Home / Browse projects / Pune, Maharashtra / ANANT HOMES

Registered No litigation declared Residential / Group Housing project

ANANT HOMES

By Nilesh Construction

RG-MH-22204 · RERA P52100030724 · Last updated on MahaRERA portal: 20 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 38 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 38 months from the original
18 of 44Construction stages doneacross 4 buildings; furthest along: External plumbing and external plaster, 90%
78 of 80Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

ANANT HOMES is a Residential / Group Housing project by Nilesh Construction in Pune, Maharashtra, registered with MahaRERA as P52100030724 on 8 Sep 2021. Possession is promised by 31 Dec 2028. The completion date has moved by 38 months from the original filing. 2 of the 80 units on this registration are recorded sold or booked, and 18 of 44 construction stages are filed complete.

At a glance

Project

  • NameANANT HOMES
  • TypeResidential / Group Housing
  • Location
    • Handewadi Road
    • Hadapsar
    • Haveli
    • Pune
    • 411028
  • Pincode411028
  • RERA no.P52100030724
  • ReraGenie IDRG-MH-22204

Builder

  • NameNilesh Construction
  • Entity typeOthers
  • Named personShekhar Pillu Binawat

Key dates

this monthRegisteredSep 2021First promiseOct 2025Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Sep 2021
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 31 Oct 2025)
  • Buildings4 building records
  • Documents filed67 files

Current status

2%2 of 80 units booked
19.5%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing - ANA6520020
Wing - BNA7520020
Wing - CNA7520020
Wing - DNA6520020

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is External plumbing and external plaster, at 90%.

Wing - A33%
ActivityProgress
Excavation100%
Basement (if any)70%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing - B81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing - C80%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing - D11%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth25%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed36

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots36
Closed/Covered22
Open Space14
BuildingClosed/CoveredOpen SpaceTotal
Wing - A808
Wing - B3710
Wing - C3710
Wing - D808

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,568 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Nov 2025
LandownerVillageDistrict
Ajay Madhukar ShikarePune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI4406.2
Proposed, not sanctioned4,406 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHadapsar, Pune - 411028
Estimated costRs 18.00 cr
Cost incurredRs 3.50 cr
Work done19.46%
BuildingWingEstimatedIncurred
Wing - ANARs 4.12 crRs 26.24 lakh
Wing - BNARs 4.12 crRs 1.49 cr
Wing - CNARs 4.12 crRs 1.49 cr
Wing - DNARs 4.12 crRs 26.24 lakh
-NARs 1.50 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCubix Architects Associates
EngineerStructure Vizion
EngineerSHRAVAN RATHI
Chartered AccountantAbhijit Khade and Associates
Chartered AccountantJEEVAN PRAKASH CHOUHAN
Chartered AccountantA S JANGADA & ASSOCIATES
PartnerRole in project
Nilesh Construction-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA21012619526Oct 2025 → Dec 2028

Reason as filed by the promoterGrounds and Reasons for delay in completion of project: a) This project nearby area was underdeveloped, there was a lack of basic amenities such as roads, drainage, electricity, and water. This made it difficult for us to get bookings for this project. That's was we have facing in more financial trouble. b) We have maximum tried to take booking but we not success in this. In between we have stop the construction work in some period. c) However, now that these basic necessities like roads, electricity, water, and drainage have been provided in this area. Right now we have possible to take new b

