Home / Browse projects / Thane, Maharashtra / Anand Bhavan Co op Hsg.

Registered No litigation declared Others project

Anand Bhavan Co op Hsg.

By Shri Swami Samarth Developers

RG-MH-21714 · RERA P51700023371 · Last updated on MahaRERA portal: 24 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 30 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 30 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 67%
79 of 98Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 174 documents Report an error

Anand Bhavan Co op Hsg. is a Others project by Shri Swami Samarth Developers in Thane, Maharashtra, registered with MahaRERA as P51700023371 on 12 Dec 2019. Possession is promised by 30 Jun 2027. The completion date has moved by 30 months from the original filing. 19 of the 98 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameAnand Bhavan Co op Hsg.
  • TypeOthers
  • Location
    • PANCHPAKHADI
    • BHAKTI MANDIR ROAD
    • Thane (M Corp.)
    • Thane
    • 400602
  • Pincode400602
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700023371
  • ReraGenie IDRG-MH-21714

Builder

  • NameShri Swami Samarth Developers
  • Entity typePartnership
  • PartnersSUNIL PARSHURAM YADAV, SIDDESH SUNIL YADAV
  • Other registrations3 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredDec 2019First promiseDec 2024Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Dec 2019
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 30 Dec 2024)
  • Buildings1 building record
  • Documents filed174 files

Current status

19%19 of 98 units booked
71.1%Work done, per cost certificate

Figures as on 24 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Anand Bhavan Co Op HsgNA1717871198

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 67%.

Anand Bhavan Co Op Hsg: 56% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure67%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises36%
Sanitary Fittings within the flats / premises26%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks44%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.22%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 24 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes13%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes20%
Electrical meter room, sub-station, receiving stationYes22%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed149

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots149
Closed/Covered146
Open Space3

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,897 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 May 2026

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI7580.41
Proposed, not sanctioned7,580 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Saurabh CHS Ltd, Off Service Road, Near Modi Hyundai Showroom, Thane, Maharashtra 400602
Estimated costRs 11.97 cr
Cost incurredRs 8.51 cr
Work done71.12%
BuildingWingEstimatedIncurred
Anand Bhavan Co Op HsgNARs 11.97 crRs 8.51 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectInnovative Design Architects
EngineerPentacon Structural Consultants Pvt. Ltd.
Chartered AccountantVipul V. Bhandari
Chartered AccountantR H Pothiwal & Associates
PartnerRole in project
Shri Swami Samarth Developers-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700024416Dec 2024 → Jun 2026

Reason as filed by the promotera) Residential Project is not completed. b) Due to COVID-19 pandemic, the regular flow of work is hampered on account of unavailability of labor on regular basis. c) Lack of manpower and labour supply post covid time. Most of the labourers were away and hence we had a very bad time to reestablish the work momentum. d) We request you to extend the project completion date to 30/06/2026.

EA30052621166Dec 2024 → Jun 2027

Reason as filed by the promoterThere were liquidity issues and delays in funding. Labour and material shortages, along with disruptions in supply chains and workforce availability, are impacting construction timelines.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Nov 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 21 Mar 2024

