Home / Browse projects / Pune, Maharashtra / AMIGOS RESIDENCY

Registered No litigation declared Residential / Group Housing project

AMIGOS RESIDENCY

By KASTURI BUILDERS AND DEVELOPERS & PAIGUDE CONSTRUCTION

RG-MH-18926 · RERA P52100077879 · Last updated on MahaRERA portal: 19 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
1 of 1Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

AMIGOS RESIDENCY is a Residential / Group Housing project by KASTURI BUILDERS AND DEVELOPERS & PAIGUDE CONSTRUCTION in Pune, Maharashtra, registered with MahaRERA as P52100077879 on 7 Nov 2024. Possession is promised by 30 Jun 2027. 0 of the 1 unit on this registration is recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameAMIGOS RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • SINHAGAD ROAD
    • VADGAON BUDRUK
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411041
  • Pincode411041
  • RERA no.P52100077879
  • ReraGenie IDRG-MH-18926

Builder

  • NameKASTURI BUILDERS AND DEVELOPERS & PAIGUDE CONSTRUCTION
  • Entity typePartnership
  • PartnersSHAMALI VILAS CHAUDHARI, LATA NARAYAN JADHAV, NARAYAN BABURAO JADHAV
  • Named personsMAHESH KAILAS PAIGUDE, KASTURI BUILDERS AND DEVELEOPERS

Key dates

this monthRegisteredNov 2024PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Nov 2024
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed62 files

Current status

0%0 of 1 units booked

Figures as on 19 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AMIGOS RESIDENCY - Bldg DNA54101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

AMIGOS RESIDENCY - Bldg D: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 19 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed39

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots39
Closed/Covered39

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,250 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
KAPRE JADHAVAR ASSOCIATESPune (M Corp.)Pune
HARSHAL VILAS BANSODEPune (M Corp.)Pune
VITTHAL SHREEPATI BUNAGEKhandalaSatara
SOMNATH VITTHAL BUNAGEKhandalaSatara

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI3202.04
Proposed, not sanctioned1,602 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Raje Sankul, Opp. New Janta English School, Nashik Kalwan Road, Dindori.422202, Maharashtra

