Home / Browse projects / Nashik, Maharashtra / ANANTA ROW BUNGALOWS
ANANTA ROW BUNGALOWS
RG-MH-97358 · RERA P51600052533 · Last updated on MahaRERA portal: 18 Sep 2025
Source: official MahaRERA filing
Red flags
- Completion date moved by 6 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ANANTA ROW BUNGALOWS is a Residential / Group Housing project by KETAN SANTU CHAKANE in Nashik, Maharashtra, registered with MahaRERA as P51600052533 on 8 Sep 2023. The registration is recorded completed; possession was promised by 30 Sep 2025. The completion date has moved by 6 months from the original filing. 9 of the 22 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete.
At a glance
Project
- NameANANTA ROW BUNGALOWS
- TypeResidential / Group Housing
- Location
- PATHARDI SHIWAR
- NASHIK
- 422009
- Pincode422009
- RERA no.P51600052533
- ReraGenie IDRG-MH-97358
Builder
- NameKETAN SANTU CHAKANE
- Entity typeIndividual
- PartnersSandeep Santu Chakane, Harish Ambu Sanap, Ramdev Hariharprasad Pandey
- Other registrations1 more →
- Completed1 of 2
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on8 Sep 2023
- Promised completion30 Sep 2025
- Revised completionRevised to 30 Sep 2025 (originally 31 Mar 2025)
- Buildings2 building records
- Documents filed68 files
Current status
Figures as on 18 Sep 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ANANTA ROW BUNGALOWS - BLOCK A | NA | 2 | 2 | 11 | 0 | 11 |
| ANANTA ROW BUNGALOWS - BLOCK B | NA | 2 | 0 | 11 | 0 | 11 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 18 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 98%.
ANANTA ROW BUNGALOWS - BLOCK A81%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 98% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 98% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ANANTA ROW BUNGALOWS - BLOCK B81%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 98% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 98% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 18 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 95% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 95% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 95% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership3
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SANJANA SACHIN GANGURDE | Nashik | Nashik |
| RUSHABH SACHIN GANGURDE | Nashik | Nashik |
| SHUBHRATO SACHIN GANGURDE | Nashik | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ER RAJU GHODESWAR |
| Engineer | ASHISH DNYANESHWAR KALE |
| Chartered Accountant | NITIN MAHAJAN & CO |
| Chartered Accountant | ABHIJEET V PANGARKAR |
| Partner | Role in project |
|---|---|
| KETAN SANTU CHAKANE | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterConstruction of project is completed on time Dated 26.03.2025 so we need extension the project. We are writing to request an extension for the submission of the completed documents related to OC, Form 4 and Deed of Declaration Due to pending internal approvals, delays in document collection, or technical issues we have not yet been able to upload all the required documents. So we request you to please grant us extension till 30/09/2025. We are in process of completion of project.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Jun 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Jul 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Jun 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed68
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM -1-ANANTA.pdf | 18 Sep 2025 |
| Withdrawal Update Form 2File: Form-2.pdf | 18 Sep 2025 |
| Withdrawal Update Form 3File: Form -3.pdf | 18 Sep 2025 |
| Form 5 (FY 2024-2025)File: Ananta Form-5.pdf | 18 Sep 2025 |
| Occupational CertificateFile: OC, FORM-4 AND FORM2A.pdf | 18 Sep 2025 |
| Occupational CertificateFile: FULL OCCUPANCY CERTIFICATE (1).pdf | 18 Sep 2025 |
| Occupational CertificateFile: FORM -4-ANANTA.pdf | 18 Sep 2025 |
| Occupational CertificateFile: declaration Ananta banglow pathrdi-3mb.pdf | 18 Sep 2025 |
| Form 1File: FORM -1-ANANTA.pdf | 31 May 2025 |
| Form 2File: FORM -2-ANANTA.pdf | 31 May 2025 |
| Form 3File: Form -3.pdf | 31 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf | 31 May 2025 |
| OthersFile: COM FORM4 FORM2A.pdf | 31 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Ketan.pdf | 20 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 Ketan.pdf | 20 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 20 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 20 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold -June 24.pdf | 22 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold -Sept 24.pdf | 22 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - JUNE 2024 KETAN.pdf | 2 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - SEPT 2024 KETAN.pdf | 2 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - JUNE 2024 KETAN.pdf | 2 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rera Form-3- CA Certificate.pdf | 2 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - JUNE 2024 KETAN.pdf | 2 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - SEPT 2024 KETAN.pdf | 2 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 -anta.pdf | 11 Oct 2024 |
