVEREIGN. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANANTHA SOVEREIGN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.