Documents filed174

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 174 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: June-2026 Architect Certificate Anand Bhavan.pdf24 Jul 2026
Withdrawal Update Form 2File: June 2026 Engineer Certificate Anand Bhavan.pdf24 Jul 2026
Withdrawal Update Form 3File: june 2026 CA Certificate.pdf24 Jul 2026
Form 5 (FY 2024-2025)File: RERA Audit Report_24-25.pdf15 Jun 2026
Withdrawal Update Form 1File: Form 1_March 26.pdf24 Apr 2026
Withdrawal Update Form 2File: Form 2_March 26.pdf24 Apr 2026
Withdrawal Update Form 3File: Form 3_March 26.pdf24 Apr 2026
Withdrawal Update Form 1File: Architect Certificate Dec 25.pdf29 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate Dec 25.pdf29 Jan 2026
Withdrawal Update Form 3File: CA Certificate Dec 25.pdf29 Jan 2026
Withdrawal Update Form 1File: Architect Certificate Sep 25.pdf15 Dec 2025
Withdrawal Update Form 2File: Engineer Certificate Sep 25.pdf15 Dec 2025
Withdrawal Update Form 3File: CA Certiifcate_Sep 25.pdf15 Dec 2025
Form 1File: Form 1 Jun-22.pdf23 Aug 2025
Form 2File: Form-2 Jun 22.pdf23 Aug 2025
Form 3File: 5 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf23 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold_ booked inventory.pdf23 Aug 2025
Form 1File: Form 1 Spe-22.pdf23 Aug 2025
Form 2File: Form-2 Sep 22.pdf23 Aug 2025
Form 3File: Form-3 Sep-22.pdf23 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold_ booked inventory.pdf23 Aug 2025
Form 1File: Form 1 Dec-22.pdf23 Aug 2025
Form 2File: Form-3 Dec-22.pdf23 Aug 2025
Form 3File: Form-3 Dec-22.pdf23 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold_ booked inventory.pdf23 Aug 2025
Form 3File: Form-3 Mar-23.pdf23 Aug 2025
Disclosure of Sold and Booked InventoryFile: Mar-23 Disclosure of sold_ booked inventory.pdf23 Aug 2025
Form 1File: Form 1 Mar 23.pdf23 Aug 2025
Form 2File: Form-2 Mar-23.pdf23 Aug 2025
Form 1File: Form 1 Jun-23.pdf23 Aug 2025
Form 2File: Form-2 Jun-23.pdf23 Aug 2025
Form 3File: Form-3 Jun-23.pdf23 Aug 2025
Disclosure of Sold and Booked InventoryFile: Jun-23 Disclosure of sold_ booked inventory.pdf23 Aug 2025
Form 1File: Form 1 Sep-23.pdf23 Aug 2025
Form 2File: Form-2 Sep 23.pdf23 Aug 2025
Form 3File: Form-3 Sep-23.pdf23 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sep-23 Disclosure of sold_ booked inventory.pdf23 Aug 2025
Form 1File: Form 1 Dec-23.pdf23 Aug 2025
Form 2File: Form-2 Dec 23.pdf23 Aug 2025
Form 3File: Form-3 Dec-23.pdf23 Aug 2025
Disclosure of Sold and Booked InventoryFile: Dec-23 Disclosure of sold_ booked inventory.pdf23 Aug 2025
Form 1File: Form 1 Mar-24.pdf23 Aug 2025
Form 2File: Form-2 Mar 24.pdf23 Aug 2025
Form 3File: Form-3 Mar-24.pdf23 Aug 2025
Disclosure of Sold and Booked InventoryFile: Mar 24 Disclosure of sold_ booked inventory.pdf23 Aug 2025
Form 2File: Form-2 Jun 24.pdf23 Aug 2025
Form 1File: Form-1 Jun-24.pdf23 Aug 2025
Form 3File: Form-3 Jun-24.pdf23 Aug 2025
Disclosure of Sold and Booked InventoryFile: Jun-24 Disclosure of sold_ booked inventory.pdf23 Aug 2025
Form 1File: Form-1 Sep-24.pdf23 Aug 2025
Form 2File: Form-2 Sep 24.pdf23 Aug 2025
Form 3File: Form-3 Sep-24.pdf23 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sep-24 Disclosure of sold_ booked inventory.pdf23 Aug 2025
Form 1File: Form-1 Dec-24.pdf23 Aug 2025
Form 2File: Form-2 Dec 24.pdf23 Aug 2025
Form 3File: Form-3 Dec-24.pdf23 Aug 2025
Disclosure of Sold and Booked InventoryFile: Dec-24 Disclosure of sold_ booked inventory.pdf23 Aug 2025
Form 1File: Form-1 Mar-25.pdf23 Aug 2025
Form 2File: Form-2 Mar 25.pdf23 Aug 2025
Form 3File: Form-3 Mar-25.pdf23 Aug 2025
Disclosure of Sold and Booked InventoryFile: Mar-25 Disclosure of sold_ booked inventory.pdf23 Aug 2025
Withdrawal Update Form 1File: Form-1.pdf23 Aug 2025
Withdrawal Update Form 2File: Form-2.pdf23 Aug 2025
Withdrawal Update Form 3File: Form-3.pdf23 Aug 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked inventory.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate- March 25.pdf25 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate March 25.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate March 25.pdf25 Apr 2025
Building plan approvalFile: CC COPY 2024 and Plan-7-9_compressed-1-2.pdf8 Apr 2025
Building plan approvalFile: CC COPY 2024 and Plan-7-9_compressed-3.pdf8 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: CC COPY 2024 and Plan-7-9_compressed-1-2.pdf8 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: CC COPY 2024 and Plan-7-9_compressed-3.pdf8 Apr 2025
Building plan approvalFile: 3 Project Information (1).pdf8 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: 2 Project Information.pdf8 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 3 Project Information (1).pdf8 Mar 2025
Disclosure of sold/ booked inventoryFile: Sept 24 -Anandbhavan.pdf8 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold inventory 30-06-2023.pdf8 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold inventory 31-12-2023.pdf8 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold inventory 31-03-2024.pdf8 Mar 2025
Declaration about Commencement CertificateFile: Declaration about CC.pdf8 Mar 2025

How this compares with Thane

19%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 30 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Anand Bhavan Co op Hsg. on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHAKTI MANDIR ROAD7,600+ in Thane

2 kmAnand Bhavan Co op Hsg.Completed 122Lapsed / revoked 78Other 161Dot size: filed unitsN

Filed coordinates, straight-line distance. 361 registered projects within 2 km.

Builder: Shri Swami Samarth Developers

Shri Swami Samarth Developers has 4 registrations on MahaRERA, including MAULI APARTMENT and Anand Bhavan Co op Hsg.. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Anand Bhavan Co op Hsg. is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Anand Bhavan Co op Hsg.?

The registered promoter entity is Shri Swami Samarth Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Anand Bhavan Co op Hsg.?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Anand Bhavan Co op Hsg.?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Anand Bhavan Co op Hsg.?

The professionals named in the filing: Architect: Innovative Design Architects; Engineer: Pentacon Structural Consultants Pvt. Ltd.; Chartered Accountant: Vipul V. Bhandari; Chartered Accountant: R H Pothiwal & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Anand Bhavan Co op Hsg.?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Anand Bhavan Co op Hsg.. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Anand Bhavan Co op Hsg. to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.