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHANKAR GEJAGE
EngineerShankar Dada Gejage
Chartered AccountantPhule Wagh and Associates llp
PartnerRole in project
KASTURI BUILDERS AND DEVELOPERS & PAIGUDE CONSTRUCTION-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Architect Certificate Q2 FY 2025-26.pdf19 Jun 2026
Form 2File: Form 2 Engineer Certificate Q2 FY 2025-26.pdf19 Jun 2026
Form 3File: Q2 FY 2025-26 KASTURI FORM 3 Chartered Accountant Certificate.pdf19 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory Q2 FY 2025-26.pdf19 Jun 2026
Form 1File: Form 1 Architect Certificate Q3 FY 2025-26.pdf19 Jun 2026
Form 2File: Form 2 Engineer Certificate Q3 FY 2025-26.pdf19 Jun 2026
Form 3File: Q3 FY 2025-26 KASTURI FORM 3 Chartered Accountant Certificate.pdf19 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory Q3 FY 2025-26.pdf19 Jun 2026
Form 1File: Form 1 Architect Certifiate Q4 FY 2025-26.pdf19 Jun 2026
Form 2File: Form 2 Engineer Certificate Q4 FY 2025-26.pdf19 Jun 2026
Form 3File: Q4 FY 2025-26 KASTURI FORM 3 Chartered Accountant Certificate.pdf19 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory Q4 FY 2025-26.pdf19 Jun 2026
Form 1File: Form 1 Architects Certificate_Q4.pdf14 Jul 2025
Form 2File: Form 2 Engineer Certificate_Q4.pdf14 Jul 2025
Form 3File: Q4 FY 2024-25 KASTURI DEV & PAIGUDE FORM 3 Chartered Accountant Certificate.pdf14 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold inventory_Q4.pdf14 Jul 2025
Form 1File: Form 1 Architects Certificate Q1.pdf14 Jul 2025
Form 2File: Form 2 Engineer Certificate-Updated Q1.pdf14 Jul 2025
Form 3File: Q1 FY 2025-26 KASTURI DEV & PAIGUDE FORM 3 Chartered Accountant Certificate Q1.pdf14 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Q1.pdf14 Jul 2025
Proforma of Allotment letterFile: Allotment letter proforma new.pdf26 Feb 2025
Proforma of Allotment letterFile: Allotment letter proforma new.pdf26 Feb 2025
Proforma of Agreement for saleFile: RERA Model Agreement Format.pdf28 Oct 2024
Other - FinanceFile: Affidavit scan.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf19 Oct 2024
Other - FinanceFile: Self Declaration - Jointitly Develope Project with authority Latter.pdf19 Oct 2024
Other - TechnicalFile: Land Area Decleration.pdf19 Oct 2024
Layout approvalFile: Layout_compressed.pdf18 Oct 2024
Building plan approvalFile: Plan (2)_compressed.pdf18 Oct 2024
Copy of the legal title reportFile: Format A.pdf18 Oct 2024
Details of encumbrances concerned to FinanceFile: Declaration of no Encumbrance - Legal DONE.pdf18 Oct 2024
Details of encumbrances concerned to FinanceFile: Enumbrance Certificate Finance DONE.pdf18 Oct 2024
Copy of Layout Approval (in case of layout)File: Layout_compressed.pdf18 Oct 2024
Proforma of Allotment letterFile: Allotment letter as per order 60.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KASTURI DEV and PAIGUDE FORM 3 Chartered Accountant Certificate 15102024.pdf18 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan (2)_compressed.pdf18 Oct 2024
CERSAI detailsFile: Undertaking CERSAI done.pdf18 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A Bank Decleration_v1.pdf18 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration cum Undertaking for LO Bank Account.pdf18 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Self Declaration - Bank use with Authority Latter.pdf18 Oct 2024
Details of encumbrances concerned to LegalFile: Declaration of no Encumbrance - Legal DONE.pdf18 Oct 2024
Details of encumbrances concerned to LegalFile: Enumbrance Certificate Finance DONE.pdf18 Oct 2024
Other - FinanceFile: Declaration cum Undertaking for LO Bank Account.pdf18 Oct 2024
Other - FinanceFile: Self Declaration - Bank use with Authority Latter.pdf18 Oct 2024
Other - TechnicalFile: Self Declaration - Jointitly Develope Project with authority Latter.pdf18 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf18 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Declaration cum Undertaking for LO Bank Account.pdf18 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Self Declaration - Bank use with Authority Latter.pdf18 Oct 2024
Declaration in FORM BFile: Form B Promoter_compressed.pdf15 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf15 Oct 2024
Other - LegalFile: Authority Letter.pdf15 Oct 2024
Declaration about Commencement CertificateFile: Format D-CommencementPlan.pdf15 Oct 2024
Deviation Report with respect to Allotment letterFile: Deviation Report Allotment Letter DONE.pdf15 Oct 2024
Other - TechnicalFile: Order 50 ANNEXURE A _v1.pdf15 Oct 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report AFS AMIGOS Residency.pdf15 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Disclosure of Interest in Entities - Latabai Narayan Chaudhary.pdf15 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Disclosure of Interest in Entities - Mahesh Paigude.pdf15 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Disclosure of Interest in Entities - Narayan Baburao Chaudhary.pdf15 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Disclosure of Interest in Entities - Shamali Vilas Chaudhary.pdf15 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured - unsecured loan.pdf15 Oct 2024
PAN CardFile: PAN CARDS.pdf2 Aug 2024

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AMIGOS RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VADGAON BUDRUK13,700+ in Pune

Builder: KASTURI BUILDERS AND DEVELOPERS & PAIGUDE CONSTRUCTION

KASTURI BUILDERS AND DEVELOPERS & PAIGUDE CONSTRUCTION has 1 registration on MahaRERA, including AMIGOS RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if AMIGOS RESIDENCY is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AMIGOS RESIDENCY?

The registered promoter entity is KASTURI BUILDERS AND DEVELOPERS & PAIGUDE CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AMIGOS RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AMIGOS RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AMIGOS RESIDENCY?

The professionals named in the filing: Architect: SHANKAR GEJAGE; Engineer: Shankar Dada Gejage; Chartered Accountant: Phule Wagh and Associates llp. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AMIGOS RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AMIGOS RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AMIGOS RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.