ANANTHA INFINITY is a Residential/Group Housing project by ABHAYA CONSTRUCTION in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/070823/006117 on 7 Aug 2023. Possession is promised by 10 Mar 2023.
At a glance
Project
- NameANANTHA INFINITY
- TypeResidential/Group Housing
- Location
- Mangalore
- Dakshina Kannada
- 575006
- Pincode575006
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1257/334/PR/070823/006117
- ReraGenie IDRG-KA-01556
Builder
- NameABHAYA CONSTRUCTION
- Entity typePartnership Firm
- Authorized SignatoryD ANANTHAYYA
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on7 Aug 2023
- Promised completion10 Mar 2023
- Revised completionNone
- Buildings1 building record
- Documents filed70 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ANANTHA INFINITY | - | - | - | 11 | 0 | 11 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 1 Aug 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | Not applicable |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities40
As on 1 Aug 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | No | Not applicable |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | No | Not applicable |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | - |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | No | Not applicable |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | No | Not applicable |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| D ANANTHAYYA | - | - |
| B SHEKARAPPA | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 1.74 cr | - |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 60.00 lakh | - |
| On-site expenditure-Consultants Fees | Rs 2.00 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ARAVIND RAO |
| Engineer | Aravind Rao |
| Chartered Accountant | MAHESHA KUMARA KODIMOOLE |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed70
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/070823/006117 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| CDP MapFile: CDP Map.pdf | 1 Aug 2023 |
| Certified Carpet AreaFile: Certified Carpet Area.pdf | 1 Aug 2023 |
| Firm Registration CertificateFile: Firm Registration Certificate.pdf | 1 Aug 2023 |
| Form_6File: Form_6.pdf | 1 Aug 2023 |
| Height of the building and FARFile: Height of the building and FAR.pdf | 1 Aug 2023 |
| MR copyFile: MR copy.pdf | 1 Aug 2023 |
| Non litigation AffidavitFile: Non litigation Affidavit.jpeg | 1 Aug 2023 |
| Order copyFile: Order copy.pdf | 1 Aug 2023 |
| Power NOCFile: Power NOC.pdf | 1 Aug 2023 |
| RTCFile: RTC.pdf | 1 Aug 2023 |
| Single Layout Plan and OrderFile: Single Layout Plan and Order.pdf | 1 Aug 2023 |
| SCAN COPYFile: SCAN COPY.pdf | 1 Aug 2023 |
| Water NOC with receiptFile: Water NOC with receipt.pdf | 1 Aug 2023 |
| Declaration LetterFile: Declaration Letter.pdf | 1 Aug 2023 |
| Power NOCFile: Power NOC.pdf | 1 Aug 2023 |
| Proforma Agreement for SaleFile: Proforma Agreement for Sale.pdf | 1 Aug 2023 |
| Proforma Allotment LetterFile: Proforma Allotment Letter.pdf | 1 Aug 2023 |
| Village MapFile: Village Map.jpeg | 1 Aug 2023 |
| Approved PlanFile: Approved Plan.pdf | 3 May 2023 |
| Commenecement Certificate and Plan Licence LetterFile: Commenecement Certificate and Plan Licence Letter.pdf | 3 May 2023 |
| Conversion OrderFile: Conversion Order.pdf | 3 May 2023 |
| EC Form 15File: EC Form 15.pdf | 3 May 2023 |
| Engineer LicenceFile: Engineer Licence.jpeg | 3 May 2023 |
| EstimateFile: Estimate.pdf | 3 May 2023 |
| Financial DetailsFile: Financial Details.pdf | 3 May 2023 |
| Guidance ValueFile: Guidance Value.pdf | 3 May 2023 |
| MOUFile: MOU.pdf | 3 May 2023 |
| Occupancy CertificateFile: Occupancy Certificate.pdf | 3 May 2023 |
| Relinquishment DeedFile: Relinquishment Deed.pdf | 3 May 2023 |
| RTCFile: RTC.pdf | 3 May 2023 |
| Sale DeedFile: Sale Deed.pdf | 3 May 2023 |
| Single Layout orderFile: Single Layout order.pdf | 3 May 2023 |
| Source of Fund 2File: Source of Fund 2.pdf | 3 May 2023 |
| Stability CertificateFile: Stability Certificate.pdf | 3 May 2023 |
| Title DeedFile: Title Deed.pdf | 3 May 2023 |
| 3(1) AffidavitFile: 3(1) Affidavit.pdf | 3 May 2023 |
| Form BFile: Form B.pdf | 3 May 2023 |
| DeclarationFile: Declaration.pdf | 3 May 2023 |
| Advocate Search ReportFile: Advocate search report.pdf | 24 Mar 2023 |
| CArpetFile: CARPET.pdf | 24 Mar 2023 |
| CDPFile: CDP.pdf | 24 Mar 2023 |
| RTCFile: RTC20230320_14101188.pdf | 24 Mar 2023 |
| siteFile: site20230208_19321215.pdf | 24 Mar 2023 |
| Stability CertificateFile: Stability Certificate.pdf | 24 Mar 2023 |
| RTC, survey 14/3(P7) | - |
| Mutation, survey 14/3(P7) | - |
| Encumbrance Certificate, survey 14/3(P7) | - |
| Conversion/Alienation Order, survey 14/3(P7) | - |
| Sale/Title/Gift Deed, survey 14/3(P7) | - |
| Khatha, survey 14/3(P7) | - |
| Registration CertificateFile: IMG-20230119-WA0019.jpg | - |
| Partnership DeedFile: Firm Registration Certificate.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by CA Form 1File: ca certificate_compressed (1).pdf | - |
| Certificate issued by Architect Form 2File: ENGINER20230116_19245112.pdf | - |
| Certificate issued by Engineer Form 3File: ENGINER20230116_19245112.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: ANANTHAYYA 320230116_19094296.pdf | - |
| Certificate from Chartered AccountFile: ca certificate_compressed (1).pdf | - |
| BUILDING SKETCH20230104_11081587 | - |
| BUILDING SKETCH20230104_11081587 | - |
| BUILDING SKETCH20230104_11081587 | - |
| ANANTHAYYA 120230116_19053052 | - |
| ANANTHAYYA 320230116_19094296 | - |
| ANANTHAYYA 220230116_19073128 | - |
| Occupancy CertificateFile: OC.pdf | - |
| Completion certificate issued by the competent authorityFile: OC.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Dakshina Kannada
Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.
Keep ANANTHA INFINITY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dakshina Kannada620+ in Dakshina Kannada
Filed coordinates, straight-line distance. 61 registered projects within 2 km.
LUCENT
M/s MOHTISHAM COMPLEXES PVT LTD
Rudraksh
Mukund MGM Realty
PRISTINE
Land Trades Builders and Developers
LOTUS ATHARVA
Lotus Properties
Kedar
Mukund MGM Realty
SOMAYAJI GREENWOOD
Somayaji Estates Private Limited
See every Dakshina Kannada project, with the district possession charts
Builder: ABHAYA CONSTRUCTION
ABHAYA CONSTRUCTION has 1 registration on RERA Karnataka, including ANANTHA INFINITY. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dakshina Kannada district page.
Frequently asked questions
What are my rights if ANANTHA INFINITY is delayed beyond 10 Mar 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of ANANTHA INFINITY?
The registered promoter entity is ABHAYA CONSTRUCTION, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in ANANTHA INFINITY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at ANANTHA INFINITY?
The professionals named in the filing: Architect: ARAVIND RAO; Engineer: Aravind Rao; Chartered Accountant: MAHESHA KUMARA KODIMOOLE. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ANANTHA INFINITY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback