Amrut Heights

By Amrut Heights LLP

RG-MH-96693 · RERA P51700045956 · Last updated on MahaRERA portal: 17 Jan 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 36 months from the original
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 0%
30 of 41Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 92 documents Report an error

Amrut Heights is a Others project by Amrut Heights LLP in Thane, Maharashtra, registered with MahaRERA as P51700045956 on 15 Jun 2022. Possession is promised by 31 Dec 2028. The completion date has moved by 36 months from the original filing. 11 of the 41 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete.

At a glance

Project

  • NameAmrut Heights
  • TypeOthers
  • Location
    • Bazar Peth
    • Kalyan
    • Kalyan-Dombivali (M Corp.)
    • Thane
    • 421301
  • Pincode421301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700045956
  • ReraGenie IDRG-MH-96693

Builder

  • NameAmrut Heights LLP
  • Entity typePartnership
  • PartnersManish Chandulal Choksi, Ashwin Mulchand Patel, Chirag Vinod Patel, Kulin Hemendra Patel, Hemendra Mulchand Patel, Vinod Mulchand Patel, Ujwal Mulchand Patel

Key dates

this monthRegisteredJun 2022First promiseDec 2025Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Jun 2022
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 31 Dec 2025)
  • Buildings2 building records
  • Documents filed92 files

Current status

27%11 of 41 units booked
65.5%Work done, per cost certificate

Figures as on 17 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Amrut Heights A WingNA545813
Amrut Heights B WingNA8728028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 17 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.

Amrut Heights A Wing0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Amrut Heights B Wing0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed4

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots4
Closed/Covered4

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area514 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Jun 2025
LandownerVillageDistrict
Manish Chandulal ChoksiMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityKALYAN DOMBIVALI MUNICIPAL CORPORATION
Permissible FSI2096.17
Proposed, not sanctioned2,021 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMumbai
Estimated costRs 5.50 cr
Cost incurredRs 3.60 cr
Work done65.5%
BuildingWingEstimatedIncurred
Amrut Heights B WingNARs 5.50 crRs 3.60 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDe Con Consultant
EngineerPentacon Structural Consultants Pvt Ltd
Chartered AccountantR C Shah & Co
Chartered AccountantVISHWAKARMA AND CO
Chartered AccountantAMIT PAUL & ASSOCIATES
PartnerRole in project
Amrut Heights LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA04022619713Dec 2025 → Dec 2028

Reason as filed by the promoterIncreased financial liabilities towards lenders, vendors, and statutory authorities, which were required to be prioritized to ensure continuation of construction and protection of allottees’ interests. Escalation in construction costs, including material and labour expenses, which significantly impacted project finances.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed92