| Form 5 (FY 2023-2024)File: form 5 -anta.pdf | 5 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-31 03 2024.pdf | 22 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-31 03 2024.pdf | 22 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A-23-24.pdf | 22 May 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD-ANANTA.pdf | 22 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3-31 03 2024.pdf | 22 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1- ANANTA.pdf | 9 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2- ANANTA.pdf | 9 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD.pdf | 9 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3-KETAN.pdf | 9 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 ketan final.pdf | 23 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 KETAN.pdf | 22 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 KETAN.pdf | 22 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: sold unsold.pdf | 22 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosures of Interest in Other Estate Organization-final.pdf | 18 Aug 2023 |
| Proforma of Agreement for saleFile: AFS.pdf | 28 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 KETAN CHAKANE FINAL.pdf | 24 Jul 2023 |
| Proforma of Allotment letterFile: ALLOTEMENT LETTER.pdf | 21 Jul 2023 |
| Layout approvalFile: LAYOUT.pdf | 20 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: LAYOUT.pdf | 20 Jul 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEPRATE BANK DETAILS.pdf | 20 Jul 2023 |
| Details of encumbrances concerned to FinanceFile: DECLARATION OF ENCUMBRANCES CONCERNED TO FINANCE.pdf | 28 Jun 2023 |
| Details of encumbrances concerned to FinanceFile: DECLARATION OF ENCUMBRANCES CONCERNED TO LEGAL.pdf | 28 Jun 2023 |
| Details of encumbrances concerned to LegalFile: DECLARATION OF ENCUMBRANCES CONCERNED TO FINANCE.pdf | 28 Jun 2023 |
| Details of encumbrances concerned to LegalFile: DECLARATION OF ENCUMBRANCES CONCERNED TO LEGAL.pdf | 28 Jun 2023 |
| Declaration about Commencement CertificateFile: declaration about comencemet.pdf | 28 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 28 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 28 Jun 2023 |
| CERSAI detailsFile: cresai declaration.pdf | 28 Jun 2023 |
| Deviation Report with respect to Allotment letterFile: declaration of no deviation in model copy of allotment letter.pdf | 28 Jun 2023 |
| Deviation Report with respect to model copy of AgreementFile: declaration of no deviation agreement.pdf | 28 Jun 2023 |
| Building plan approvalFile: Project Plan Ananta-1_.pdf | 18 Jun 2023 |
| Building plan approvalFile: Project Plan- Ananta-2_.pdf | 18 Jun 2023 |
| Building plan approvalFile: Project Plan Ananta-3.pdf | 18 Jun 2023 |
| PAN CardFile: ketan pan.pdf | 18 Jun 2023 |
| Copy of the legal title reportFile: Legal Title Report_11zon.pdf | 18 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Project Plan Ananta-1_.pdf | 18 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Project Plan- Ananta-2_.pdf | 18 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Project Plan Ananta-3.pdf | 18 Jun 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 18 Jun 2023 |
| Declaration in FORM BFile: FORM-B KETAN CHAKANE.pdf | 18 Jun 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200271048619_For_Asset_Based_Search_10_06_2023_10_40_30_246.pdf | 18 Jun 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 68 filed documents as one ZIP, foldered, with a manifest
Keep ANANTA ROW BUNGALOWS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NASHIK4,100+ in Nashik
STAR WORLD
DEEPAK KALYANJI CHANDE
VRAJ CENTRAL VISTA
DHAIRYA DEVELOPERS
ROONGTA TECHONE APARTMENT
SHREE TIRUMALA BUILDCON
VRAJ CAPITAL
KAPILAVASTU CREATORS
MAA BHAGWATI RESIDENCY APARTMENT
ROONGTA LANDMARKS LLP
THREE LEAVES PHASE ONE
DEEPAK INFRA AND HOMES PRIVATE LIMITED
See every Nashik project, with the district possession charts
Builder: KETAN SANTU CHAKANE
KETAN SANTU CHAKANE has 2 registrations on MahaRERA, including ANANTA ROW BUNGALOWS and SHREE MATESHWARI VISHWA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if ANANTA ROW BUNGALOWS is delayed beyond 30 Sep 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ANANTA ROW BUNGALOWS?
The registered promoter entity is KETAN SANTU CHAKANE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ANANTA ROW BUNGALOWS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ANANTA ROW BUNGALOWS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ANANTA ROW BUNGALOWS?
The professionals named in the filing: Architect: ER RAJU GHODESWAR; Engineer: ASHISH DNYANESHWAR KALE; Chartered Accountant: NITIN MAHAJAN & CO; Chartered Accountant: ABHIJEET V PANGARKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ANANTA ROW BUNGALOWS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback