ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Amisha Empire - Phase I

Registration lapsed No litigation declared Others project

Amisha Empire - Phase I

By Amisha Associates

RG-MH-94805 · RERA P51700010847 · Last updated on MahaRERA portal: 18 Nov 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 52 months past the filed date
  • 4 complaints at MahaRERA
  • Completion date moved by 30 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2022Possession promised52 months past this date
30 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
4Complaints at MahaRERAon this registration
Jump to the 48 documents Report an error

Amisha Empire - Phase I is a Others project by Amisha Associates in Thane, Maharashtra, registered with MahaRERA as P51700010847 on 31 Aug 2017. Possession was promised by 30 Jun 2022 and is now 52 months past that date. The completion date has moved by 30 months from the original filing. 4 complaints are on record with the regulator.

At a glance

Project

  • NameAmisha Empire - Phase I
  • TypeOthers
  • Location
    • Mira Bhayandar Road
    • Hatkesh
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700010847
  • ReraGenie IDRG-MH-94805

Builder

  • NameAmisha Associates
  • Entity typePartnership
  • PartnersBabynaaz Asif Patel, Sajid Asif Patel, Asif Gulamrasul Patel

Key dates

52 months past promisethis monthRegisteredAug 2017First promiseDec 2019Revised toJun 2022

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on31 Aug 2017
  • Promised completion30 Jun 2022
  • Revised completionRevised to 30 Jun 2022 (originally 31 Dec 2019)
  • Buildings3 building records
  • Documents filed48 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA130000
Wing BNA160000
Wing CNA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 18 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

30 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

Wing A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 18 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed16

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots16
Closed/Covered16
BuildingClosed/CoveredTotal
Wing A55
Wing B66
Wing C55

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,710 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Asif Gulamrasul PatelMira-Bhayandar (M Corp.)Thane

Approvals and building plan

Permissible FSI10966.61
Proposed, not sanctioned8,263 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSheetal Sarovar, Sheetal Nagar Mira Road East Maharashtra 401107 Dist Thane

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnish & Associates
EngineerAnish & Associates
EngineerRajesh Kumar Chaudhary
Chartered AccountantT.N.Gala & Associates
Chartered AccountantJ D Shah Associates
PartnerRole in project
Amisha Associates-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700002376Dec 2019 → Dec 2020

Reason as filed by the promoterThe Delay in completion of project is because of MBMC not issuing amendment without ULC department clearance and since the matter was pending in Supreme Court and so now we can get the ULC NOC as it is finalised after which the amendments shall be obtained and further work can be completed at site.

EXT51700009975Dec 2019 → Dec 2021

Reason as filed by the promoterHerewith attached Form E

Complaints filed with MahaRERA4

Case no.ComplainantRespondentFiled
CC006000000090157DR SAGAR S NALEAMISHA ASSOCIATES13/08/2019
CC006000000100554RAHUL S PABALEamisha associates17/08/2019
CC12401256SHAZIYA MOHAMMED SABIR ANSARIAmisha Associates28/12/2024
CC12601231Meena Mohit SharmaAmisha Associates06/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Aug 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Nov 2024

Documents filed48

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certficate_Amisha Associates.pdf18 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4- Amisha Associates.pdf18 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4- Amisha Associates.pdf18 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certficate_Amisha Associates.pdf18 Nov 2024
Declaration about Commencement CertificateFile: Declaration about commencement certificate.pdf16 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate compressed.pdf16 Jul 2021
Disclosure of sold/ booked inventoryFile: Disclosure of sold and booked inventory.pdf16 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5_FY 2019-2020.pdf15 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_30062020.pdf12 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_30092020.pdf12 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_31122020.pdf12 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_31032021.pdf12 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates_Compressed.pdf6 Jul 2021
Certificates of CA (Form 3)File: RERA Form 3_Amisha Associates_Compressed.pdf6 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5_FY 2018-19.pdf6 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Architect Certificate_Compressed.pdf5 Nov 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer Certificate_Compressed.pdf5 Nov 2018
Certificates of CA (Form 3)File: Form 3_CA Certificate_Compressed.pdf5 Nov 2018
Certificates of CA (Form 5)File: Form 5_Amisha Associates_31032018_Compressed.pdf5 Nov 2018
Certificates of CA (Form 5)File: Form 5_Amisha Associates_31032018_Compressed.pdf5 Nov 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf24 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech Certificate.pdf14 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate.pdf14 Apr 2018
Certificates of CA (Form 3)File: amisha form 3.pdf14 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG Certificate1.pdf7 Apr 2018
Certificates of CA (Form 3)File: CA_Certificate october.pdf7 Apr 2018
Certificates of CA (Form 3)File: Ca Certificate.pdf7 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-.pdf13 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-.pdf13 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-.pdf13 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineering certificate.pdf13 Mar 2018
Layout approvalFile: BLOCK PLAN 536.pdf16 Aug 2017
Building plan approvalFile: Approved_Plan _Copy.PDF16 Aug 2017
PAN CardFile: IMG_1895.pdf16 Aug 2017
Copy of the legal title reportFile: Certificate of title.pdf16 Aug 2017
Details of encumbrancesFile: Form B- Asif Patel.pdf16 Aug 2017
Copy of Layout Approval (in case of layout)File: BLOCK PLAN 536.pdf16 Aug 2017
Building Plan Approval (IOD)File: Approved_Plan _Copy.PDF16 Aug 2017
Declaration in FORM BFile: Form B Zaki Patel new.pdf16 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects certificate.pdf16 Aug 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf16 Aug 2017
Certificates of CA (Form 3)File: Form 3_Final.pdf16 Aug 2017
Proforma of Allotment letterFile: Allotment - Amisha Empire - A.pdf16 Aug 2017
Proforma of Allotment letterFile: Allotment - Amisha Empire - B.pdf16 Aug 2017
Proforma of Allotment letterFile: Allotment - Amisha Empire - C.pdf16 Aug 2017
Proforma of Allotment letterFile: RERA - Amisha Empire - Building A.pdf16 Aug 2017
Proforma of Allotment letterFile: RERA - Amisha Empire - Building B.pdf16 Aug 2017
Proforma of Allotment letterFile: RERA - Amisha Empire - Building C.pdf16 Aug 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 30 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Amisha Empire - Phase I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hatkesh7,600+ in Thane

2 kmAmisha Empire - Phase ICompleted 93Lapsed / revoked 71Other 87Dot size: filed unitsN

Filed coordinates, straight-line distance. 251 registered projects within 2 km.

Builder: Amisha Associates

Amisha Associates has 1 registration on MahaRERA, including Amisha Empire - Phase I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that Amisha Empire - Phase I shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Amisha Empire - Phase I is delayed beyond 30 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Amisha Empire - Phase I?

The registered promoter entity is Amisha Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Amisha Empire - Phase I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Amisha Empire - Phase I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Amisha Empire - Phase I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Amisha Empire - Phase I?

The professionals named in the filing: Architect: Anish & Associates; Engineer: Anish & Associates; Engineer: Rajesh Kumar Chaudhary; Chartered Accountant: T.N.Gala & Associates; Chartered Accountant: J D Shah Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Amisha Empire - Phase I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Amisha Empire - Phase I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Amisha Empire - Phase I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.