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 Q1 26-27.pdf20 Jul 2026
Withdrawal Update Form 2File: Form 2 Q1 26-27.pdf20 Jul 2026
Withdrawal Update Form 3File: FORM 3 Q1 26-27.pdf20 Jul 2026
Withdrawal Update Form 1File: Form 1.pdf4 May 2026
Withdrawal Update Form 2File: Form 2.pdf4 May 2026
Withdrawal Update Form 3File: Form 3.pdf4 May 2026
Form 2A (FY 2021-2022)File: Form 2A Anant Homes FY 21-22.pdf24 Jan 2026
Form 2A (FY 2022-2023)File: Form 2A Anant Homes FY 22-23.pdf24 Jan 2026
Form 2A (FY 2023-2024)File: Form 2A Anant Homes FY 23-24.pdf24 Jan 2026
Form 2A (FY 2024-2025)File: Form 2A Anant Homes FY 24-25.pdf24 Jan 2026
Form 5 (FY 2021-2022)File: Form 5 21-22 .pdf23 Jan 2026
Form 5 (FY 2022-2023)File: Form 5 22-23.pdf23 Jan 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate Anant Homes 10-1-26.pdf20 Jan 2026
Withdrawal Update Form 2File: ER - Dec 25 .pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 CA Certificate Anant Homes 17-1-26.pdf20 Jan 2026
Withdrawal Update Form 1File: AR - June 25.pdf19 Dec 2025
Withdrawal Update Form 1File: AR - sept 25.pdf19 Dec 2025
Withdrawal Update Form 2File: ER - June 25 - New.pdf19 Dec 2025
Withdrawal Update Form 2File: ER - sept 25 - New.pdf19 Dec 2025
Withdrawal Update Form 3File: CA - June 25 - New.pdf19 Dec 2025
Withdrawal Update Form 3File: CA - Sept 25 -New.pdf19 Dec 2025
Form 5 (FY 2023-2024)File: RERA audit report - 23-24.pdf16 Dec 2025
Form 5 (FY 2024-2025)File: Signed RERA audit report - 24-25.pdf16 Dec 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 14 CA FORM 3 CERT JAN TO MAR 25 upload.pdf28 Apr 2025
Proforma of Allotment letterFile: Proforma Draft Allotment Letter Anant Homes.pdf20 Apr 2025
CERSAI detailsFile: CERSAI_Search_Report_200348912479_For_Asset_Based_Search_06_04_2025_20_44_53_417.pdf20 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration about Seperate Bank Ac.pdf20 Apr 2025
Proforma of Agreement for saleFile: Draft Agreement to Sale Anant Homes.pdf20 Apr 2025
Details of encumbrances concerned to FinanceFile: Self Declaration No Encumbrance Legal.pdf7 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 02 CA FORM 3 RERA CERT UPTO 2022.pdf7 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 03 CA FORM 3 CERT APR TO JUN 22.pdf7 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 05 CA FORM 3 CERT OCT TO DEC 22.pdf7 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 06 CA FORM 3 CERT JAN TO MAR 23.pdf7 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 04 CA FORM 3 CERT JUL TO SEPT 22.pdf7 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 07 CA FORM 3 CERT APR TO JUN 23.pdf7 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 08 CA FORM 3 CERT JUL TO SEP 23.pdf7 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 09 CA FORM 3 CERT OCT TO DEC 23.pdf7 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10 CA FORM 3 CERT JAN TO MAR 24.pdf7 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 11 CA FORM 3 CERT APR TO JUN 24.pdf7 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 12 CA FORM 3 CERT JUL TO SEP 24.pdf7 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate of Nilesh Construction Anant Homes.pdf7 Apr 2025
Details of encumbrances concerned to LegalFile: Self Declaration No Encumbrance Legal.pdf7 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest OREO.pdf7 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 02 CA FORM 3 RERA CERT UPTO 2022.pdf7 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1st Engineer Certificate of Nilesh Construction (Anant Homes) (15-10-2023).pdf21 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2nd Engineer Certificate of Nilesh Construction (Anant Homes) (10-01-2024).pdf21 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3rd Engineer Certificate of Nilesh Construction (Anant Homes) (12-04-2024).pdf21 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4th Engineer Certificate of Nilesh Construction (Anant Homes) (16-07-2024).pdf21 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5th Engineer Certificate of Nilesh Construction (Anant Homes) (10-10-2024).pdf21 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6th Engineer Certificate of Nilesh Construction (Anant Homes) (15-01-2025).pdf21 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1 Oct-Dec 2023.pdf1 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1 Jan-Mar 2024.pdf1 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1 Apr-Jun 2024.pdf1 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1 Jul-Sep 2024.pdf1 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1 Oct-Dec 2024.pdf1 Mar 2025
Copy of the legal title reportFile: Title Search Report Annexure.pdf21 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf21 Aug 2021
Proforma of Allotment letterFile: Sample Agreement.pdf21 Aug 2021
Layout approvalFile: Layout.pdf19 Aug 2021
Building plan approvalFile: Plan.pdf19 Aug 2021
PAN CardFile: PAN Card.pdf19 Aug 2021
Details of encumbrancesFile: Encumbrance Certificate.pdf19 Aug 2021
Copy of Layout Approval (in case of layout)File: Layout.pdf19 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan.pdf19 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf19 Aug 2021
Declaration about Commencement CertificateFile: Format D.pdf19 Aug 2021
Declaration in FORM BFile: Form B.pdf19 Aug 2021

How this compares with Pune

2%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 38 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ANANT HOMES on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hadapsar13,700+ in Pune

Builder: Nilesh Construction

Nilesh Construction has 1 registration on MahaRERA, including ANANT HOMES. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ANANT HOMES is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ANANT HOMES?

The registered promoter entity is Nilesh Construction, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ANANT HOMES?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ANANT HOMES?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ANANT HOMES?

The professionals named in the filing: Architect: Cubix Architects Associates; Engineer: Structure Vizion; Engineer: SHRAVAN RATHI; Chartered Accountant: Abhijit Khade and Associates; Chartered Accountant: JEEVAN PRAKASH CHOUHAN; Chartered Accountant: A S JANGADA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ANANT HOMES?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANANT HOMES. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANANT HOMES to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.