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 14_FORM 1_30 Sept 25 Anxture A (From-1).pdf17 Jan 2026
Withdrawal Update Form 1File: 14_FORM 1_30 Sept 25 Anxture A (From-1).pdf17 Jan 2026
Withdrawal Update Form 1File: 14_FORM 1_30 Sept 25 Anxture A (From-1).pdf17 Jan 2026
Withdrawal Update Form 1File: 14_FORM 1_30 Sept 25 Anxture A (From-1).pdf17 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf17 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf17 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf17 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf17 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf17 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf17 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf17 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf17 Jan 2026
Form 5 (FY 2022-2023)File: FORM 5_22-23.pdf7 Dec 2025
Form 5 (FY 2023-2024)File: FORM 5_23-24.pdf7 Dec 2025
Form 5 (FY 2024-2025)File: FORM 5_24-25.pdf7 Dec 2025
Form 1File: 13_FORM 1_30 jun 25.pdf12 Aug 2025
Form 2File: 13_FORM 2_30 jun 25.pdf12 Aug 2025
Form 3File: 13_30-jun-2025.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: 13_SOLD_UNSOLD_INVENTORY.pdf12 Aug 2025
Form 1File: 1_FORM 1_30 Jun 22.pdf10 Aug 2025
Form 2File: 1_FORM 2_30 june 22.pdf10 Aug 2025
Form 3File: 1_30-jun- 2022.pdf10 Aug 2025
Disclosure of Sold and Booked InventoryFile: 1_SOLD_UNSOLD_INVENTORY.pdf10 Aug 2025
Form 1File: 2_FORM 1_30 Sept 22.pdf10 Aug 2025
Form 2File: 2_FORM 2_30 Sep 22.pdf10 Aug 2025
Form 3File: 2_30-sep-22.pdf10 Aug 2025
Disclosure of Sold and Booked InventoryFile: 2_SOLD_UNSOLD_INVENTORY.pdf10 Aug 2025
Form 1File: 3_FORM 1_31 Dec 22.pdf10 Aug 2025
Form 2File: 3_FORM 2_31 Dec 22.pdf10 Aug 2025
Form 3File: 3_31-dec-2022.pdf10 Aug 2025
Disclosure of Sold and Booked InventoryFile: 3_SOLD_UNSOLD_INVENTORY.pdf10 Aug 2025
Form 1File: 4_FORM 1_31 Mar 23.pdf10 Aug 2025
Form 2File: 4_FORM 2_31 Mar 23.pdf10 Aug 2025
Form 3File: 4_31-Mar-23.pdf10 Aug 2025
Disclosure of Sold and Booked InventoryFile: 4_SOLD_UNSOLD_INVENTORY.pdf10 Aug 2025
Form 1File: 5_FORM 1_30 jun 23.pdf10 Aug 2025
Form 2File: 5_FORM 2_30 june 23.pdf10 Aug 2025
Form 3File: 5_30-jun-2023.pdf10 Aug 2025
Disclosure of Sold and Booked InventoryFile: 5_SOLD_UNSOLD_INVENTORY.pdf10 Aug 2025
Form 1File: 6_FORM 1_30 sept 23.pdf10 Aug 2025
Form 2File: 6_FORM 2_30 Sep 23.pdf10 Aug 2025
Form 3File: 6_30-Sep 23.pdf10 Aug 2025
Disclosure of Sold and Booked InventoryFile: 6_SOLD_UNSOLD_INVENTORY.pdf10 Aug 2025
Form 1File: 7_FORM 1_23 dec 23.pdf10 Aug 2025
Form 2File: 7_FORM 2_31 Dec 23.pdf10 Aug 2025
Form 3File: 7_31-Dec-2023.pdf10 Aug 2025
Disclosure of Sold and Booked InventoryFile: 7_SOLD_UNSOLD_INVENTORY.pdf10 Aug 2025
Form 1File: 8_FORM 1_31 mar 24.pdf10 Aug 2025
Form 2File: 8_FORM 2_31 Mar 24.pdf10 Aug 2025
Form 3File: 8_31-Mar-24.pdf10 Aug 2025
Disclosure of Sold and Booked InventoryFile: 8_SOLD_UNSOLD_INVENTORY.pdf10 Aug 2025
Form 1File: 9_FORM 1_30 june 24.pdf10 Aug 2025
Form 2File: 9_FORM 2_30 june 24.pdf10 Aug 2025
Form 3File: 9_Form 3 30-06-2024.pdf10 Aug 2025
Disclosure of Sold and Booked InventoryFile: 9_SOLD_UNSOLD_INVENTORY.pdf10 Aug 2025
Form 1File: 10_FORM 1_30 sept 24.pdf10 Aug 2025
Form 2File: 10_FORM 2_30 Sep 24.pdf10 Aug 2025
Form 3File: 10_30-Sep 24.pdf10 Aug 2025
Disclosure of Sold and Booked InventoryFile: 10_SOLD_UNSOLD_INVENTORY.pdf10 Aug 2025
Form 1File: 11_FORM 1_31 Dec 24.pdf10 Aug 2025
Form 2File: 11_FORM 2_31 Dec 24.pdf10 Aug 2025
Form 3File: 11_31-dec-2024.pdf10 Aug 2025
Disclosure of Sold and Booked InventoryFile: 11_SOLD_UNSOLD_INVENTORY.pdf10 Aug 2025
Form 1File: 12_FORM 1_31 mar 25.pdf10 Aug 2025
Form 2File: 12_FORM 2_31 Mar 25.pdf10 Aug 2025
Form 3File: 12_31-Mar-25.pdf10 Aug 2025
Disclosure of Sold and Booked InventoryFile: 12_SOLD_UNSOLD_INVENTORY.pdf10 Aug 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf21 Aug 2023
Disclosure of sold/ booked inventoryFile: Amrut sold unsold dated 31072023.pdf21 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Amrut annexure A.pdf21 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Amrut declaration about bank account.pdf21 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 12 Form 3CA Certificate.pdf6 Jun 2022
CERSAI detailsFile: CERSAI_Search_Report_200238766332_For_Asset_Based_Search_03_06_2022_11_20_51_869.pdf3 Jun 2022
Layout approvalFile: 4 Layout Plan.pdf1 Jun 2022
Building plan approvalFile: 5 Approval Plan1.pdf1 Jun 2022
Building plan approvalFile: 5 Approval Plan2.pdf1 Jun 2022
PAN CardFile: 1 Pan Card Amrut Heights.pdf1 Jun 2022
Copy of the legal title reportFile: 2 Title Certificate Rera.pdf1 Jun 2022
Details of encumbrancesFile: 3 Encumbrances.pdf1 Jun 2022
Copy of Layout Approval (in case of layout)File: 4 Layout Plan.pdf1 Jun 2022

How this compares with Thane

27%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 36 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Amrut Heights on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kalyan7,600+ in Thane

2 kmAmrut HeightsCompleted 54Lapsed / revoked 34Other 92Dot size: filed unitsN

Filed coordinates, straight-line distance. 180 registered projects within 2 km.

Builder: Amrut Heights LLP

Amrut Heights LLP has 1 registration on MahaRERA, including Amrut Heights. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Amrut Heights is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Amrut Heights?

The registered promoter entity is Amrut Heights LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Amrut Heights?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Amrut Heights?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Amrut Heights?

The professionals named in the filing: Architect: De Con Consultant; Engineer: Pentacon Structural Consultants Pvt Ltd; Chartered Accountant: R C Shah & Co; Chartered Accountant: VISHWAKARMA AND CO; Chartered Accountant: AMIT PAUL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Amrut Heights?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Amrut Heights. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Amrut Heights to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.